Skip to content

Chinese-built Lower Stung Russei Chrum

ຈັດພິມໂດຍ: Open Development Cambodia

Chinese-built Russei Chrum River Hydropower dam with a capacity of 338MW has begun operation after nearly five years of construction.The construction is agreed under the 35 years of build-operate-transfer(BOT) between China Huadian Corp and the Royal Government of Cambodia (RGC).

ແຫຼ່ງຂໍ້ມູນ (1)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Chinese-built Lower Stung Russei Chrum

Additional Info

Field Value
ປະເພດເອກະສານ Archived web content
ພາສາຂອງເອກະສານ
  • ອັງກິດ
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດພື້ນທີ່)
  • ກຳປູເຈຍ
ລິຂະສິດ Yes
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ສະບັບທີ / ຄັ້ງທີ 1.0
ສັນຍາລິຂະສິດ CC-BY-4.0
ຂໍ້ມູນຕິດຕໍ່

Offical Website: http://www.globalpost.com

ຜູ້ຂຽນ (ອົງການຈັດຕັ້ງ) Global post
ຜູ້ຈັດພິມ Global post
ປີຈັດພິມ 2015
ຈຳນວນໜ້າ 1
ເອກະສານອ້າງອີງສະເພາະ Globalpost_Lower_Russei_Chrum__12.01.2015.pdf
ວັນທີອັບໂຫຼດ ກຸມພາ 26, 2016, 02:58 (UTC)
ວັນທີດັດແປງ ກໍລະກົດ 22, 2024, 03:16 (UTC)