Environmental and social management plan for the Phum Sambo–Phum Srea Anteak–Phum Phnompreal DBST rural road subproject, Pailin province (WRR4 – Lot 1, PLN2)
This document presents the environmental and social management plan for upgrading an existing 15.438-kilometre laterite road into a double bituminous surface treatment (DBST) ro...
-
Environmental and social management plan for the Chambak–Chan Mul DBST rural road subproject, Tbong Khmum province (WRR4 – Lot 2, TKM5)
This document presents the environmental and social management plan for the Chambak–Chan Mul rural road subproject in Tbong Khmum province under WRR4 Lot 2 (TKM5). It addresses ...
-
Environmental and social management plan for the Svay Char–Ta Huy DBST and reinforced concrete rural road subproject, Prey Veng province (WRR4 – Lot 3, PVG3)
This document is identified as the environmental and social management plan for the WRR4 Lot 3 rural road subproject connecting Svay Char and Ta Huy in Prey Veng province. It is...
-
Environmental and social management plan for the Chour Ti Mouy–Trapeang Kranh DBST and reinforced concrete rural road subproject, Prey Veng province (WRR4 – Lot 4)
This document presents the environmental and social management plan for upgrading a 15.55-kilometre existing laterite road into a double bituminous surface treatment (DBST) and ...
-
Environmental and social management plan for the Memae–Meaek Puk DBST and reinforced concrete rural road subproject, Tbong Khmum province (WRR5 – Lot 1, TKM4)
This document presents the environmental and social management plan for upgrading an existing laterite road into a double bituminous surface treatment (DBST) and reinforced conc...
-
Environmental and social management plan for the Thma Bang DBST and reinforced concrete rural road subproject, Koh Kong province (WRR5 – Lot 3, KKG2)
This document presents the environmental and social management plan for the rehabilitation and upgrading of the existing 26.1-kilometre rural road connecting National Road No. 4...
-
Environmental and social management plan for the Prey Ki–Ou Mal rural road subproject, Kampong Chhnang province (WRR8 – Lot 1, KCH6)
This document presents the environmental and social management plan for the Prey Ki–Ou Mal rural road subproject in Kampong Chhnang province, identified as WRR8 – Lot 1 (KCH6). ...
-
Stakeholder engagement plan for the Cambodia Road Connectivity Improvement Project (CRCIP) and additional financing
This document presents the Stakeholder Engagement Plan (SEP) for the Cambodia Road Connectivity Improvement Project and its additional financing, jointly implemented by the Mini...
-
Executive summary of the stakeholder engagement plan for the Cambodia Road Connectivity Improvement Project (CRCIP) and additional financing
This document summarizes the Stakeholder Engagement Plan (SEP) for the Cambodia Road Connectivity Improvement Project and its additional financing, implemented by the Ministry o...
-
Environmental and social commitment plan for the Cambodia Road Connectivity Improvement Project (CRCIP) and additional financing
This document sets out the environmental and social commitments and measures to be implemented by the Royal Government of Cambodia through the Ministry of Public Works and Trans...
-
Summary of the environmental and social management plan for Batch 2 rural road construction, Lot 2, Kampong Chhnang province
This document summarizes the environmental and social management measures for the rehabilitation and reconstruction of a 20.195-kilometre rural road connecting National Road No....
-
Summary of the environmental and social management plan for Batch 2 rural road construction, Lot 3, Prey Veng province
This document summarizes the environmental and social management measures for the rehabilitation and reconstruction of the 8.064-kilometre rural road from Kone Sam Aok to Chrak ...
-
Summary of the environmental and social management plan for Batch 2 rural road construction, Lot 4, Tbong Khmum province
This document summarizes the environmental and social management measures for the rehabilitation and reconstruction of the 11.684-kilometre rural road from Thmor Thong to Samdec...
-
Summary of the environmental and social management plan for Batch 2 rural road construction, Lot 1, Kampong Chhnang province
This document summarizes the environmental and social management measures for the rehabilitation and reconstruction of the 12.33-kilometre rural road from Kouk Banteay to Kang T...
-
Summary of the environmental and social management plan for Batch 2 rural road construction, Lot 5, Tbong Khmum province
This document summarizes the environmental and social management measures for the rehabilitation and reconstruction of the 14.036-kilometre rural road from Chey Peang to Krsang ...
-
Summary of the environmental and social management plan for Batch 2 rural road construction, Lot 7, Koh Kong province
This document summarizes the environmental and social management measures for the rehabilitation and reconstruction of the 19.837-kilometre rural road from Boeung Preav to Prey ...
-
Public consultation data for three provinces under the Cambodia Road Connectivity Improvement Project (CRCIP)
This document compiles data from public consultations conducted in three provinces under the Cambodia Road Connectivity Improvement Project (CRCIP). It provides information gath...
-
Updated environmental and social commitment plan for the Cambodia Road Connectivity Improvement Project (CRCIP)
This plan sets out the environmental and social commitments, implementation responsibilities, monitoring requirements and safeguards for the Cambodia Road Connectivity Improveme...
-
Environmental and social management plan for community pond subprojects in Koh Kong province (WWA6 – Lot 2)
This plan outlines environmental and social risks, mitigation measures and monitoring arrangements for community pond subprojects in Koh Kong province under WWA6.
-
Environmental and social management plan for community pond subprojects in Pailin province (WWA6 – Lot 1)
This plan assesses environmental and social risks and outlines mitigation and monitoring measures for 19 community pond subprojects in Pailin province under NRRPCP