Skip to content

Lower Sesan II hydropower project

ຈັດພິມໂດຍ: Open Development Cambodia

The Lower Sesan 2 (LS2) hydropower project​ has installed capacity of 400MW, with a height of 75 meters and length of 6 kilometers. It will be implemented in Sesan district, Stung Treng province. Despite the environmental impact assessment (EIA) falling to meet international best practice, Cambodia's cabinet approved the project in late 2012. With the total estimated cost of US$ 781 million, most of which was allegedly reported from China's bank loans, the project is running under 40-years "built-operate-transfer"(BOT) concessional contract.

ແຫຼ່ງຂໍ້ມູນ (1)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Lower Sesan II hydropower project

Additional Info

Field Value
ປະເພດເອກະສານ Reports, journal articles, and research papers (including theses and dissertations)
ພາສາຂອງເອກະສານ
  • ອັງກິດ
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດພື້ນທີ່)
  • ກຳປູເຈຍ
ລິຂະສິດ Yes
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ສະບັບທີ / ຄັ້ງທີ 1.0
ສັນຍາລິຂະສິດ CC-BY-SA-4.0
ຂໍ້ມູນຕິດຕໍ່

Mekong Watch Address: 3F AOKI Bldg. 1-12-11 Taito, Taito-ku, Tokyo 110-0016, Japan Contact: Tel: +81 3 3832 5034, Fax: +81 3 3832 5039 Website: http://www.mekongwatch.org/english/index.html E-mail: info@mekongwatch.org

ຜູ້ຂຽນ (ອົງການຈັດຕັ້ງ) Mekong Watch
ສະຖານທີ່ຈັດພິມ Tokyo
ຜູ້ຈັດພິມ Mekong Watch
ປີຈັດພິມ 2015
ຈຳນວນໜ້າ 1
ເອກະສານອ້າງອີງສະເພາະ Mekong_watch_lower_sesan2_16.02.2015.pdf
ວັນທີອັບໂຫຼດ ກຸມພາ 26, 2016, 03:42 (UTC)
ວັນທີດັດແປງ ກໍລະກົດ 22, 2024, 03:09 (UTC)