Skip to content

Environmental and social management plan for the NR No. 5 Tbaeng Mean Chey DBST rural road subproject (WRR4 – Lot 5)

This document presents the environmental and social management plan for the WRR4 Lot 5 rural road subproject associated with National Road No. 5 in the Tbaeng Mean Chey area. It addresses potential environmental and social impacts arising from the upgrading of the road using double bituminous surface treatment (DBST). The plan outlines measures to mitigate potential impacts, monitor environmental and social performance, engage relevant stakeholders, and address grievances during project implementation.

Data Resources (1)

Data Resource Preview - Environmental and social management plan for the NR No. 5 Tbaeng Mean Chey DBST rural road subproject (WRR4 – Lot 5)

Additional Info

Field Value
Document type Reports, journal articles, and research papers (including theses and dissertations)
Language of document
  • English
Topics
  • Environmental impact assessments
  • Infrastructure
  • Roads and bridges
Geographic area (spatial range)
  • Cambodia
Copyright To be determined
Access and use constraints

By accessing this website or database, users agree to take full responsibility for reliance on any site information provided and to hold harmless and waive any and all liability against individuals or entities associated with its development, form, and content for any loss, harm, or damage suffered as a result of its use.

Version / Edition 1
License

No license given

Contact

Ministry of Rural Development (MRD) Address: No. 771–773, Preah Monivong Boulevard (Street 93), Sangkat Boeung Trabek, Khan Chamkar Mon, Phnom Penh, Cambodia. Telephone: +855 12 669 535 Email: info@mrd.gov.kh Website: www.mrd.gov.kh

Author (corporate) Ministry of Rural Development (MRD)
Publication date 2023
Legacy reference document esmp_nr5_tbaeng_mean_chey_dbst_road_subproject__00.00.2023.pdf
Keywords Environmental and social management,Rural road infrastructure,Double bituminous surface treatment,Environmental impact mitigation,Grievance redress
Date uploaded November 15, 2026, 05:58 (UTC)
Date modified November 15, 2026, 05:59 (UTC)