-
Sub-decree No.186 on on downsizing 402.04 hectar from forest cover 2002 in Sambor district Kratie province and reclassification of private state land for granting as Pnong indigenous communal ownership for 1 community and land parcel rights
One Pnong indigenous community with 37 families in Ou Kork village, Ou Krean commune, Sambor district, Kratie province was granted ownership on a communal land with the size of ...
-
Sub-decree No.239 on downsizing a total land area of 358.51 hectare in Keo Seima district, Mondulkiri province from Seima Biodiversity Protected Area and reclassification as "State Private Land" for granting purpose to Pnong indigenous communal ownership of 1 community with 31 families
A total land area of 358.51 hectares was given the mandate to Land Management Committee of Mondulkiri province to manage and distribute State Private Land for granting as commun...
-
Sub-decree No.250 on on downsizing 512.42 hectars in Keo Seima district, Mondulkiri province from Snoul Wildlife Sancuary, Seima Biodiversity Conservation in Mondulkiri and Forest Cover 2002 for reclassification of private state land and land planned for social land concession for granting as Pnong indigenous communal ownership for 1 community with 93 families
Land area of 512.42 hectare was given to Management Committee of State Land in Mondulkiri to manage and provide land as a Communal Ownership to 93 families of Pnong indigenous c...
-
Sub-decree No.247 on downsizing a total land area of 406.88 hectares in Keo Seima district, Mondulkiri province from Snoul Wildlife Sancuary, Seima Biodiversity Protected Area and land area of forest cover 2002 and reclassification as "State Private Land"; As well as downsizing from a land planned for social land concession for granting purpose to Pnong indigenous communal ownership of 1 community with 80 families
Land area of 406.88 hectare was given to Management Committee of State Land in Mondulkiri to manage and provide land as a Communal Ownership to 80 families of Pnong indigenous c...
-
Collection of manuals on a process and methodology for identifying and registering indigenous people communities as legal persons, and registration of indigenous people's communal land
The annex of Collection of manuals on a process and methodology for identifying and registering indigenous people communities as legal persons, and registration of indigenous p...
-
Sub-decree No.124 on downsizing 605.8134 hectares in Ou Chum district, Ratanakiri province from forest cover 2002 and reclassifying to private state land for granting purpose to Tumpoun indigenous communal ownership for one community and issue ownership of land parcel
Land area of 605.8134 hectare in Ou Chum district, Ratanakiri province has downsized from Forest Cover 2002 and reclassified as "State Private Land" for granting purpose as comm...
-
Sub-decree No.125 on downsizing 1496.3127 hectares in Ou Chum district, Ratanakiri province from forest cover 2002 and reclassifying to private state land for granting purpose to Kreung indigenous communal ownership for one community and issue ownership of land parcel
Land area of 1496.3127 hectare in Ou Chum district, Ratanakiri province has downsized from Forest Cover 2002 and reclassified as "State Private Land" for granting purpose as com...
-
Irrigation reform in Asia a review of 108 cases of irrigation management transfer
Like the proverbial happy families of Tolstoy, it is thought that all successful water users associations (WUA’s) have intrinsic commonalities and once these are understood, WUA...
-
Progress of Cambodia Power Development Plans & Transmission Interconnection Projects
This presentation is prepared by Electricité du Cambodge (EDC). It focused on Current Development of Power Sector and Outlook of Power Development Plan.
-
Cambodia: Greater Mekong Subregion Transmission Project
This report has 4 main sections namely project description, evaluation of design and implementation, evaluation of performance and overall assessment and recommendations. This p...
-
List of_EIAs on September 2013
This is a list of record on the Environmental Impact Assessment (EIA) received by a local organization in Cambodia, NGO Forum, as of September 2013. The table consists of 71 EIA...
-
Lower Sesan 2 Hydropower Dam: Brief
This dataset has no description
-
ESIA: Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province
This document is a part of the report of Environmental and Social Impact Assessment (ESIA) for Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province developed by ...
-
Kamchay Dam: GPS Coordinate
Kamchay Hydroelectric Development Project was contracted for 44 years including 4 years of construction by Sinohydro Kamchay Hydroelectric Co,Ltd. The construction was planned t...
-
Concession bibliography
The concession biography is compiled by the land and livelihood program of NGO Forum on Cambodia. A list of the publications and laws extends over various issues of (economic la...
-
-
Profiles of 12 Proposed Mainstream Developments in the LMB
This is a PowerPoint Presentation of SEA Team on Profiles of 12 Proposed Mainstream Developments in the LMB during the Regional Impacts Assessment Workshop in Vientiane, 2010. T...
-
PM Opens Kampot Hydrodam
The Chinese-built Kamchay dam project is located in Kampot province with a large production capacity of 193.2MW and total cost of 280 million US dollars has inaugurated by prim...
-
Rapid Assessment of Prey Lang Forest
This report was prepared by Aruna Technology Lt d. (“Aruna”, the Consultant) for the East-West Management Institute (EWMI) as the final output for a contract to conduct a rapid...
-
Stung Cheay Areng Hydropower Dam: Brief
This brief summary about Stung Cheay Areng Hydropower dam by the Earthrights International outlines the general overview, involvement of the Chinese companies in the project, i...