{"help": "https://data.laos.opendevelopmentmekong.net/en/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "resource_id": "22977a22-e225-40dd-8abc-20a54c6d20b4", "fields": [{"type": "int", "id": "_id"}, {"type": "varchar", "id": "Catchment  Annual Rainfall (mm)"}, {"type": "varchar", "id": "Total Powerplant Design Discharge (m3/s)\n"}, {"type": "varchar", "id": "Transmission Line Length (km)\n"}, {"type": "varchar", "id": "Transmission Line Voltage level (kV)\n"}, {"type": "float4", "id": "Turbine Discharge/ Min Flow\n"}, {"type": "varchar", "id": "Transmission Line Connected to S/S\n"}, {"type": "varchar", "id": "Full Supply Level (FSL) (m)\n"}, {"type": "varchar", "id": "Powerhouse Type"}, {"type": "varchar", "id": "Dam Type"}, {"type": "float4", "id": "Reservoir Area (km2)\n"}, {"type": "varchar", "id": "Estimated No. Construction Workers (planned projects)\n"}, {"type": "float4", "id": "Total Length of Reservoir (km)\n"}, {"type": "varchar", "id": "Reservoir Live Storage (hm3)\n"}, {"type": "varchar", "id": "Reservoir Dead Storage (hm3)\n"}, {"type": "varchar", "id": "Reservoir Retention Period (days)\n"}, {"type": "varchar", "id": "Run-of-River or Storage"}, {"type": "varchar", "id": "Township"}, {"type": "varchar", "id": "Myanmar Selfuse (MW)\n"}, {"type": "float4", "id": "% use MYA"}, {"type": "varchar", "id": "Export (MW)"}, {"type": "varchar", "id": "Height (m)"}, {"type": "float4", "id": "Qmin/ MAF"}, {"type": "varchar", "id": "Crest Length (m)"}, {"type": "float4", "id": "Distance along river between dam and powerhouse (km)\n"}, {"type": "varchar", "id": "Plant Factor"}, {"type": "varchar", "id": "Installed Capacity (MW)"}, {"type": "varchar", "id": "Financiers"}, {"type": "varchar", "id": "GIS Rainfall\n"}, {"type": "float4", "id": "Max reservoir area (FSL) (km2)\n"}, {"type": "float4", "id": "Unit Flow (l/s/km2)\n"}, {"type": "varchar", "id": "District"}, {"type": "float4", "id": "Mean annual inflow (MAF) into reservoir (m3/s)\n"}, {"type": "varchar", "id": "Developers"}, {"type": "varchar", "id": "Sub-Basin (GIS Maps)\n"}, {"type": "varchar", "id": "Status (labelled by IFC)"}, {"type": "varchar", "id": "State/Region"}, {"type": "varchar", "id": "Basin"}, {"type": "float4", "id": "Annual Runoff into Reservoir (hm3)"}, {"type": "varchar", "id": "Catchment Area (km2)\n"}, {"type": "varchar", "id": "Sub-Basin (HP Chapter)\n"}, {"type": "varchar", "id": "Mean annual energy (GW)\n"}, {"type": "varchar", "id": "Total storage (FSL) (mil. m3)"}, {"type": "varchar", "id": "Notes"}, {"type": "varchar", "id": "River"}, {"type": "varchar", "id": "Function"}, {"type": "varchar", "id": "Country"}, {"type": "float4", "id": "Location_L"}, {"type": "float4", "id": "Location_1"}, {"type": "varchar", "id": "Status"}, {"type": "varchar", "id": "Project Name"}, {"type": "varchar", "id": "COD Year"}, {"type": "varchar", "id": "Project ID"}, {"type": "geometry", "id": "the_geom"}], "records_format": "objects", "total_was_estimated": false, "records": [{"_id":0,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"46","Transmission Line Length (km)\n":"5","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":1.6,"Transmission Line Connected to S/S\n":"Baluchaung 2","Full Supply Level (FSL) (m)\n":"867","Powerhouse Type":"Above ground","Dam Type":"CG","Reservoir Area (km2)\n":0,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":0.2,"Reservoir Live Storage (hm3)\n":"2","Reservoir Dead Storage (hm3)\n":"0","Reservoir Retention Period (days)\n":"1","Run-of-River or Storage":"RoR","Township":"Loikaw","Myanmar Selfuse (MW)\n":"28","% use MYA":1,"Export (MW)":"0","Height (m)":"11","Qmin/ MAF":0.81,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":10.3,"Plant Factor":"0.82","Installed Capacity (MW)":"28","Financiers":"Sole Investment","GIS Rainfall\n":"1493","Max reservoir area (FSL) (km2)\n":0,"Unit Flow (l/s/km2)\n":4.6,"District":"Loikaw","Mean annual inflow (MAF) into reservoir (m3/s)\n":36.5,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Baluchaung","Status (labelled by IFC)":"Built","State/Region":"Kayah","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":1151,"Catchment Area (km2)\n":"7872","Sub-Basin (HP Chapter)\n":"Nam Pawn","Mean annual energy (GW)\n":"28","Total storage (FSL) (mil. m3)":"2","Notes":"http://globalenergyobservatory.org/geoid/41487","River":"Baluchaung","Function":"HP","Country":"Myanmar","Location_L":97.287,"Location_1":19.648,"Status":"Complete","Project Name":"Baluchaung 1","COD Year":"1992","Project ID":"DAM0001","the_geom":"0101000020E6100000EE7C3F355E525840D9CEF753E3A53340"},{"_id":1,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"48","Transmission Line Length (km)\n":"0","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":1.6,"Transmission Line Connected to S/S\n":"Taungoo and Shwemyo","Full Supply Level (FSL) (m)\n":"787","Powerhouse Type":"Above ground","Dam Type":"Weir","Reservoir Area (km2)\n":0,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":0,"Reservoir Live Storage (hm3)\n":"0","Reservoir Dead Storage (hm3)\n":"0","Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"RoR","Township":"Loikaw","Myanmar Selfuse (MW)\n":"168","% use MYA":1,"Export (MW)":"0","Height (m)":"-","Qmin/ MAF":0.79,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":7.1,"Plant Factor":"0.81","Installed Capacity (MW)":"168","Financiers":"Sole Investment","GIS Rainfall\n":"1493","Max reservoir area (FSL) (km2)\n":0,"Unit Flow (l/s/km2)\n":4.8,"District":"Loikaw","Mean annual inflow (MAF) into reservoir (m3/s)\n":38,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Baluchaung","Status (labelled by IFC)":"Built","State/Region":"Kayah","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":1198,"Catchment Area (km2)\n":"7910","Sub-Basin (HP Chapter)\n":"Nam Pawn","Mean annual energy (GW)\n":"168","Total storage (FSL) (mil. m3)":"-","Notes":"This is definitely Baluchaung II. The sequence is, however, confusing, and there would appear to be four dams here, not just three.","River":"Baluchaung","Function":"HP","Country":"Myanmar","Location_L":97.358,"Location_1":19.557,"Status":"Complete","Project Name":"Baluchaung 2","COD Year":"1974","Project ID":"DAM0002","the_geom":"0101000020E6100000F4FDD478E95658403BDF4F8D978E3340"},{"_id":2,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"51","Transmission Line Length (km)\n":"5","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":1.7,"Transmission Line Connected to S/S\n":"Baluchaung 3","Full Supply Level (FSL) (m)\n":"339","Powerhouse Type":"Above ground","Dam Type":"Intake","Reservoir Area (km2)\n":0,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":0,"Reservoir Live Storage (hm3)\n":"0","Reservoir Dead Storage (hm3)\n":"0","Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"RoR","Township":"Loikaw","Myanmar Selfuse (MW)\n":"52","% use MYA":1,"Export (MW)":"0","Height (m)":"-","Qmin/ MAF":0.75,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":5.1,"Plant Factor":"0.73","Installed Capacity (MW)":"52","Financiers":"Local BOT","GIS Rainfall\n":"1493","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":5,"District":"Loikaw","Mean annual inflow (MAF) into reservoir (m3/s)\n":40.2,"Developers":"Future Energy","Sub-Basin (GIS Maps)\n":"Baluchaung","Status (labelled by IFC)":"Built","State/Region":"Kayah","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":1268,"Catchment Area (km2)\n":"8042","Sub-Basin (HP Chapter)\n":"Nam Pawn","Mean annual energy (GW)\n":"52","Total storage (FSL) (mil. m3)":"-","Notes":"Not sure if this is a dam - may just be infrastructure. But assuming the sequence runs from Baluchaung 1 through 3, from north to south; and we know Baluchaung 2 is correct, then this is the only structure that can be Baluchaung 3.","River":"Baluchaung","Function":"HP","Country":"Myanmar","Location_L":97.397,"Location_1":19.546,"Status":"Complete","Project Name":"Baluchaung 