Skip to content

[Draft] Completed Environmental and Social Impact Assessment on Koh Krabey Resort Development Project of R.P.B Investment Co., Ltd

ຈັດພິມໂດຍ: Open Development Cambodia

The specific objectives of the full environmental and social impact assessment study on the Koh Krabey Resort Development Project are: 1. Study the existing biological environmental resources in the region (forest resources, wildlife, fishery resources, corals, and biodiversity). 2. Study the physical environmental resources in the project area (water, soil, and climatic conditions).  3. Study on socio-economic environmental resources near the project area. 4. Study the layout project of leisure houses, ports, and other infrastructure.  5. Analyze the economic and environmental value of the development project. 6. Analyze and evaluate the impacts on natural resources and society caused by from project activities. 7. Determine measures to reduce negative environmental impacts to a minimum level and in line with the project's environmental management plan.

ແຫຼ່ງຂໍ້ມູນ (1)

ເບິ່ງຕົວຢ່າງຂໍ້ມູນ - [Draft] Completed Environmental and Social Impact Assessment on Koh Krabey Resort Development Project of R.P.B Investment Co., Ltd

Additional Info

Field Value
ພື້ນທີ່ພູມສັນຖານ (ຂອບເຂດທີ່ຕັ້ງ)
  • ກຳປູເຈຍ
ຫົວຂໍ້ Environmental impact assessments
ປະເພດເອກະສານ Environmental Impact Assessment
ຄູ່ສັນຍາ
  • RPB Investment Co., Ltd
ໜ່ວຍງານລັດຖະບານ (ຫຼາຍພາກສ່ວນ)
  • Ministry of Environment
ຊື່ສັນຍາສຳປະທານ/ໃບອະນຸຍາດ Reclassification from public property to state private property in Koh Krabey area, located in Ong Ream village, Prey Nob district, Preah Sihanouk province.
ຮູບແບບການເປີດເຜີຍຂໍ້ມູນ ປ່ອຍໂດຍບໍລິສັດ
ສັນຍາລິຂະສິດ

No license given

ລິຂະສິດ No
ຂໍ້ຈຳກັດໃນການເຂົ້າເຖິງ ແລະ ນຳໃຊ້

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use.

ສະບັບທີ / ຄັ້ງທີ 1
ພາສາຂອງເອກະສານ
  • ຂະແມ
ແຂວງ
  • ພ໌ເຣອາສີຫະນຸກ
ຂໍ້ມູນອ້າງອີງຂອງ Metadata 

Metadata last updated on 2018-08-12. For inquiries contact: Open Development Cambodia, Address: 23B St. 606, Phnom Penh, Cambodia. Email: contact@opendevcam.net, Website: http://www.opendevcam.net

ວັນທີລົງລາຍເຊັນ 12 ພະຈິກ 2015
ຂໍ້ມູນຕິດຕໍ່

The report is prepared by Creative Green Design Co., Ltd. Address: #322P, St.271Z, Sangkat Terk Tla, Khan Resey Keo, Phnom Penh. Tel: (855-11) 845 695/ 097 204 6789 Email: saphoeuntous09@yahoo.com

ເນື້ອທີ່ອະນຸມັດ 10.0
ໄລຍະສັນຍາ 99.0
ຫົວໜ່ວຍຂອງໄລຍະສັນຍາ ປີ
ແຜນການນຳໃຊ້ທີ່ດິນ 10
ຫົວໜ່ວຍແຜນການນຳໃຊ້ທີ່ດິນ Ha
ພັນທະຂອງຄູ່ສັນຍາໃນການຈັດຕັ້ງປະຕິບັດໂຄງການ

The Koh Krabey Resort Development Project is divided into 5 main projects, including - The first area development project for the construction of a natural recreation house with a total area of 7.5 hectares.  - The second area development project includes a restaurant with a bar, a shared swimming pool, a spa/gym, a library/arts venue/performance venue, a flower garden, and a reception area (guest arrival) with a total area of 1 hectare.  - The third zone development project is organized as a tourist port/port for technical equipment/technical facilities, staff accommodation, and police or security headquarters with a total area of 1.5 hectares.  - The fourth zone development project is designed to provide information on ports and car parks with a total area of 1,000 square meters.  - The 5th Zone Development Project will be organized as a reception area for supplies, warehouses, engineering workshops, canoe repair workshops, human resource offices, staff training rooms, accounting offices, parking lots/motorbikes of staff, and fuel storage room for boats with a total area of 500 square meters.

