Skip to content

Progress of Cambodia power development plans and transmission interconnection projects

The presentation slides were prepared for the 8th Meeting of the Focal Group (FG-8) of the Greater Mekong Sub-region (GMS), on 26 November 2009, at Luangprabang of the Lao People's Democratic Republic. The current development of Cambodia's power sector, and outlook of power development plan are making integral parts of the presentation.

Data Resources (1)

Data Resource Preview - Progress of Cambodia power development plans and transmission interconnection projects

Additional Info

Field Value
Document type Conference/workshop proceedings and presentations
Language of document
  • English
Topics
  • Electricity production
  • Energy
Geographic area (spatial range)
  • Cambodia
Copyright Yes
Access and use constraints

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

Version / Edition 1.0
License CC-BY-SA-4.0
Contact

Ministry of Mines and Energy Electricité du Cambodge (EDC)

Address: #2, Street Yukunthor, Watphnom quarter, Daun Penh District, Phnom Penh, Cambodia. Tel: (+855) 23 723 971; (+855) 23 724 771 Fax: (+855) 23 426 018 Website: http://www.edc.com.kh/

Author (corporate) Electricité du Cambodge (EDC)
Publication place Luangprabang, Laos
Publisher Electricité du Cambodge (EDC)
Publication date 2009
Pagination 22
Legacy reference document Progress_of_Cambodia_Power_Development__26.11.2009.pdf
Date uploaded February 25, 2016, 03:35 (UTC)
Date modified May 15, 2024, 02:21 (UTC)