3","COD Year":"2014","Project ID":"DAM0003","the_geom":"0101000020E6100000C520B07268595840B29DEFA7C68B3340"},{"_id":3,"Catchment  Annual Rainfall (mm)":"1925.000000","Total Powerplant Design Discharge (m3/s)\n":"16","Transmission Line Length (km)\n":"32","Transmission Line Voltage level (kV)\n":"66","Turbine Discharge/ Min Flow\n":3.3,"Transmission Line Connected to S/S\n":"Kalaw","Full Supply Level (FSL) (m)\n":"1140","Powerhouse Type":"Above ground","Dam Type":null,"Reservoir Area (km2)\n":9.7,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":"Pin Laung","Myanmar Selfuse (MW)\n":"30","% use MYA":1,"Export (MW)":"0","Height (m)":"35","Qmin/ MAF":0.43,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":3,"Plant Factor":"0.34","Installed Capacity (MW)":"30","Financiers":"Local BOT","GIS Rainfall\n":"1493","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":31.1,"District":"Taunggyi","Mean annual inflow (MAF) into reservoir (m3/s)\n":11.1,"Developers":"NeoEnergy Oasis","Sub-Basin (GIS Maps)\n":"Baluchaung","Status (labelled by IFC)":"Construction","State/Region":"Shan","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":349,"Catchment Area (km2)\n":"356","Sub-Basin (HP Chapter)\n":"Nam Pawn","Mean annual energy (GW)\n":"30","Total storage (FSL) (mil. m3)":null,"Notes":"https://cdm.unfccc.int/filestorage/M/A/B/MABJRWF82L1DGKX4QCNOVSEH673ZP0/PDD_UB-2_ver1_131031.pdf?t=VGh8bzMxbDF5fDBh34XFFoXWAt3fwfAVE7xS","River":"Baluchaung","Function":"HP","Country":"Myanmar","Location_L":96.78192,"Location_1":20.484592,"Status":"UC","Project Name":"Baluchaung (upper)","COD Year":"2019","Project ID":"DAM0004","the_geom":"0101000020E6100000D789CBF10A3258403AE7A7380E7C3440"},{"_id":4,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":"Rockfill","Reservoir Area (km2)\n":19.4,"Estimated No. Construction Workers (planned projects)\n":"700","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":"278","Reservoir Dead Storage (hm3)\n":"557","Reservoir Retention Period (days)\n":"339","Run-of-River or Storage":"S","Township":"Kyauk Gyi","Myanmar Selfuse (MW)\n":"160","% use MYA":1,"Export (MW)":"0","Height (m)":"80","Qmin/ MAF":0.09,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.36","Installed Capacity (MW)":"160","Financiers":"Local BOT","GIS Rainfall\n":"2806","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":36.5,"District":"Taungoo","Mean annual inflow (MAF) into reservoir (m3/s)\n":9.5,"Developers":"Thoolei","Sub-Basin (GIS Maps)\n":"Bawgata","Status (labelled by IFC)":"LocMoU","State/Region":"Bago","Basin":"Sittaung","Annual Runoff into Reservoir (hm3)":300,"Catchment Area (km2)\n":"260","Sub-Basin (HP Chapter)\n":"Bawgata","Mean annual energy (GW)\n":"160","Total storage (FSL) (mil. m3)":"835","Notes":null,"River":"Bawgata","Function":"HP","Country":"Myanmar","Location_L":96.848495,"Location_1":18.255562,"Status":"Proposed","Project Name":"Bawgata","COD Year":"2020","Project ID":"DAM0005","the_geom":"0101000020E61000005BB22AC24D365840102219726C413240"},{"_id":5,"Catchment  Annual Rainfall (mm)":"3700.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"61","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Thaton","Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":310,"Estimated No. Construction Workers (planned projects)\n":"1100","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":"9491","Reservoir Dead Storage (hm3)\n":"220","Reservoir Retention Period (days)\n":"578","Run-of-River or Storage":"S","Township":"Bilin","Myanmar Selfuse (MW)\n":"280","% use MYA":1,"Export (MW)":"0","Height (m)":"131","Qmin/ MAF":0.05,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"-","Installed Capacity (MW)":"280","Financiers":"Local BOT","GIS Rainfall\n":"3138","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":84.4,"District":"Thaton","Mean annual inflow (MAF) into reservoir (m3/s)\n":190,"Developers":"HCDG","Sub-Basin (GIS Maps)\n":"Bilin","Status (labelled by IFC)":"LocMoU","State/Region":"Mon","Basin":"Bilin","Annual Runoff into Reservoir (hm3)":5992,"Catchment Area (km2)\n":"2250","Sub-Basin (HP Chapter)\n":"Bilin","Mean annual energy (GW)\n":"280","Total storage (FSL) (mil. m3)":"9711","Notes":null,"River":"Bilin River","Function":"HP","Country":"Myanmar","Location_L":97.243546,"Location_1":17.519724,"Status":"Proposed","Project Name":"Belin","COD Year":"2021","Project ID":"DAM0006","the_geom":"0101000020E61000009544F641964F5840A0FA07910C853140"},{"_id":6,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":76.2,"Estimated No. Construction Workers (planned projects)\n":"600","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":"119","Reservoir Dead Storage (hm3)\n":"602","Reservoir Retention Period (days)\n":"17","Run-of-River or Storage":"S","Township":"Setotaya","Myanmar Selfuse (MW)\n":"150","% use MYA":1,"Export (MW)":"0","Height (m)":"138","Qmin/ MAF":0.09,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.41","Installed Capacity (MW)":"150","Financiers":"Sole Investment","GIS Rainfall\n":"1694","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":34.3,"District":"Minbu","Mean annual inflow (MAF) into reservoir (m3/s)\n":79,"Developers":"MOALI","Sub-Basin (GIS Maps)\n":"Mone Chaung","Status (labelled by IFC)":"GOM Plan","State/Region":"Magway","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":2491,"Catchment Area (km2)\n":"2305","Sub-Basin (HP Chapter)\n":"Mone Chaung","Mean annual energy (GW)\n":"150","Total storage (FSL) (mil. m3)":"721","Notes":null,"River":"Mon Chaung","Function":"MP","Country":"Myanmar","Location_L":94.0818,"Location_1":20.76609,"Status":"Proposed","Project Name":"Buywa (upper)","COD Year":"2019","Project ID":"DAM0007","the_geom":"0101000020E6100000053411363C855740EACA67791EC43440"},{"_id":7,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":38.1,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":"139","Reservoir Dead Storage (hm3)\n":"70","Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"-","Township":"Setotaya","Myanmar Selfuse (MW)\n":"42","% use MYA":1,"Export (MW)":"0","Height (m)":"46","Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"-","Installed Capacity (MW)":"42","Financiers":"Sole Investment","GIS Rainfall\n":"1694","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":null,"District":"Minbu","Mean annual inflow (MAF) into reservoir (m3/s)\n":null,"Developers":"MOALI","Sub-Basin (GIS Maps)\n":"Mone Chaung","Status (labelled by IFC)":"Construction","State/Region":"Magway","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":0,"Catchment Area (km2)\n":"3108","Sub-Basin (HP Chapter)\n":"Mone Chaung","Mean annual energy (GW)\n":"42","Total storage (FSL) (mil. m3)":"209","Notes":null,"River":"Mon Chaung","Function":"MP","Country":"Myanmar","Location_L":94.15083,"Location_1":20.658056,"Status":"UC","Project Name":"Buywa","COD Year":"2018","Project ID":"DAM0008","the_geom":"0101000020E6100000168A743FA7895740C3EFA65B76A83440"},{"_id":8,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"2762","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":5.7,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"400","Powerhouse Type":"Underground","Dam Type":"CFRD","Reservoir Area (km2)\n":27.7,"Estimated No. Construction Workers (planned projects)\n":"10700","Total Length of Reservoir (km)\n":62,"Reservoir Live Storage (hm3)\n":"380","Reservoir Dead Storage (hm3)\n":"1530","Reservoir Retention Period (days)\n":"2","Run-of-River or Storage":"RoR","Township":"Chipwi","Myanmar Selfuse (MW)\n":"340","% use MYA":0.5,"Export (MW)":"1700","Height (m)":"203","Qmin/ MAF":0.22,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.61","Installed Capacity (MW)":"3400","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1540","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":101.7,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":2210,"Developers":"CPI","Sub-Basin (GIS Maps)\n":"Nmae