Skip to content

Webpage capture on the news article of​ the Bridge project tops out ahead of schedule

The successful topping out of The Bridge project, which involves the structure of the building reaching the highest point, was achieved on December 18, 2016, and was formally celebrated at a ceremony yesterday afternoon.

Data Resources (1)

Data Resource Preview - Webpage capture on The Bridge Cambodia

Additional Info

Field Value
Document type Archived web content
Language of document
  • English
Topics
  • Foreign investors
  • Investment
Geographic area (spatial range)
  • Cambodia
Province(s)
  • Phnom Penh
Copyright Yes
Access and use constraints

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form and content for any loss, harm or damage suffered as a result of its use.

Version / Edition 1
License

No license given

Contact

Phnom Penh Post

Mail address: The Elements Condominium, Level 7, Hun Sen Boulevard, Phum Tuol Roka III, Sangkat Chak Angre Krom, Khan Meanchey, 12353 Phnom Penh, Cambodia Tel: +855(0) 23 888 161 / 162 Fax: +855(0) 23 214 318 Khmer website: https://www.postkhmer.com/ English website: https://www.phnompenhpost.com/

Publication place Phnom Penh Post
Publication date 2017
General note

Link to the archived webpage: https://archive.ph/KUa77

Legacy reference document The_Bridge_Cambodia__11.01.2017.pdf
Keywords The Bridge Cambodia,Foreign Investment
Date uploaded March 28, 2022, 03:48 (UTC)
Date modified May 3, 2022, 10:12 (UTC)