Skip to content

[Draft] Initial environmental and social impact assessment (IESIA) on sand mining to create ship route and fill Kampot Special Economic Zone and Port project

ຈັດພິມໂດຍ: Open Development Cambodia

The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a port of entry and exit, the pumped sediment will be filled at the location of the Kampot special economic zone and International Port.

ແຫຼ່ງຂໍ້ມູນ (16)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Table of Content

Additional Info

Field Value
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດທີ່ຕັ້ງ)
  • ກຳປູເຈຍ
ຫົວຂໍ້
  • Environmental impact assessments
  • Mining
  • Special economic zones
ປະເພດເອກະສານ Environmental Impact Assessment
ຄູ່ສັນຍາ
  • Kampot SEZ
ໜ່ວຍງານລັດຖະບານ (ຫຼາຍພາກສ່ວນ)
  • Ministry of Environment
  • ກະຊວງຄຸ້ມຄອງທີ່ດິນ, ການວາງແຜນ ແລະ ການກໍ່ສ້າງຕົວເມືອງ
  • Ministry of Mines and Energy
  • ກະຊວງຊັບພະຍາກອນນ້ຳ ແລະ ອຸຕຸນິຍົມວິທະຍາ
ສັນຍາລິຂະສິດ Creative Commons Attribution Share-Alike
ລິຂະສິດ No
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ສະບັບທີ / ຄັ້ງທີ 1
ພາສາຂອງເອກະສານ
  • ຂະແມ
ແຂວງ
  • ຄຳໂພດ
ຂໍ້ມູນອ້າງອີງຂອງ Metadata 

Metadata last updated on 2021-07-07. For inquiries contact: Open Development Cambodia, Email: contact@opendevcam.net, Website: http://www.opendevcam.net Address: 43 St. 208, Phnom Penh, Cambodia.

ວັນທີລົງລາຍເຊັນ 10 ເມສາ 2010
ຂໍ້ມູນຕິດຕໍ່

CES CO., LTD Address: Phnom Penh, Cambodia. Phone: (855) 12 666 462 Email: info@ces.com.kh

ສະຫຼຸບການສ້າງວຽກເຮັດງານທຳ

In this project, the company needs about 100 local workers and about 300 foreign workers.

ຈຳນວນວຽກທີ່ສ້າງ 400.0
ສະຫຼຸບການຝຶກອົບຮົມ

The company has educational programs for its employees and workers to understand environmental pollution and environmental beauty, such as: - Education on solid and liquid waste management: be careful when spilling or storing oil and pour waste only in designated containers. - Water pollution education: how to use machinery and equipment in a technical manner according to the location and time.

ພັນທະໃນການປົກປັກຮັກສາສິ່ງແວດລ້ອມ

The general process of environmental management planning in the project area includes: - Data collection and analysis by the project owner or project consultant - Preparation of monthly, quarterly and annual reports made by the project owner or project consultant - Receipt of reports and implementation of inspections and suggestions for reports by the Ministry or Department of Environment and relevant institutions.

ສະຫຼຸບກ່ຽວກັບກອງທຶນສິ່ງແວດລ້ອມ

The company plans to contribute to environmental resource restoration activities such as replanting mangrove trees in suitable locations, improving the quality of natural seagrass and natural grass planting, restoring coral planting systems in suitable locations, and conserving spawning grounds.

ຈຳນວນກອງທຶນເພື່ອສິ່ງແວດລ້ອມລວມ 3000000.0
ເອກະສານອ້າງອີງສະເພາະ Draft_IESIA_Kamport_Port__10.04.2021.pdf
ຄຳສັບຫຼັກ International Port,IEIA,Kampot Port,Kampot SEZ
ເລກທີສັນຍາແບບເປີດ ocds-miumsd-810cfa5c-314b-4b5c-bbb5-676fed97fe03
ວັນທີອັບໂຫຼດ ກໍລະກົດ 9, 2021, 06:59 (UTC)
ວັນທີດັດແປງ ຕຸລາ 5, 2022, 08:32 (UTC)