Hka","Status (labelled by IFC)":"JVA","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":69695,"Catchment Area (km2)\n":"21734","Sub-Basin (HP Chapter)\n":"Ayeyarwady Headwaters","Mean annual energy (GW)\n":"3400","Total storage (FSL) (mil. m3)":"1910","Notes":null,"River":"N'Mai  Hka","Function":"HP","Country":"PRC","Location_L":98.12572,"Location_1":25.8905,"Status":"Proposed","Project Name":"Chipwi","COD Year":"2020","Project ID":"DAM0009","the_geom":"0101000020E6100000001DE6CB0B8858408716D9CEF7E33940"},{"_id":9,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"26","Transmission Line Length (km)\n":"98","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":5.6,"Transmission Line Connected to S/S\n":"Waingmaw","Full Supply Level (FSL) (m)\n":"740","Powerhouse Type":"Above ground","Dam Type":"CG","Reservoir Area (km2)\n":0.1,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":0.7,"Reservoir Live Storage (hm3)\n":"0","Reservoir Dead Storage (hm3)\n":"1","Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"RoR","Township":"Chipwi","Myanmar Selfuse (MW)\n":"20","% use MYA":0.2,"Export (MW)":"79","Height (m)":"48","Qmin/ MAF":0.12,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":16.7,"Plant Factor":"0.69","Installed Capacity (MW)":"99","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1540","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":72.6,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":40.1,"Developers":"SPIC","Sub-Basin (GIS Maps)\n":"Nmae Hka","Status (labelled by IFC)":"Built","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":1265,"Catchment Area (km2)\n":"552","Sub-Basin (HP Chapter)\n":"Ayeyarwady Headwaters","Mean annual energy (GW)\n":"99","Total storage (FSL) (mil. m3)":"1","Notes":null,"River":"Chipwi Hka","Function":"HP","Country":"PRC","Location_L":98.18404,"Location_1":25.806072,"Status":"Complete","Project Name":"Chipwi Nge","COD Year":"2013","Project ID":"DAM0010","the_geom":"0101000020E6100000118C834BC78B58404930D5CC5ACE3940"},{"_id":10,"Catchment  Annual Rainfall (mm)":"1330.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"37","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Bamaw","Full Supply Level (FSL) (m)\n":"250","Powerhouse Type":"Above ground","Dam Type":"Concrete","Reservoir Area (km2)\n":0.4,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":3.6,"Reservoir Live Storage (hm3)\n":"15","Reservoir Dead Storage (hm3)\n":"8","Reservoir Retention Period (days)\n":"1","Run-of-River or Storage":"RoR","Township":"Bhamo","Myanmar Selfuse (MW)\n":"19","% use MYA":0.08,"Export (MW)":"221","Height (m)":"46","Qmin/ MAF":0.19,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":4.3,"Plant Factor":"0.51","Installed Capacity (MW)":"240","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1686","Max reservoir area (FSL) (km2)\n":0.32,"Unit Flow (l/s/km2)\n":53.1,"District":"Bhamo","Mean annual inflow (MAF) into reservoir (m3/s)\n":319,"Developers":"China Datang","Sub-Basin (GIS Maps)\n":"Dapein","Status (labelled by IFC)":"Built","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":10060,"Catchment Area (km2)\n":"6002","Sub-Basin (HP Chapter)\n":"Dapein","Mean annual energy (GW)\n":"240","Total storage (FSL) (mil. m3)":"22","Notes":"Google Earth visible. See also https://cdm.unfccc.int/filestorage/t/m/XVMU7R9ONJBAP2ZGD8L3C4FYE5KHW0.pdf/PDD.pdf?t=Q2F8bzMzMW84fDAfiJMpRQsQs6aYwYImqFJ6","River":"Dapein","Function":"HP","Country":"PRC","Location_L":97.52545,"Location_1":24.421452,"Status":"Complete","Project Name":"Dapein 1","COD Year":"2011","Project ID":"DAM0011","the_geom":"0101000020E6100000E9EFA5F0A0615840D3DD7536E46B3840"},{"_id":11,"Catchment  Annual Rainfall (mm)":"1330.000000","Total Powerplant Design Discharge (m3/s)\n":"380","Transmission Line Length (km)\n":"16","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":5.9,"Transmission Line Connected to S/S\n":"Dapein1","Full Supply Level (FSL) (m)\n":"179","Powerhouse Type":"Above ground","Dam Type":"CG","Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"600","Total Length of Reservoir (km)\n":8,"Reservoir Live Storage (hm3)\n":"36","Reservoir Dead Storage (hm3)\n":"19","Reservoir Retention Period (days)\n":"1","Run-of-River or Storage":"RoR","Township":"Moemauk","Myanmar Selfuse (MW)\n":"70","% use MYA":0.5,"Export (MW)":"70","Height (m)":"59","Qmin/ MAF":0.19,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.52","Installed Capacity (MW)":"140","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1686","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":53.2,"District":"Bhamo","Mean annual inflow (MAF) into reservoir (m3/s)\n":331,"Developers":"DUHD","Sub-Basin (GIS Maps)\n":"Dapein","Status (labelled by IFC)":"MOU","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":10438,"Catchment Area (km2)\n":"6220","Sub-Basin (HP Chapter)\n":"Dapein","Mean annual energy (GW)\n":"140","Total storage (FSL) (mil. m3)":"55","Notes":null,"River":"Dapein","Function":"HP","Country":"PRC","Location_L":97.4214,"Location_1":24.36827,"Status":"Proposed","Project Name":"Dapein 2","COD Year":"2022","Project ID":"DAM0012","the_geom":"0101000020E610000034A2B437F85A5840111956F1465E3840"},{"_id":12,"Catchment  Annual Rainfall (mm)":"1300.000000","Total Powerplant Design Discharge (m3/s)\n":"840","Transmission Line Length (km)\n":"20","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":6.6,"Transmission Line Connected to S/S\n":"Belin","Full Supply Level (FSL) (m)\n":"81","Powerhouse Type":"In dam","Dam Type":"RCC Gravity Dam","Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"200","Total Length of Reservoir (km)\n":21,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"ROR","Township":"Kyaukse","Myanmar Selfuse (MW)\n":"66","% use MYA":1.1,"Export (MW)":"-6","Height (m)":"27","Qmin/ MAF":0.21,"Crest Length (m)":"620.000000","Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.64","Installed Capacity (MW)":"60","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1596","Max reservoir area (FSL) (km2)\n":43.38,"Unit Flow (l/s/km2)\n":17.1,"District":"Pyinoolwin","Mean annual inflow (MAF) into reservoir (m3/s)\n":491.4,"Developers":"Andritz Hydro","Sub-Basin (GIS Maps)\n":"Lower Myitnge","Status (labelled by IFC)":"MOU","State/Region":"Mandalay","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":15496,"Catchment Area (km2)\n":"28695","Sub-Basin (HP Chapter)\n":"Myitnge","Mean annual energy (GW)\n":"60","Total storage (FSL) (mil. m3)":"13","Notes":"Google Earth visible.","River":"Lower Myitnge","Function":"HP","Country":"Austria","Location_L":96.40446,"Location_1":21.68723,"Status":"Proposed","Project Name":"Deedoke","COD Year":"2020","Project ID":"DAM0109","the_geom":"0101000020E6100000096D3997E219584080D4264EEEAF3540"},{"_id":13,"Catchment  Annual Rainfall (mm)":"2822.000000","Total Powerplant Design Discharge (m3/s)\n":"83","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":7.5,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"405","Powerhouse Type":"Underground","Dam Type":"CG","Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"500","Total Length of Reservoir (km)\n":5,"Reservoir Live Storage (hm3)\n":"30","Reservoir Dead Storage (hm3)\n":"4","Reservoir Retention Period (days)\n":"9","Run-of-River or Storage":"S","Township":"Wyunmaw","Myanmar Selfuse (MW)\n":"130","% use MYA":1,"Export (MW)":"0","Height (m)":"81","Qmin/ MAF":0.29,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":3.4,"Plant Factor":"0.33","Installed Capacity (MW)":"130","Financiers":"Foreign JV/BOT","GIS Rainfall\n":null,"Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":58.2,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":38.4,"Developers":"YBEP/Chan Yinn Khuu","Sub-Basin (GIS Maps)\n":"Nmae Hka","Status (labelled by IFC)":"MOU","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":1211,"Catchment Area (km2)\n":"660","Sub-Basin (HP