Skip to content

[Draft] Environmental Impact Assessment: Cambodia Block A Development

ຈັດພິມໂດຍ: Open Development Cambodia

Chevron Overseas Petroleum (Cambodia) plans to develop the Apsara field in the Block A concession, which is 4 709 square km in area and located approximately 157 km offshore from the Cambodian mainland. The scope of this EIA study is Phase 1 of the Block A development project including the initial production and processing platform, potential development of three additional platforms and potential development of the remaining six platforms. After receiving the license in 2002, 18 wells have been drilled.

ແຫຼ່ງຂໍ້ມູນ (6)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Environmental Impact Assessment: Cambodia Block A Development (Part 1)

Additional Info

Field Value
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດທີ່ຕັ້ງ)
  • ກຳປູເຈຍ
ຫົວຂໍ້
  • Extractive industries
  • Off-shore oil and gas exploration and extraction
  • Oil and gas resources
ປະເພດເອກະສານ Environmental Impact Assessment
ຄູ່ສັນຍາ
  • Agro Star Investment
  • Cambodia Hai Lan Mineral Co. Ltd.
  • Chevron Overseas Petroleum (Cambodia) Limited
ໜ່ວຍງານລັດຖະບານ (ຫຼາຍພາກສ່ວນ)
  • ລັດຖະມົນຕີສິ່ງແວດລ້ອມ
  • ລັດຖະມົນຕີກະຊວງບໍ່ແຮ່ ແລະ ພະລັງງານ
  • ນາຍົກລັດຖະມົນຕີ
ຮູບແບບການເປີດເຜີຍຂໍ້ມູນ ປ່ອຍໂດຍອົງການທ້ອງຖິ່ນທີ່ບໍ່ແມ່ນລັດຖະບານ
ສັນຍາລິຂະສິດ CC-BY-SA-4.0
ລິຂະສິດ To be determined
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

ສະບັບທີ / ຄັ້ງທີ 1
ພາສາຂອງເອກະສານ
  • ອັງກິດ
  • ຂະແມ
ແຂວງ
  • ບັນເຕມຽນເຈ
  • ພ໌ເຣອາສີຫະນຸກ
ຂໍ້ມູນອ້າງອີງຂອງ Metadata 

Metadata last updated on 2018-05-03. For inquiries contact: Open Development Cambodia, Email: contact@opendevcam.net, Website: http://www.opendevcam.net Address: 43 St. 208, Phnom Penh, Cambodia.

ຂໍ້ມູນຕິດຕໍ່

International Environmental Management Co. Ldt. (IEM)

Address: Bangkok (Head Office)​ 8th Floor, Sitthivorakit Building, 5 Soi Pipat, Silom Road, Bangrak, Bangkok 10500, Thailand. Tel: (66-2) 636.6390-9, 636.6683-4, Fax: (66-2) 236-6276, E-mail: ron@iem-global.com

ເນື້ອທີ່ອະນຸມັດ 470900.0
ແຜນການນຳໃຊ້ທີ່ດິນ Year 0, Platform A Installation, Drilling and Hook up and commissioning service (HUC); Year 3, Installation, Drilling and HUC B; Year 4, Installation, Drilling and HUC C; Year 4, Installation, Drilling and HUC D; Year 5, Installation, Drilling and HUC E; Year 5, Installation, Drilling and HUC F; Year 6, Installation, Drilling and HUC G; Year 7, Installation, Drilling and HUC H; Year 8, Installation, Drilling and HUC I; Year 9, Installation, Drilling and HUC J3
ຫົວໜ່ວຍແຜນການນຳໃຊ້ທີ່ດິນ Ha
ສະຫຼຸບການສ້າງວຽກເຮັດງານທຳ

Core operations require 50 people during phase 1 a. Approximately 30 people total will be needed to run the ship and 20 people total to run the facilities. Additional personnel may be required for Phase 1 c. Where appropriate, the use of local business firms and employees will be a priority for Chevron and partners.

ຈຳນວນວຽກທີ່ສ້າງ 50.0
ພັນທະໃນການປົກປັກຮັກສາສິ່ງແວດລ້ອມ

Environmental monitoring measures will be taken to verify the effectiveness of mitigation measure on various aspects such as seawater and sediment, fishing, tourism, air quality, rare and endangered species, greenhouse gas emission, under water noise, drill cutting and mud, waste generation, and benthos.

ໂຄງການທີ່ກ່ຽວຂ້ອງ

Oil and Gas Block A: https://opendevelopmentcambodia.net/en/profiles/oil-and-gas-blocks/?feature_id=27

ເອກະສານອ້າງອີງສະເພາະ Draft_EIA_report_Cheveron__00.03.2012.pdf
ເລກທີສັນຍາແບບເປີດ ocds-miumsd-b77e2ed5-64c3-4fd9-a706-76c8a82792ba
ວັນທີອັບໂຫຼດ ພະຈິກ 1, 2018, 02:35 (UTC)
ວັນທີດັດແປງ ກັນຍາ 27, 2021, 04:34 (UTC)