Skip to content

Progress of Cambodia power development plans and transmission interconnection projects

ຈັດພິມໂດຍ: Open Development Cambodia

The presentation slides were prepared for the 8th Meeting of the Focal Group (FG-8) of the Greater Mekong Sub-region (GMS), on 26 November 2009, at Luangprabang of the Lao People's Democratic Republic. The current development of Cambodia's power sector, and outlook of power development plan are making integral parts of the presentation.

ແຫຼ່ງຂໍ້ມູນ (1)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Progress of Cambodia Power Development Plans & Transmission Interconnection Projects

Additional Info

Field Value
ປະເພດເອກະສານ Conference/workshop proceedings and presentations
ພາສາຂອງເອກະສານ
  • ອັງກິດ
ຫົວຂໍ້
  • Electricity production
  • Energy
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດພື້ນທີ່)
  • ກຳປູເຈຍ
ລິຂະສິດ Yes
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ສະບັບທີ / ຄັ້ງທີ 1.0
ສັນຍາລິຂະສິດ CC-BY-SA-4.0
ຂໍ້ມູນຕິດຕໍ່

Ministry of Mines and Energy Electricité du Cambodge (EDC)

Address: #2, Street Yukunthor, Watphnom quarter, Daun Penh District, Phnom Penh, Cambodia. Tel: (+855) 23 723 971; (+855) 23 724 771 Fax: (+855) 23 426 018 Website: http://www.edc.com.kh/

ຜູ້ຂຽນ (ອົງການຈັດຕັ້ງ) Electricité du Cambodge (EDC)
ສະຖານທີ່ຈັດພິມ Luangprabang, Laos
ຜູ້ຈັດພິມ Electricité du Cambodge (EDC)
ປີຈັດພິມ 2009
ຈຳນວນໜ້າ 22
ເອກະສານອ້າງອີງສະເພາະ Progress_of_Cambodia_Power_Development__26.11.2009.pdf
ວັນທີອັບໂຫຼດ ກຸມພາ 25, 2016, 03:35 (UTC)
ວັນທີດັດແປງ ກໍລະກົດ 14, 2016, 03:55 (UTC)