Chapter)\n":"Ayeyarwady Headwaters","Mean annual energy (GW)\n":"130","Total storage (FSL) (mil. m3)":"34","Notes":null,"River":"N'Mai  Hka Tributary","Function":"HP","Country":"PRC/MYA","Location_L":97.90702,"Location_1":25.511557,"Status":"Proposed","Project Name":"Dum Ban","COD Year":"2020","Project ID":"DAM0014","the_geom":"0101000020E610000041F2CEA10C7A584094128255F5823940"},{"_id":14,"Catchment  Annual Rainfall (mm)":"3500.000000","Total Powerplant Design Discharge (m3/s)\n":"76","Transmission Line Length (km)\n":"15","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":17.4,"Transmission Line Connected to S/S\n":"Hawkawn","Full Supply Level (FSL) (m)\n":"1510","Powerhouse Type":"Above ground","Dam Type":"CG","Reservoir Area (km2)\n":6.7,"Estimated No. Construction Workers (planned projects)\n":"500","Total Length of Reservoir (km)\n":3,"Reservoir Live Storage (hm3)\n":"1","Reservoir Dead Storage (hm3)\n":"0","Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"RoR","Township":"Chipwi","Myanmar Selfuse (MW)\n":"60","% use MYA":0.5,"Export (MW)":"60","Height (m)":"47","Qmin/ MAF":0.08,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":11,"Plant Factor":"0.56","Installed Capacity (MW)":"120","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1540","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":75.8,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":56.1,"Developers":"YEIG/IGOEC","Sub-Basin (GIS Maps)\n":"Naw Chang  Hka","Status (labelled by IFC)":"JVA","State/Region":"Kachin","Basin":null,"Annual Runoff into Reservoir (hm3)":1769,"Catchment Area (km2)\n":"740","Sub-Basin (HP Chapter)\n":"Ayeyarwady Headwaters","Mean annual energy (GW)\n":"120","Total storage (FSL) (mil. m3)":"1","Notes":null,"River":"Naw Chang  Hka","Function":"HP","Country":"PRC/MYA","Location_L":98.58046,"Location_1":26.051935,"Status":"Proposed","Project Name":"Gaw Lan","COD Year":"2026","Project ID":"DAM0015","the_geom":"0101000020E61000009FE6E44526A558402D7C7DAD4B0D3A40"},{"_id":15,"Catchment  Annual Rainfall (mm)":"1100.000000","Total Powerplant Design Discharge (m3/s)\n":"360","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":5.9,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"206","Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"700","Total Length of Reservoir (km)\n":29,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":0,"Export (MW)":null,"Height (m)":"72","Qmin/ MAF":0.18,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.48","Installed Capacity (MW)":"180","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1446","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":19.8,"District":"Bawlakhe","Mean annual inflow (MAF) into reservoir (m3/s)\n":334,"Developers":"TEI/HCTC","Sub-Basin (GIS Maps)\n":"Nam Pawn","Status (labelled by IFC)":"MOU","State/Region":"Kayah","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":10533,"Catchment Area (km2)\n":"16884","Sub-Basin (HP Chapter)\n":"Nam Pawn","Mean annual energy (GW)\n":"180","Total storage (FSL) (mil. m3)":"333","Notes":null,"River":"Nam Pawn","Function":"HP","Country":"SIN/MYA","Location_L":97.39972,"Location_1":19.211666,"Status":"Proposed","Project Name":"Hawkham (upper)","COD Year":"2020","Project ID":"DAM0016","the_geom":"0101000020E6100000785F950B9559584076A4FACE2F363340"},{"_id":16,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":6.5,"Estimated No. Construction Workers (planned projects)\n":"600","Total Length of Reservoir (km)\n":27,"Reservoir Live Storage (hm3)\n":"12","Reservoir Dead Storage (hm3)\n":"56","Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"RoR","Township":null,"Myanmar Selfuse (MW)\n":"69","% use MYA":0.5,"Export (MW)":"69","Height (m)":null,"Qmin/ MAF":0.2,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.4","Installed Capacity (MW)":"138","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1381","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":23.8,"District":"He Kou","Mean annual inflow (MAF) into reservoir (m3/s)\n":359,"Developers":"YNIC","Sub-Basin (GIS Maps)\n":"Nam Lwe","Status (labelled by IFC)":"MOU","State/Region":"Shan","Basin":"Mekong","Annual Runoff into Reservoir (hm3)":11321,"Catchment Area (km2)\n":"15103","Sub-Basin (HP Chapter)\n":"Nam Lwe","Mean annual energy (GW)\n":"138","Total storage (FSL) (mil. m3)":"68","Notes":null,"River":"Nam Lwe","Function":"HP","Country":"PRC","Location_L":100.720924,"Location_1":21.341291,"Status":"Proposed","Project Name":"He Kou","COD Year":"2025","Project ID":"DAM0017","the_geom":"0101000020E610000053B131AF232E59404C6BD3D85E573540"},{"_id":17,"Catchment  Annual Rainfall (mm)":"3625.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"15","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Tongxinqiao","Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":2,"Estimated No. Construction Workers (planned projects)\n":"600","Total Length of Reservoir (km)\n":2.8,"Reservoir Live Storage (hm3)\n":"3","Reservoir Dead Storage (hm3)\n":"2","Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"RoR","Township":"Tsawlaw","Myanmar Selfuse (MW)\n":"70","% use MYA":0.5,"Export (MW)":"70","Height (m)":"42","Qmin/ MAF":0.32,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.63","Installed Capacity (MW)":"140","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1540","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":72.8,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":96.5,"Developers":"YEIG/IGOEC","Sub-Basin (GIS Maps)\n":"Naw Chang  Hka","Status (labelled by IFC)":"MOA","State/Region":"Kachin","Basin":null,"Annual Runoff into Reservoir (hm3)":3043,"Catchment Area (km2)\n":"1326","Sub-Basin (HP Chapter)\n":"Ayeyarwady Headwaters","Mean annual energy (GW)\n":"140","Total storage (FSL) (mil. m3)":"5","Notes":null,"River":"Naw Chang  Hka","Function":"HP","Country":"PRC/MYA","Location_L":98.42952,"Location_1":26.023865,"Status":"Proposed","Project Name":"Hkankawn","COD Year":"2026","Project ID":"DAM0112","the_geom":"0101000020E61000004F78094E7D9B5840E08442041C063A40"},{"_id":18,"Catchment  Annual Rainfall (mm)":"3000.000000","Total Powerplant Design Discharge (m3/s)\n":"1804","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":15.4,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"665","Powerhouse Type":"Underground","Dam Type":"CFRD","Reservoir Area (km2)\n":7.9,"Estimated No. Construction Workers (planned projects)\n":"7100","Total Length of Reservoir (km)\n":31,"Reservoir Live Storage (hm3)\n":"229","Reservoir Dead Storage (hm3)\n":"306","Reservoir Retention Period (days)\n":"2","Run-of-River or Storage":"RoR","Township":"Kanglanphu","Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":"153","Qmin/ MAF":0.04,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.73","Installed Capacity (MW)":"2000","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"2524","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":103.7,"District":"Putau","Mean annual inflow (MAF) into reservoir (m3/s)\n":1730,"Developers":"CPI","Sub-Basin (GIS Maps)\n":"Nmae Hka","Status (labelled by IFC)":"MOA","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":54557,"Catchment Area (km2)\n":"16689","Sub-Basin (HP Chapter)\n":"Ayeyarwady Headwaters","Mean annual energy (GW)\n":"2000","Total storage (FSL) (mil. m3)":"535","Notes":null,"River":"N'Mai  Hka","Function":"HP","Country":"PRC","Location_L":98.34309,"Location_1":26.598389,"Status":"Proposed","Project Name":"Pisa","COD Year":"2030","Project ID":"DAM0019","the_geom":"0101000020E61000006B65C22FF59558404149810530993A40"},{"_id":19,"Catchment  Annual Rainfall (mm)":"2964.