ສະຫຼຸບການສ້າງວຽກເຮັດງານທຳ
  • In the construction phase of the project: The company needs a total of 600-700 local workers (Khmer) and 30 office workers, of which 15 are foreigners (Russians).
  • In the project execution phase, the company needs a total of 130 local workers (Khmer) and at least 10 foreigners (Russians).
ຈຳນວນວຽກທີ່ສ້າງ 130.0
ສະຫຼຸບການຝຶກອົບຮົມ

This training company will pay all the entire cost. The company owner provided the additional courses of training to the employees, including the following: - Training knowledge on techniques for using or controlling all kinds of machinery during the construction and operation of the project.  - Training knowledge on safety protection while working on the project and educating workers to wear health protection equipment while working.  - Training and dissemination of laws and regulations  - Training and education on methods to prevent various epidemics, especially AIDS. - Training and education on how to help protect the environment in and around the project area and knowledge of inspections related to environmental management plans.  - Train workers in solid-liquid management during construction, project implementation, and project completion. - Train staff and workers to love the forest; prohibit deforestation. - Train and educate staff not to cause activities that could affect fisheries and coral reefs around the island. - Training on how to swim and rescue someone is drowned.

ພັນທະໃນການປົກປັກຮັກສາສິ່ງແວດລ້ອມ

The Company has taken measures to mitigate a number of environmental impacts such as: forest resources, wildlife, air pollution, noise disturbances, groundwater and groundwater quality, public health and well-being, and the Company has divided it into three phases: pre-project execution, during execution and post-project completion.

ການປົກປັກຮັກສາວັດທະນະທຳສັງຄົມ

The project will provide social and environmental benefits such as:  1) For people to get jobs, trade more than before, and build infrastructure;  2) For the national society, the state receives money from paying taxes, receives money for environmental and social protection, and promotes the domestic tourism sector.

ສະຫຼຸບກ່ຽວກັບຄວາມຮັບຜິດຊອບດ້ານການເງິນ
  • For state tax, companies investing in Koh Krabey are required to pay 3% (3%) of gross income annually (from 1 to 15 January next year). 
  • In the case of calculating the rate of gross income less than the calculation of the minimum wage, the company will be required to pay a minimum wage tax of $ 8,400 per year and will increase by $ 1,050 every five years until the end of the contract.
ຈຳນວນພາສີອາກອນລວມ 100000.0
ສະຫຼຸບກ່ຽວກັບກອງທຶນສິ່ງແວດລ້ອມ
  • Environmental Fund from Year 1 to 20 onwards: Participate in tree planting totaling USD 50,000 and conservation of biodiversity totaling USD 50,000.
ຈຳນວນກອງທຶນເພື່ອສິ່ງແວດລ້ອມລວມ 50000.0
ເອກະສານອ້າງອີງສະເພາະ Draft_IESIA_R.P.B_Investment__09.10.2015.pdf
ຄຳສັບຫຼັກ Koh Krabey Resort Development Project,R.P.B Investment,Koh Krabey,Preah Sihanouk,Creative Green Design,EIA,IESIA,Complete Environmental and Social Impact Assessment,Environmental Impact Assessment
ເລກທີສັນຍາແບບເປີດ ocds-miumsd-e673e97d-e029-40eb-b8cf-b1bc5bd368b4
ວັນທີອັບໂຫຼດ ສິງຫາ 12, 2024, 10:24 (UTC)
ວັນທີດັດແປງ ກຸມພາ 4, 2025, 08:30 (UTC)