Skip to content

5,716 datasets found

Filter Results
  • Irrigation reform in Asia a review of 108 cases of irrigation management transfer

    Like the proverbial happy families of Tolstoy, it is thought that all successful water users associations (WUA’s) have intrinsic commonalities and once these are understood, WUA...

  • Progress of Cambodia Power Development Plans & Transmission Interconnection Projects

    This presentation is prepared by Electricité du Cambodge​ (EDC). It focused on Current Development of Power Sector and Outlook of Power Development Plan.

  • Cambodia: Greater Mekong Subregion Transmission Project

    This report has 4 main sections namely project description, evaluation of design and implementation, evaluation of performance and overall assessment and recommendations. This p...

  • List of_EIAs on September 2013

    This is a list of record on the Environmental Impact Assessment (EIA) received by a local organization in Cambodia, NGO Forum, as of September 2013. The table consists of 71 EIA...

  • Stung Atay Hydropower Plan

    Stung Atay Hydropower Plan, located in Western Cambodia on the Atay River, worth US$255 million and undertaken by China Datang Cooperation. The dam has been a work-in-progress s...

  • 120 MW plant in Cambodia to start operation this week

    Atai plant sited in Pursat, Western Cambodia, invested by the China Datang Corporation worth 255 million USD under a concessional contract of 34 years “Build-Operate-Transfer (B...

  • Lower Sesan 2 Hydropower Dam: Brief

    This dataset has no description


  • ESIA: Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province

    This document is a part of the report of Environmental and Social Impact Assessment (ESIA) for Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province developed by ...

  • Kamchay Dam: GPS Coordinate

    Kamchay Hydroelectric Development Project was contracted for 44 years including 4 years of construction by Sinohydro Kamchay Hydroelectric Co,Ltd. The construction was planned t...

  • Concession bibliography

    The concession biography is compiled by the land and livelihood program of NGO Forum on Cambodia. A list of the publications and laws extends over various issues of (economic la...

  • Sub-decree on land conversion of 4,674 hectares in Veal Veng district Pursat province

    Located in Chay Lork village, O'som commune, Veal Veng distric, Pursat province, land size of 4,674 hectares was converted into state private property used for the investment of...

  • Location Map on Kamchay Hydroelectric Project in Kampot Province

    Scale 1:120000

  • Profiles of 12 Proposed Mainstream Developments in the LMB

    This is a PowerPoint Presentation of SEA Team on Profiles of 12 Proposed Mainstream Developments in the LMB during the Regional Impacts Assessment Workshop in Vientiane, 2010. T...

  • PM Opens Kampot Hydrodam

    The Chinese-built Kamchay dam project is located in Kampot province with a large production capacity of 193.2MW and total cost of 280 million US dollars has inaugurated by prim...

  • Rapid Assessment of Prey Lang Forest

    This report was prepared by Aruna Technology Lt d. (“Aruna”, the Consultant) for the East-West Management Institute (EWMI) as the final output for a contract to conduct a rapid...

  • Stung Cheay Areng Hydropower Dam: Brief

    This brief summary about Stung Cheay Areng Hydropower dam by the Earthrights International​ outlines the general overview, involvement of the Chinese companies in the project, i...

  • Opposition to proposed Stung Cheay Areng Dam

    The site for proposed 260-MW Stung Cheay Areng Dam is located in Central Cardamom Protected Forest. China-based Sinohydro Resources is contracted by the Cambodian government for...

  • Protecting Land Rights in Ratanakiri, Cambodia

    Ratanakiri is divided into 9 districts covering 240 villages and approximately 100,000 people. Of these, 65% are minority hill tribes comprising groups such as the Jarai, Tamp...

  • Sub-decree No.62 on downsizing a total land area of 711,31 hectare in Keo Seima district, Mondulkiri province from Seima Biodiversity Protected Area and reclassification as State Private Land for granting purpose to Pnong indigenous communal ownership of 72 families and issue ownership of land parcel

    A total land area of 711,31 hectare in Keo Seima district of Mondulkiri province is downsized from Seima Biodiversity Protected Area and reclassified as "State Private Land" fo...

  • Lessons learnt of communal land titling for indigenous community in La In village Ratanakiri province, Northeast Cambodia

    Documentation on lessons learnt was done in order to enhance the knowledge of indigenous people and other stakeholders so they would understand the process of land titling for i...