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":509,"Estimated No. Construction Workers (planned projects)\n":"4600","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":"14610","Reservoir Dead Storage (hm3)\n":"6312","Reservoir Retention Period (days)\n":"47","Run-of-River or Storage":"S","Township":"Htamanthi","Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":"74","Qmin/ MAF":0.16,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.64","Installed Capacity (MW)":"1200","Financiers":"National Hydroelectric Power Corporation (India)","GIS Rainfall\n":null,"Max reservoir area (FSL) (km2)\n":1396,"Unit Flow (l/s/km2)\n":108.8,"District":"Hkamti","Mean annual inflow (MAF) into reservoir (m3/s)\n":3573,"Developers":"NHPC","Sub-Basin (GIS Maps)\n":"Upper Chindwin","Status (labelled by IFC)":"Suspended","State/Region":"Sagaing","Basin":"Chindwin","Annual Runoff into Reservoir (hm3)":112678,"Catchment Area (km2)\n":"109","Sub-Basin (HP Chapter)\n":"Chindwin","Mean annual energy (GW)\n":"1200","Total storage (FSL) (mil. m3)":"20922","Notes":"An article dated Sept. 03, 2013 in the Shan Herald claims that India has cancelled the dam.","River":"Chindwin","Function":"HP","Country":"India","Location_L":95.29695,"Location_1":25.322227,"Status":"Proposed","Project Name":"Tamanthi","COD Year":null,"Project ID":"DAM0199","the_geom":"0101000020E61000008E588B4F01D3574061E3FA777D523940"},{"_id":20,"Catchment  Annual Rainfall (mm)":"2436.000000","Total Powerplant Design Discharge (m3/s)\n":"648","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":3.7,"Transmission Line Connected to S/S\n":"230-kV TL Thaton SS and 33 kV TL Myainnggyingu SS MYA","Full Supply Level (FSL) (m)\n":"48","Powerhouse Type":"At dam toe","Dam Type":"RCC Gravity Dam","Reservoir Area (km2)\n":27.1,"Estimated No. Construction Workers (planned projects)\n":"5100","Total Length of Reservoir (km)\n":16,"Reservoir Live Storage (hm3)\n":"171","Reservoir Dead Storage (hm3)\n":"338","Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"RoR","Township":"Kamamung","Myanmar Selfuse (MW)\n":"136","% use MYA":0.1,"Export (MW)":"1224","Height (m)":"118","Qmin/ MAF":0.32,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.61","Installed Capacity (MW)":"1360","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1540","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":14.2,"District":"Hpapun","Mean annual inflow (MAF) into reservoir (m3/s)\n":4409,"Developers":"Sinohydro+EGATi+IGOEC","Sub-Basin (GIS Maps)\n":"Lower Thanlwin","Status (labelled by IFC)":"MOA","State/Region":"Kayin","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":139042,"Catchment Area (km2)\n":"311167","Sub-Basin (HP Chapter)\n":"Thanlwin Mainstem","Mean annual energy (GW)\n":"1360","Total storage (FSL) (mil. m3)":"509","Notes":"Location: https://en.wikipedia.org/wiki/Hatgyi_Dam.","River":"Thanlwin Mainstem","Function":"HP","Country":"PRC/THA/MYA","Location_L":97.747,"Location_1":17.528,"Status":"Proposed","Project Name":"Hutgyi","COD Year":"2020","Project ID":"DAM0021","the_geom":"0101000020E61000002B8716D9CE6F5840BA490C022B873140"},{"_id":21,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"25","Transmission Line Voltage level (kV)\n":"33","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Taungoo","Full Supply Level (FSL) (m)\n":"119","Powerhouse Type":"Above ground","Dam Type":"Rock/Embankment?","Reservoir Area (km2)\n":150,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":16,"Reservoir Live Storage (hm3)\n":"384","Reservoir Dead Storage (hm3)\n":"1084","Reservoir Retention Period (days)\n":"123","Run-of-River or Storage":"S","Township":"Oak Twin","Myanmar Selfuse (MW)\n":"30","% use MYA":1,"Export (MW)":"0","Height (m)":"61","Qmin/ MAF":0.12,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.46","Installed Capacity (MW)":"30","Financiers":"Sole Investment","GIS Rainfall\n":"2081","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":33.3,"District":"Taungoo","Mean annual inflow (MAF) into reservoir (m3/s)\n":36.1,"Developers":"MoEE/MOALI","Sub-Basin (GIS Maps)\n":"Other Sittaung","Status (labelled by IFC)":"Built","State/Region":"Bago","Basin":"Sittaung","Annual Runoff into Reservoir (hm3)":1138,"Catchment Area (km2)\n":"1083","Sub-Basin (HP Chapter)\n":"Other Sittaung","Mean annual energy (GW)\n":"30","Total storage (FSL) (mil. m3)":"1468","Notes":null,"River":"Kabaung Chaung","Function":"MP","Country":"Myanmar","Location_L":96.220825,"Location_1":18.896717,"Status":"Complete","Project Name":"Kabaung","COD Year":"2008","Project ID":"DAM0022","the_geom":"0101000020E6100000E9482EFF210E584069C4CC3E8FE53240"},{"_id":22,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"51","Transmission Line Length (km)\n":"119","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":4.2,"Transmission Line Connected to S/S\n":"Namsan","Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":"Above ground","Dam Type":"CG","Reservoir Area (km2)\n":0.1,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":0.9,"Reservoir Live Storage (hm3)\n":"52","Reservoir Dead Storage (hm3)\n":"9","Reservoir Retention Period (days)\n":"4","Run-of-River or Storage":"S","Township":"Moenane","Myanmar Selfuse (MW)\n":"54","% use MYA":1,"Export (MW)":"0","Height (m)":"27","Qmin/ MAF":0.22,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":2.2,"Plant Factor":"0.8","Installed Capacity (MW)":"54","Financiers":"Sole Investment","GIS Rainfall\n":"1475","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":19.5,"District":"Linkhe","Mean annual inflow (MAF) into reservoir (m3/s)\n":164.8,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Nam Teng","Status (labelled by IFC)":"Built","State/Region":"Shan","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":5196,"Catchment Area (km2)\n":"8450","Sub-Basin (HP Chapter)\n":"Nam Teng","Mean annual energy (GW)\n":"54","Total storage (FSL) (mil. m3)":"61","Notes":"Google Earth visible.","River":"Nam Teng","Function":"HP","Country":"Myanmar","Location_L":98.29305,"Location_1":20.598345,"Status":"Complete","Project Name":"Keng Tawng","COD Year":"2009","Project ID":"DAM0023","the_geom":"0101000020E6100000F085C954C1925840A1B94E232D993440"},{"_id":23,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"154","Transmission Line Length (km)\n":"73","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":4.6,"Transmission Line Connected to S/S\n":"Namsan","Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":"Semi underground","Dam Type":"Rockfill","Reservoir Area (km2)\n":23.3,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":"110","Reservoir Dead Storage (hm3)\n":"19","Reservoir Retention Period (days)\n":"9","Run-of-River or Storage":"S","Township":"Keng Tawng","Myanmar Selfuse (MW)\n":"51","% use MYA":1,"Export (MW)":"0","Height (m)":"56","Qmin/ MAF":0.23,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.52","Installed Capacity (MW)":"51","Financiers":"Sole Investment","GIS Rainfall\n":"1475","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":19.5,"District":"Linkhe","Mean annual inflow (MAF) into reservoir (m3/s)\n":146.4,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Nam Teng","Status (labelled by IFC)":"Construction","State/Region":"Shan","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":4618,"Catchment Area (km2)\n":"7510","Sub-Basin (HP Chapter)\n":"Nam Teng","Mean annual energy (GW)\n":"51","Total storage (FSL) (mil. m3)":"128","Notes":"Google Earth visible.","River":"Nam Teng","Function":"HP","Country":"Myanmar","Location_L":98.184074,"Location_1":20.74558,"Status":"UC","Project Name":"Keng Tawng (upper)","COD Year":"2019","Project ID":"DAM0024","the_geom":"0101000020E610000088BCE5EAC78B58403B8DB454DEBE3440"},{"_id":24,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":8.4,"Estimated No. Construction Workers (planned projects)\n":"700","Total Length of Reservoir (km)\n":26,"Reservoir Live Storage (hm3)\n":"12","Reservoir Dead Storage (hm3)\n":"21","Reservoir Retention Period (days)\n":"1","Run-of-River or Storage":"RoR","Township":null,"Myanmar Selfuse (MW)\n":"85","% use MYA":0.5,"Export (MW)":"85","Height (m)":null,"Qmin/ MAF":0.2,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.36","Installed Capacity (MW)":"170","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1381","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":24.4,"District":"Mongkhak","Mean annual inflow (MAF) into reservoir (m3/s)\n":111,"Developers":"YNIC","Sub-Basin (GIS Maps)\n":"Nam Lwe","Status (labelled by IFC)":"MOU","State/Region":"Shan","Basin":"Mekong","Annual Runoff into Reservoir (hm3)":3500,"Catchment Area (km2)\n":"4543","Sub-Basin (HP Chapter)\n":"Nam Lwe","Mean annual energy (GW)\n":"170","Total storage (FSL) (mil. m3)":"32","Notes":null,"River":"Nam Lwe","Function":"HP","Country":"PRC","Location_L":99.500984,"Location_1":21.6178,"Status":"Proposed","Project Name":"Keng Tong","COD Year":"2025","Project ID":"DAM0025","the_geom":"0101000020E610000057B2632310E0584063804413289E3540"},{"_id":25,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":5.4,"Estimated No. Construction Workers (planned projects)\n":"300","Total Length of Reservoir (km)\n":24,"Reservoir Live Storage (hm3)\n":"8","Reservoir Dead Storage (hm3)\n":"33","Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"RoR","Township":null,"Myanmar Selfuse (MW)\n":"35","% use MYA":0.5,"Export (MW)":"35","Height (m)":null,"Qmin/ MAF":0.2,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.25","Installed Capacity (MW)":"70","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1381","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":23.8,"District":"He Kou","Mean annual inflow (MAF) into reservoir (m3/s)\n":340,"Developers":"YNIC","Sub-Basin (GIS Maps)\n":"Nam Lwe","Status (labelled by IFC)":"MOU","State/Region":"Shan","Basin":"Mekong","Annual Runoff into Reservoir (hm3)":10722,"Catchment Area (km2)\n":"14260","Sub-Basin (HP Chapter)\n":"Nam Lwe","Mean annual energy (GW)\n":"70","Total storage (FSL) (mil. m3)":"41","Notes":null,"River":"Nam Lwe","Function":"HP","Country":"PRC","Location_L":100.5619,"Location_1":21.3469,"Status":"Proposed","Project Name":"Keng Yang","COD Year":"2025","Project ID":"DAM0026","the_geom":"0101000020E6100000D5E76A2BF62359407FFB3A70CE583540"},{"_id":26,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"1611","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":9.5,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"875","Powerhouse Type":"Underground","Dam Type":"CFRD","Reservoir Area (km2)\n":32.9,"Estimated No. Construction Workers (planned projects)\n":"9100","Total Length of Reservoir (km)\n":85,"Reservoir Live Storage (hm3)\n":"1526","Reservoir Dead Storage (hm3)\n":"1574","Reservoir Retention Period (days)\n":"12","Run-of-River or Storage":"S","Township":"Kanglanphu","Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":"223","Qmin/ MAF":0.11,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.62","Installed Capacity (MW)":"2700","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1540","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":102.4,"District":"Puta-O","Mean annual inflow (MAF) into reservoir (m3/s)\n":1500,"Developers":"CPI","Sub-Basin (GIS Maps)\n":"Nmae Hka","Status (labelled by IFC)":"MOA","State/Region":"Kachin","Basin":null,"Annual Runoff into Reservoir (hm3)":47304,"Catchment Area (km2)\n":"14655","Sub-Basin (HP Chapter)\n":"Ayeyarwady Headwaters","Mean annual energy (GW)\n":"2700","Total storage (FSL) (mil. m3)":"3100","Notes":null,"River":"N'Mai  Hka","Function":"HP","Country":"PRC","Location_L":98.37681,"Location_1":26.849506,"Status":"Proposed","Project Name":"Khaunglanphu","COD Year":"2030","Project ID":"DAM0121","the_geom":"0101000020E6100000C1374D9F1D9858401BB96E4A79D93A40"},{"_id":27,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"0","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Ingone,Thazi","Full Supply Level (FSL) (m)\n":"193","Powerhouse Type":"Above ground","Dam Type":"Rockfill","Reservoir Area (km2)\n":28.6,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":14.5,"Reservoir Live Storage (hm3)\n":"871","Reservoir Dead Storage (hm3)\n":"207","Reservoir Retention Period (days)\n":"290","Run-of-River or Storage":"S","Township":"Kyaukse","Myanmar Selfuse (MW)\n":"56","% use MYA":1,"Export (MW)":"0","Height (m)":"72","Qmin/ MAF":0.2,"Crest Length (m)":"620.000000","Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.34","Installed Capacity (MW)":"56","Financiers":"Sole Investment","GIS Rainfall\n":null,"Max reservoir area (FSL) (km2)\n":43.38,"Unit Flow (l/s/km2)\n":15.5,"District":"Taunggyi","Mean annual inflow (MAF) into reservoir (m3/s)\n":34.7,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Zawgyi/Myogyi","Status (labelled by IFC)":"Built","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":1094,"Catchment Area (km2)\n":"2240","Sub-Basin (HP Chapter)\n":"Myitnge","Mean annual energy (GW)\n":"56","Total storage (FSL) (mil. m3)":"1078","Notes":"Google Earth visible.","River":"Panlaung Chaung","Function":"MP","Country":"Myanmar","Location_L":96.32104,"Location_1":21.160437,"Status":"Complete","Project Name":"Kinda","COD Year":"1990","Project ID":"DAM0028","the_geom":"0101000020E610000095F3C5DE8B1458408011346612293540"},{"_id":28,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"41","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Chauk","Full Supply Level (FSL) (m)\n":"190","Powerhouse Type":"Above ground","Dam Type":"Earth/Rock","Reservoir Area (km2)\n":150,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":23,"Reservoir Live Storage (hm3)\n":"1135","Reservoir Dead Storage (hm3)\n":"333","Reservoir Retention Period (days)\n":"376","Run-of-River or Storage":"S","Township":"Pyu","Myanmar Selfuse (MW)\n":"60","% use MYA":1,"Export (MW)":"0","Height (m)":"73","Qmin/ MAF":0.09,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":2.5,"Plant Factor":"0.36","Installed Capacity (MW)":"60","Financiers":"Sole Investment","GIS Rainfall\n":"2081","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":40.8,"District":"Bago","Mean annual inflow (MAF) into reservoir (m3/s)\n":34.9,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Other Sittaung","Status (labelled by IFC)":"Built","State/Region":"Bago","Basin":null,"Annual Runoff into Reservoir (hm3)":1101,"Catchment Area (km2)\n":"855","Sub-Basin (HP Chapter)\n":"Other Sittaung","Mean annual energy (GW)\n":"60","Total storage (FSL) (mil. m3)":"1468","Notes":null,"River":"Kun Chaung","Function":"MP","Country":"Myanmar","Location_L":96.36385,"Location_1":18.420366,"Status":"Complete","Project Name":"Kun Chaung","COD Year":"2012","Project ID":"DAM0125","the_geom":"0101000020E610000034A14962491758405051F52B9D6B3240"},{"_id":29,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"620","Transmission Line Length (km)\n":"68","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":6.1,"Transmission Line Connected to S/S\n":"Theinni","Full Supply Level (FSL) (m)\n":"519","Powerhouse Type":"At dam toe","Dam Type":"CG","Reservoir Area (km2)\n":65.4,"Estimated No. Construction Workers (planned projects)\n":"5200","Total Length of Reservoir (km)\n":55,"Reservoir Live Storage (hm3)\n":"208","Reservoir Dead Storage (hm3)\n":"483","Reservoir Retention Period (days)\n":"1","Run-of-River or Storage":"RoR","Township":"Kunlong","Myanmar Selfuse (MW)\n":"700","% use MYA":0.5,"Export (MW)":"700","Height (m)":"103","Qmin/ MAF":0.27,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.58","Installed Capacity (MW)":"1400","Financiers":"Foreign JV/BOT","GIS Rainfall\n":null,"Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":14.8,"District":"Kunlong","Mean annual inflow (MAF) into reservoir (m3/s)\n":1910,"Developers":"Hanergy YN, MPC","Sub-Basin (GIS Maps)\n":"Upper Thanlwin","Status (labelled by IFC)":"JVA","State/Region":"Shan","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":60234,"Catchment Area (km2)\n":"128989","Sub-Basin (HP Chapter)\n":"Thanlwin Mainstem","Mean annual energy (GW)\n":"1400","Total storage (FSL) (mil. m3)":"691","Notes":null,"River":"Thanlwin Mainstem","Function":"HP","Country":"PRC/MYA","Location_L":98.611115,"Location_1":23.531668,"Status":"Proposed","Project Name":"KunLong","COD Year":"2023","Project ID":"DAM0030","the_geom":"0101000020E610000074CE4F711CA75840C85C19541B883740"},{"_id":30,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"70","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Mann","Full Supply Level (FSL) (m)\n":"120","Powerhouse Type":"Above ground","Dam Type":"Earth","Reservoir Area (km2)\n":32.8,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":29.8,"Reservoir Live Storage (hm3)\n":"571","Reservoir Dead Storage (hm3)\n":"0","Reservoir Retention Period (days)\n":"52","Run-of-River or Storage":"S","Township":"Sidoktaya","Myanmar Selfuse (MW)\n":"74","% use MYA":1,"Export (MW)":"0","Height (m)":"50","Qmin/ MAF":0.1,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.57","Installed Capacity (MW)":"74","Financiers":"Sole Investment","GIS Rainfall\n":"1694","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":24.9,"District":"Minbu","Mean annual inflow (MAF) into reservoir (m3/s)\n":126.9,"Developers":"MOALI","Sub-Basin (GIS Maps)\n":"Mone Chaung","Status (labelled by IFC)":"Built","State/Region":"Magway","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":4002,"Catchment Area (km2)\n":"5100","Sub-Basin (HP Chapter)\n":"Mone Chaung","Mean annual energy (GW)\n":"74","Total storage (FSL) (mil. m3)":"571","Notes":null,"River":"Mon Chaung","Function":"MP","Country":"Myanmar","Location_L":94.416,"Location_1":20.331,"Status":"Complete","Project Name":"Kyee Ohn Kyee Wa","COD Year":"2012","Project ID":"DAM0031","the_geom":"0101000020E6100000B4C876BE9F9A5740DBF97E6ABC543440"},{"_id":31,"Catchment  Annual Rainfall (mm)":"3124.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"16","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Tongxinqiao","Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":12.4,"Estimated No. Construction Workers (planned projects)\n":"2400","Total Length of Reservoir (km)\n":10.7,"Reservoir Live Storage (hm3)\n":"40","Reservoir Dead Storage (hm3)\n":"27","Reservoir Retention Period (days)\n":"3","Run-of-River or Storage":"RoR","Township":"Tsawlaw","Myanmar Selfuse (MW)\n":"300","% use MYA":0.5,"Export (MW)":"300","Height (m)":"79","Qmin/ MAF":0.33,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.46","Installed Capacity (MW)":"600","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1540","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":74,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":154,"Developers":"YEIG/IGOEC","Sub-Basin (GIS Maps)\n":"Naw Chang  Hka","Status (labelled by IFC)":"MOA","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":4857,"Catchment Area (km2)\n":"2080","Sub-Basin (HP Chapter)\n":"Ayeyarwady Headwaters","Mean annual energy (GW)\n":"600","Total storage (FSL) (mil. m3)":"67","Notes":null,"River":"Naw Chang  Hka","Function":"HP","Country":"PRC/MYA","Location_L":98.27774,"Location_1":26.043013,"Status":"Proposed","Project Name":"Lawngdin","COD Year":"2026","Project ID":"DAM0134","the_geom":"0101000020E6100000596C938AC6915840E7559DD5020B3A40"},{"_id":32,"Catchment  Annual Rainfall (mm)":"3560.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":36,"Estimated No. Construction Workers (planned projects)\n":"2400","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":"7609","Reservoir Dead Storage (hm3)\n":"1520","Reservoir Retention Period (days)\n":"218","Run-of-River or Storage":"S","Township":null,"Myanmar Selfuse (MW)\n":"600","% use MYA":1,"Export (MW)":"0","Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.68","Installed Capacity (MW)":"600","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"2750","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":61.8,"District":"Mindat","Mean annual inflow (MAF) into reservoir (m3/s)\n":404,"Developers":"Tractabel","Sub-Basin (GIS Maps)\n":"Lemro","Status (labelled by IFC)":"MOU","State/Region":"Chin","Basin":"Rakhine","Annual Runoff into Reservoir (hm3)":12741,"Catchment Area (km2)\n":"6535","Sub-Basin (HP Chapter)\n":"Lemro","Mean annual energy (GW)\n":"600","Total storage (FSL) (mil. m3)":"9129","Notes":null,"River":"Le Mro","Function":"HP","Country":"France","Location_L":93.3505,"Location_1":20.857443,"Status":"Proposed","Project Name":"Lemro 1","COD Year":null,"Project ID":"DAM0033","the_geom":"0101000020E6100000988922A46E565740232F6B6281DB3440"},{"_id":33,"Catchment  Annual Rainfall (mm)":"3000.000000","Total Powerplant Design Discharge (m3/s)\n":"1844","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":4.4,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"370","Powerhouse Type":null,"Dam Type":"CFRD","Reservoir Area (km2)\n":245.5,"Estimated No. Construction Workers (planned projects)\n":"6800","Total Length of Reservoir (km)\n":115,"Reservoir Live Storage (hm3)\n":"5700","Reservoir Dead Storage (hm3)\n":"6080","Reservoir Retention Period (days)\n":"35","Run-of-River or Storage":"S","Township":"Sumprabum","Myanmar Selfuse (MW)\n":"950","% use MYA":0.5,"Export (MW)":"950","Height (m)":"196","Qmin/ MAF":0.22,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.88","Installed Capacity (MW)":"1900","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"2524","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":123.6,"District":"Puta-O","Mean annual inflow (MAF) into reservoir (m3/s)\n":1890,"Developers":"CPIYN","Sub-Basin (GIS Maps)\n":"Mali Hka","Status (labelled by IFC)":"JVA","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":59603,"Catchment Area (km2)\n":"15291","Sub-Basin (HP Chapter)\n":"Ayeyarwady Headwaters","Mean annual energy (GW)\n":"1900","Total storage (FSL) (mil. m3)":"11780","Notes":null,"River":"Mali Hka","Function":"HP","Country":"PRC","Location_L":97.77695,"Location_1":26.49178,"Status":"Proposed","Project Name":"Laza","COD Year":"2025","Project ID":"DAM0034","the_geom":"0101000020E610000024287E8CB97158400EDC813AE57D3A40"},{"_id":34,"Catchment  Annual Rainfall (mm)":"3335.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":193,"Estimated No. Construction Workers (planned projects)\n":"400","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":"4","Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":"ROR","Township":"Mrauk Oo","Myanmar Selfuse (MW)\n":"90","% use MYA":1,"Export (MW)":"0","Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.35","Installed Capacity (MW)":"90","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"2750","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":63.4,"District":"Mrauk Oo","Mean annual inflow (MAF) into reservoir (m3/s)\n":530,"Developers":"Tractabel","Sub-Basin (GIS Maps)\n":"Lemro","Status (labelled by IFC)":"MOU","State/Region":"Rakhine","Basin":"Rakhine","Annual Runoff into Reservoir (hm3)":16714,"Catchment Area (km2)\n":"8355","Sub-Basin (HP Chapter)\n":"Lemro","Mean annual energy (GW)\n":"90","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Le Mro","Function":"HP","Country":"France","Location_L":93.26869,"Location_1":20.740347,"Status":"Proposed","Project Name":"Lemro 2","COD Year":null,"Project ID":"DAM0035","the_geom":"0101000020E6100000E0F258333251574014B1886187BD3440"},{"_id":35,"Catchment  Annual Rainfall (mm)":"1100.000000","Total Powerplant Design Discharge (m3/s)\n":"260","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":8.7,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"292","Powerhouse Type":"At dam toe","Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"400","Total Length of Reservoir (km)\n":36,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":"105","% use MYA":1,"Export (MW)":"0","Height (m)":"88","Qmin/ MAF":0.19,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.67","Installed Capacity (MW)":"105","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1446","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":19.8,"District":"Loikaw","Mean