[Draft] Completed Environmental and Social Impact Assessment on Koh Krabey Resort Development Project of R.P.B Investment Co., Ltd
The specific objectives of the full environmental and social impact assessment study on the Koh Krabey Resort Development Project are: 1. Study the existing biological environm...
-
[Draft] Initial Environmental and Social Impact Assessment (IESIA) on Limestones construction business project of China Sui Tai Rock Factory Co., Ltd
The main purpose of China Sui Tai Rock Factory's construction stone business project is to contribute to the sustainable development of construction stone by supplying construct...
-
[Draft] Initial Environment and Social Impact Assessment on quarry business of Black Diamond Stone SJC Co., Ltd
The objectives of the Initial Environment and Social Impact Assessment are - To ensure doing business in the long term with sustainability. - Explore the existing environmenta...
-
[Draft] Completed Environmental and Social Impact Assessment (ESIA) on the limestone business project of Kampot Cement Co., Ltd.
The main purpose of the business and use of limestone for processing into cement of Kampot Cement Co., Ltd. is to contribute to the development of sustainable construction and r...
-
[Draft] Initial environmental and social impact assessment on the project to build the optic cable
Initial environmental and social impact assessment of the 1,085-km-long optic cable project, taking a sample of 2.6 km on the right side of street 380 in Preaek Ta kov commune, ...
-
[Draft] Environmental and social impact assessment on the completed project of Cambodia optical cable network in 5 target provinces
Environmental and Social Impact Assessment on the completed project of Cambodia optical cable network in 5 target provinces along street 135 in Chhouk district, Kampot province,...
-
Environmental Impact Assessment on Diversion Route Lower Yuam Reservoir -- Bhumibol Reservoir: Executive Summary Report
Under the Feasibility Study: Environmental Impact Assessment, Public Relations and Public Hearing of the Bhumibol Reservoir Inflow Augmentation Project, Panya Consultants Co., L...
-
[Draft] Initial environmental and social impact assessment (IESIA) on sand mining to create ship route and fill Kampot Special Economic Zone and Port project
The project is planned to be developed on the offshore filling area. In order to enable small and large ships to enter and exit the port, the company has to pump and build a por...
-
[Draft] Initial environmental and social impact assessment : Kamchay hydroelectric project in Kampot province
The Shinohydro is one of the leading company to utilize the water for producing electricity that has 10 subsidiaries and 70 network companies. The company won the international ...
-
[Draft] Completed environmental and social impact assessment report: Economic land concession of Heng Nong (Cambodia) International company limited
Heng Nong (Cambodia) requestស the royal government for the land concession for 6 488 hectares for the agroindustry plantation to supply the domestic and international market dem...
-
[Draft] Initial environmental and social impact assessment on Cheay Areng hydropower project in Koh Kong province
China Southern Power Grid Co., Ltd. develop hydro-power in Koh Kong. The study group from China chose two studies to study the feasibility of hydroelectric projects. According t...
-
[Draft] Initial environmental and social impact assessment: Koh Pos project in Preah Sihanouk province
The Morokot project is invested by Koh Pos (Cambodia) Investment Group LTD which is the Russian company and receives the Koh Pos lease concession for 99 years from 25 September ...
-
[Draft] Environmental and social impact assessment: Tatay hydroelectric project in Koh Kong province, Cambodia
The Tatay hydroelectric project of Koh Kong province was invested by Chinese company name Cambodian Tatay Hydropower Limited (CTHL) amounting USD 540 million and covering an are...
-
[Draft] Copy of environmental impact assessment report for Lower Sesan 2 hydropower project in Stung Treng province, Cambodia
The main purpose of the Lower Sesan II hydropower project is to meet the medium and long-term energy needs of the Kingdom of Cambodia, as well as to export some energy in excess...
-
[Draft] Completed environmental and social impact assessment: Project on submarine cable network construction of Telcotech ltd
Telcotech is a member of Asia AmericanGateway and is the exclusive Internet Service Provider for Cambodia, a submarine cable network linking the United States with South-East As...
-
[Draft] Initial Environmental and social impact assessment:Economic land concession of Sethikula Co., Ltd
Sithikula is the limited company in Cambodia and requests the Royal Government of Cambodia through the provincial governor and the senior minister of environment the land amount...
-
Complete environmental impact assessment report for Lower Sesan 2 hydropower project in Stung Treng province, Cambodia (Final report)
The main purpose of the Lower Sesan II hydropower project is to meet the medium- and long-term energy needs of the Kingdom of Cambodia, as well as to export some energy in exces...
-
[Draft] Preliminary Environmental Impact Assessment: Exploration and Exploitation Project of Ilmenite
Samnang Re Tbong Thmor Import Export and Development Co., Ltd. conducted a preliminary environmental impact assessment under the exploration and exploitation project of ilmenite...
-
[Draft] Preliminary environmental and social impact assessment: Project investment on agro-industrial plantation (rubber)
Tan Bien Kampong Thom Aphivath Caoutchouc co., ltd issued an environmental and social impact assessment in purpose of assuring sustainability of rubber plantation. The aims of ...
-
[Draft] Environmental and social impact assessment: Agro-industry project of HLH Agriculture (Cambodia) Co.,Ltd in Kampong Speu province, Cambodia
HLH Agriculture (Cambodia) Co.,Ltd. is a limited liability individual enterprise. The company is registered with the Ministry of Commerce with an initial registered capital of ...