Skip to content

Final Report on Data Collection Survey on Electric Power Sector in Cambodia

ຈັດພິມໂດຍ: Open Development Cambodia

A final data collection survey on electric power sector in Cambodia prepared by JICA. The purpose of the study is to grasp the latest trend in the power sector in Cambodia, and to collect and collate the data needed to examine specific areas where cooperation is required in this sector. The study was supported by the Ministry of Industry, Mines and Energy (MIME), the Electricity Authority of Cambodia, and the Electricité du Cambodge (EDC). The road map covering the study is shown in the report.

ແຫຼ່ງຂໍ້ມູນ (1)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Data Collection Survey on Electric Power Sector in Cambodia

Additional Info

Field Value
ປະເພດເອກະສານ Reports, journal articles, and research papers (including theses and dissertations)
ພາສາຂອງເອກະສານ
  • ອັງກິດ
ຫົວຂໍ້
  • Development and funding for electricity
  • Electricity infrastructure
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດພື້ນທີ່)
  • ກຳປູເຈຍ
ລິຂະສິດ Yes
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ສະບັບທີ / ຄັ້ງທີ 1.0
ສັນຍາລິຂະສິດ CC-BY-SA-4.0
ຂໍ້ມູນຕິດຕໍ່

JICA Cambodia Office Address: 6th,7th,8th Floors, Building #61-64, Preah Norodom Blvd, Phnom Penh, Cambodia Tel: (855-23) 211673 Fax: (855-23) 211675

ຜູ້ຂຽນ (ອົງການຈັດຕັ້ງ) Japan International Cooperation Agency
ຜູ້ຈັດພິມ Japan International Cooperation Agency
ປີຈັດພິມ 2012
ເອກະສານອ້າງອີງສະເພາະ JICA_Data_Collection_Survey_on_Electric_Power_Sector_in_Cambodia_Final_Report__2012.pdf
ວັນທີອັບໂຫຼດ ມິຖຸນາ 30, 2016, 01:57 (UTC)
ວັນທີດັດແປງ ສິງຫາ 27, 2021, 10:24 (UTC)