Collection of manuals on a process and methodology for identifying and registering indigenous people communities as legal persons, and registration of indigenous people's communal land
The annex of Collection of manuals on a process and methodology for identifying and registering indigenous people communities as legal persons, and registration of indigenous p...
-
Sub-decree No.124 on downsizing 605.8134 hectares in Ou Chum district, Ratanakiri province from forest cover 2002 and reclassifying to private state land for granting purpose to Tumpoun indigenous communal ownership for one community and issue ownership of land parcel
Land area of 605.8134 hectare in Ou Chum district, Ratanakiri province has downsized from Forest Cover 2002 and reclassified as "State Private Land" for granting purpose as comm...
-
Sub-decree No.125 on downsizing 1496.3127 hectares in Ou Chum district, Ratanakiri province from forest cover 2002 and reclassifying to private state land for granting purpose to Kreung indigenous communal ownership for one community and issue ownership of land parcel
Land area of 1496.3127 hectare in Ou Chum district, Ratanakiri province has downsized from Forest Cover 2002 and reclassified as "State Private Land" for granting purpose as com...
-
Irrigation reform in Asia a review of 108 cases of irrigation management transfer
Like the proverbial happy families of Tolstoy, it is thought that all successful water users associations (WUA’s) have intrinsic commonalities and once these are understood, WUA...
-
Final Report on Preparatory Survey for Phnom Penh Transmission Line and Distribution System Construction Project
The Final Report on Preparatory Survey for Phnom Penh Transmission Line and Distribution System Construction Project, written by Electricité du Cambodge (EDC), aims to improve p...
-
Progress of Cambodia Power Development Plans & Transmission Interconnection Projects
This presentation is prepared by Electricité du Cambodge (EDC). It focused on Current Development of Power Sector and Outlook of Power Development Plan.
-
Hydro dams under construction or approved for development (2009)
A brief table summary of the power sector in Cambodia, specifically highlights the hydro dams under construction or approved for development as of September 2009. The table outl...
-
Cambodia: Greater Mekong Subregion Transmission Project
This report has 4 main sections namely project description, evaluation of design and implementation, evaluation of performance and overall assessment and recommendations. This p...
-
List of_EIAs on September 2013
This is a list of record on the Environmental Impact Assessment (EIA) received by a local organization in Cambodia, NGO Forum, as of September 2013. The table consists of 71 EIA...
-
Cambodia Energy Status and Its Development
The presentation was prepared by EDC for the 2011 Cambodia outlook conference of CDRI and ANZ Royal Bank on 16 March 2011, at Phnom Penh Hotel. The current development of Cambod...
-
Stung Atay Hydropower Plan
Stung Atay Hydropower Plan, located in Western Cambodia on the Atay River, worth US$255 million and undertaken by China Datang Cooperation. The dam has been a work-in-progress s...
-
Lower Stung Russei Chrum Hydropower Plant Inaugurated
The Chinese-built Lower Stung Russei Chrum Hydropower dam located in Bak Klong commune of Koh Kong province, in the Southwestern part of Cambodia has begun operation. The constr...
-
120 MW plant in Cambodia to start operation this week
Atai plant sited in Pursat, Western Cambodia, invested by the China Datang Corporation worth 255 million USD under a concessional contract of 34 years “Build-Operate-Transfer (B...
-
Lower Sesan 2 Hydropower Dam: Brief
This dataset has no description
-
ESIA: Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province
This document is a part of the report of Environmental and Social Impact Assessment (ESIA) for Lower Stung Russei Chrum Hydro-Electric Project in Koh Kong Province developed by ...
-
Kamchay Dam: GPS Coordinate
Kamchay Hydroelectric Development Project was contracted for 44 years including 4 years of construction by Sinohydro Kamchay Hydroelectric Co,Ltd. The construction was planned t...
-
Concession bibliography
The concession biography is compiled by the land and livelihood program of NGO Forum on Cambodia. A list of the publications and laws extends over various issues of (economic la...
-
Cambodia inaugurates 193-MW Kamchay Hydropower project
This is a screenshot of the news published on Hydroworld website about KamChay Hydropower plan inauguration. The Chinese-built Kamchay dam project in Kampot province has a large...
-
Progress of Cambodia power development plans and transmission interconnection projects
The presentation slides were prepared for the 8th Meeting of the Focal Group (FG-8) of the Greater Mekong Sub-region (GMS), on 26 November 2009, at Luangprabang of the Lao Peopl...
-
Sub-decree on land conversion of 4,674 hectares in Veal Veng district Pursat province
Located in Chay Lork village, O'som commune, Veal Veng distric, Pursat province, land size of 4,674 hectares was converted into state private property used for the investment of...