SN Power_ESIA of Middle Yeywa Hydropower Project

ຈັດພິມໂດຍ: Open Development Myanmar

This Environmental and Social Impact Assessment Report (ESIA) is prepared by a combined team of international and national experts on behalf of SN Power, for the Middle Yeywa Hydropower Project on the Myitnge (Nam Tu) River located in Shan State. The baseline data survey is done from 2015 to 2018 and the EIA is intended to meet the requirements of Myanmar EIA Procedures (2015) and Environmental Compliance Certificate (ECC) under the Ministry of Natural Resources and Environmental Conservation (MONREC).

ແຫຼ່ງຂໍ້ມູນ (2)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - ESIA_Middle Yeywa Hydropwer Project

Additional Info

Field Value
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດທີ່ຕັ້ງ)
  • ມຽນມາ
ຫົວຂໍ້
  • Environmental impact assessments
  • Hydropower dams
ປະເພດເອກະສານ Environmental Impact Assessment
ຄູ່ສັນຍາ
  • SN Power Invest Netherlands B.V.
ໜ່ວຍງານລັດຖະບານ (ຫຼາຍພາກສ່ວນ)
  • ກະຊວງການໄຟຟ້າ ແລະ ພະລັງງານ
  • ກະຊວງຊັບພະຍາກອນທຳມະຊາດ ແລະ ອະນຸລັກສິ່ງແວດລ້ອມ
ຊື່ສັນຍາສຳປະທານ/ໃບອະນຸຍາດ ESIA for Middle Yeywa Hydropower Project
ຮູບແບບການເປີດເຜີຍຂໍ້ມູນ ປ່ອຍໂດຍລັດຖະບານ
ສັນຍາລິຂະສິດ

No license given

ລິຂະສິດ No
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form, and content for any loss, harm or damage suffered as a result of its use.

ສະບັບທີ / ຄັ້ງທີ 1
ພາສາຂອງເອກະສານ
  • ອັງກິດ
  • ມຽນມາ
ແຂວງ
  • ຊານ
ລີ້ງເພື່ອໄປຫາແຫຼ່ງຂໍ້ມູນ http://www.ecd.gov.mm/sites/default/files/Law%20PDF/Middle%20Yeywa%20EIA%20report.pdf
ພັນທະຂອງຄູ່ສັນຍາໃນການຈັດຕັ້ງປະຕິບັດໂຄງການ

In relation to the requirements from international funders and national environmental authorities, SN Power will have the overall responsibility for implementing and coordinating all social and environmental mitigation activities and programs.

ພັນທະໃນການປົກປັກຮັກສາສິ່ງແວດລ້ອມ

Environmental and Social Unit (ESU) of the company will implement preventative measures to protect the environment by carrying out environmental monitoring and supervision during the project phases in cooperation with the contractors.

ສະຫຼຸບກ່ຽວກັບກອງທຶນສິ່ງແວດລ້ອມ

The total estimated cost for implementing environmental and social management plans is 13,261,450 USD for pre-construction (1 year) and construction (6 years).