[Draft] Initial environmental impact assessment on 230kV high voltage transmission lines project from Stung Hav substation to the western substation of Phnom Penh
ຈັດພິມໂດຍ: Open Development Cambodia
ແຫຼ່ງຂໍ້ມູນ (20)
ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - Table of contents
Additional Info
Field | Value |
---|---|
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດທີ່ຕັ້ງ) |
|
ຫົວຂໍ້ |
|
ປະເພດເອກະສານ | Environmental Impact Assessment |
ຄູ່ສັນຍາ |
|
ໜ່ວຍງານລັດຖະບານ (ຫຼາຍພາກສ່ວນ) |
|
ຊື່ສັນຍາສຳປະທານ/ໃບອະນຸຍາດ | Co. 9452 / 07P |
ສັນຍາລິຂະສິດ | Creative Commons Attribution Share-Alike |
ລິຂະສິດ | No |
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້ |
By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use. |
ສະບັບທີ / ຄັ້ງທີ | 1 |
ພາສາຂອງເອກະສານ |
|
ແຂວງ |
|
ຂໍ້ມູນອ້າງອີງຂອງ Metadata |
Metadata last updated on 2021-04-22. For inquiries contact: Open Development Cambodia, Email: contact@opendevcam.net, Website: http://www.opendevcam.net Address: 43 St. 208, Phnom Penh, Cambodia. |
ຂໍ້ມູນຕິດຕໍ່ |
Creative Green Design Co., Ltd Address: No. 322P, Street 271Z, Sangkat Terk Tla, Khan Resey Keo, Phnom Penh. Tel: (855-11)845 695/097 204 6789 Email: saphoeuntous09@yahoo.com/www.CREATIVE09.com |
ໄລຍະສັນຍາ | 99.0 |
ຫົວໜ່ວຍຂອງໄລຍະສັນຍາ | ປີ |
ພັນທະຂອງຄູ່ສັນຍາໃນການຈັດຕັ້ງປະຕິບັດໂຄງການ |
Alex Corporation Co., LTD has invested US$ 119,146,000. The company has experience in the construction of coal-fired power lines and hydropower projects. The 230-kV transmission line project is proposed to build 426 power poles with a total length of 198 km. The company needs domestic and foreign labor force up to 300 to 400 people, of which 10% are foreign workers. |
ສະຫຼຸບການສ້າງວຽກເຮັດງານທຳ |
This transmission line project provides job opportunities and income: - During the construction phase, some people may be selected to work as construction workers according to their professional level. - It is easy to do business because when there is enough electricity, people can sell at night, can travel at night, and sales grow more than before. |
ຈຳນວນວຽກທີ່ສ້າງ | 400.0 |
ສະຫຼຸບການຝຶກອົບຮົມ |
The required domestic and foreign labor force is 300 to 400 people, of which 10% are foreign workers. |
ພັນທະໃນການປົກປັກຮັກສາສິ່ງແວດລ້ອມ |
During the construction phase, a number of construction activities, such as land clearing, land reclamation, construction of workers' shelters, transportation of materials, etc., may affect physical, biological and socio-economic. Measures to reduce some of the side effects are identified as well. |
ການປົກປັກຮັກສາວັດທະນະທຳສັງຄົມ |
The 230 kV transmission line project will affect 1,318 households in 3 provinces, 7 districts and 19 communes. The study on compensation costs varies from region to region and from village to village. The company will have a plan to deal with these affected plots of land and dwellings, with compensation based on actual costs. According to the results of the compensation, the company has settled for the people in Kampong Speu about 22 percent, Sihanoukville 100 percent, and Koh Kong 100 percent. |
ເອກະສານອ້າງອີງສະເພາະ | Draft_EIA_Alex_Corporation__00.00.2016.pdf |
ຄຳສັບຫຼັກ | Power Transmission Lines Project,Alex Corporation,electricity line |
ເລກທີສັນຍາແບບເປີດ | ocds-miumsd-b7c4c7fb-39fa-4993-8124-854b489757cc |
ວັນທີອັບໂຫຼດ | ກໍລະກົດ 15, 2021, 03:24 (UTC) |
ວັນທີດັດແປງ | ກັນຍາ 23, 2021, 13:46 (UTC) |