-
Chapter 1: Introduction
The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and International Port.
Additional Information
Field | Value |
---|---|
Last updated | 3 ກັນຍາ 2021 |
Created | 9 ກໍລະກົດ 2021 |
ຮູບແບບເອກະສານ | |
ການອະນຸຍາດ | Creative Commons Attribution Share-Alike |
ຊື່ | Chapter 1: Introduction |
ພາສາຂອງແຫຼ່ງຂໍ້ມູນ |
|
ລາຍລະອຽດ | The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and International Port. |