annual inflow (MAF) into reservoir (m3/s)\n":155.6,"Developers":"TEI/HCTC","Sub-Basin (GIS Maps)\n":"Nam Pawn","Status (labelled by IFC)":"MOU","State/Region":"Kayah","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":4907,"Catchment Area (km2)\n":"7860","Sub-Basin (HP Chapter)\n":"Nam Pawn","Mean annual energy (GW)\n":"105","Total storage (FSL) (mil. m3)":"526","Notes":null,"River":"Nam Pawn","Function":"HP","Country":"SIN/MYA","Location_L":97.40861,"Location_1":19.555,"Status":"Proposed","Project Name":"Nam Pawn (lower)","COD Year":"2020","Project ID":"DAM0036","the_geom":"0101000020E61000004B72C0AE265A5840AE47E17A148E3340"},{"_id":36,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"395","Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":870,"Estimated No. Construction Workers (planned projects)\n":"14500","Total Length of Reservoir (km)\n":380,"Reservoir Live Storage (hm3)\n":"37399","Reservoir Dead Storage (hm3)\n":"2401","Reservoir Retention Period (days)\n":"156","Run-of-River or Storage":"S","Township":"Mongtong","Myanmar Selfuse (MW)\n":"700","% use MYA":0.1,"Export (MW)":"6300","Height (m)":"241","Qmin/ MAF":0.32,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.57","Installed Capacity (MW)":"7000","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1406","Max reservoir area (FSL) (km2)\n":870,"Unit Flow (l/s/km2)\n":15.1,"District":"Monghsat","Mean annual inflow (MAF) into reservoir (m3/s)\n":2776,"Developers":"Three Gorges+EGAT","Sub-Basin (GIS Maps)\n":"Middle Thanlwin","Status (labelled by IFC)":"MOU","State/Region":"Shan","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":87544,"Catchment Area (km2)\n":"183265","Sub-Basin (HP Chapter)\n":"Thanlwin Mainstem","Mean annual energy (GW)\n":"7000","Total storage (FSL) (mil. m3)":"39800","Notes":"Location derived from https://en.wikipedia.org/wiki/Dams_in_Myanmar#Hydroelectric","River":"Thanlwin Mainstem","Function":"HP","Country":"PRC/Thailand","Location_L":98.65,"Location_1":20.456388,"Status":"Proposed","Project Name":"Mong Ton","COD Year":"2030","Project ID":"DAM0037","the_geom":"0101000020E61000009A99999999A958401041D5E8D5743440"},{"_id":37,"Catchment  Annual Rainfall (mm)":"1500.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"32","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"GaNaw-Kalay In/out","Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"1500","Total Length of Reservoir (km)\n":45,"Reservoir Live Storage (hm3)\n":"874","Reservoir Dead Storage (hm3)\n":"769","Reservoir Retention Period (days)\n":"52","Run-of-River or Storage":"S","Township":"Kalay","Myanmar Selfuse (MW)\n":"380","% use MYA":1,"Export (MW)":"0","Height (m)":"168","Qmin/ MAF":0.34,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.57","Installed Capacity (MW)":"380","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1803","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":16.7,"District":"Falam","Mean annual inflow (MAF) into reservoir (m3/s)\n":193,"Developers":"CHEC/Sein","Sub-Basin (GIS Maps)\n":"Manipur","Status (labelled by IFC)":"MOU","State/Region":"Chin","Basin":"Chindwin","Annual Runoff into Reservoir (hm3)":6086,"Catchment Area (km2)\n":"11549","Sub-Basin (HP Chapter)\n":"Manipur","Mean annual energy (GW)\n":"380","Total storage (FSL) (mil. m3)":"1643","Notes":"Earthworks Google Earth visible.","River":"Manipur","Function":"MP","Country":"PRC/MYA","Location_L":93.943245,"Location_1":22.804356,"Status":"UC","Project Name":"Manipur","COD Year":"2020","Project ID":"DAM0142","the_geom":"0101000020E61000001D01DC2C5E7C574064575A46EACD3640"},{"_id":38,"Catchment  Annual Rainfall (mm)":"1630.000000","Total Powerplant Design Discharge (m3/s)\n":"282","Transmission Line Length (km)\n":"105","Transmission Line Voltage level (kV)\n":"500","Turbine Discharge/ Min Flow\n":9.1,"Transmission Line Connected to S/S\n":"Theinni","Full Supply Level (FSL) (m)\n":"492","Powerhouse Type":"River-bank","Dam Type":"CFRD","Reservoir Area (km2)\n":10.5,"Estimated No. Construction Workers (planned projects)\n":"900","Total Length of Reservoir (km)\n":86,"Reservoir Live Storage (hm3)\n":"498","Reservoir Dead Storage (hm3)\n":"717","Reservoir Retention Period (days)\n":"74","Run-of-River or Storage":"S","Township":"Minemaw","Myanmar Selfuse (MW)\n":"113","% use MYA":0.5,"Export (MW)":"113","Height (m)":"109","Qmin/ MAF":0.78,"Crest Length (m)":"518.000000","Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.47","Installed Capacity (MW)":"225","Financiers":"Foreign JV/BOT","GIS Rainfall\n":null,"Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":19.9,"District":"Hopang","Mean annual inflow (MAF) into reservoir (m3/s)\n":78.3,"Developers":"HydroChina/IGOEC","Sub-Basin (GIS Maps)\n":"Nam Ma","Status (labelled by IFC)":"MOA","State/Region":"Shan","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":2469,"Catchment Area (km2)\n":"3936","Sub-Basin (HP Chapter)\n":"Nam Ma","Mean annual energy (GW)\n":"225","Total storage (FSL) (mil. m3)":"1215","Notes":"Location: http://www.burmariversnetwork.org/index.php?option=com_content&view=article&id=981&Itemid=392; also http://www.irrawaddy.com/burma/meeting-salween-dams-troubles-shan-communities.html/attachment/map-shan-ngo-dams","River":"Nam Ma","Function":"HP","Country":"PRC/MYA","Location_L":98.55727,"Location_1":22.97469,"Status":"Proposed","Project Name":"Mantong","COD Year":"2024","Project ID":"DAM0039","the_geom":"0101000020E6100000AF42CA4FAAA35840FDBCA94885F93640"},{"_id":39,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"160","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Chauk","Full Supply Level (FSL) (m)\n":"167","Powerhouse Type":"Above ground","Dam Type":"Rockfill","Reservoir Area (km2)\n":41.5,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":19.4,"Reservoir Live Storage (hm3)\n":"642","Reservoir Dead Storage (hm3)\n":"190","Reservoir Retention Period (days)\n":"76","Run-of-River or Storage":"S","Township":"Setoktaya","Myanmar Selfuse (MW)\n":"75","% use MYA":1,"Export (MW)":"0","Height (m)":"61","Qmin/ MAF":0.1,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.5","Installed Capacity (MW)":"75","Financiers":"Sole Investment","GIS Rainfall\n":"1694","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":26.3,"District":"Minbu","Mean annual inflow (MAF) into reservoir (m3/s)\n":97.3,"Developers":"MoEE/MOALI","Sub-Basin (GIS Maps)\n":"Mone Chaung","Status (labelled by IFC)":"Built","State/Region":"Magway","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":3068,"Catchment Area (km2)\n":"3695","Sub-Basin (HP Chapter)\n":"Mone Chaung","Mean annual energy (GW)\n":"75","Total storage (FSL) (mil. m3)":"832","Notes":null,"River":"Mon Chaung","Function":"MP","Country":"Myanmar","Location_L":94.255325,"Location_1":20.479942,"Status":"Complete","Project Name":"Mone Chaung","COD Year":"2004","Project ID":"DAM0040","the_geom":"0101000020E61000007A36AB3E5790574012FA997ADD7A3440"},{"_id":40,"Catchment  Annual Rainfall (mm)":"1535.000000","Total Powerplant Design Discharge (m3/s)\n":"294","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":5.3,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"555","Powerhouse Type":"Riverbed type","Dam Type":"Gravity Dam","Reservoir Area (km2)\n":8,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":30.5,"Reservoir Live Storage (hm3)\n":"22","Reservoir Dead Storage (hm3)\n":"56","Reservoir Retention Period (days)\n":"1","Run-of-River or Storage":"RoR","Township":"KengTung","Myanmar Selfuse (MW)\n":"66","% use MYA":1,"Export (MW)":"0","Height (m)":"51","Qmin/ MAF":0.19,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.57","Installed Capacity (MW)":"66","Financiers":"Local BOT","GIS Rainfall\n":"1381","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":20.7,"District":"Mong Yawng","Mean annual inflow (MAF) into reservoir (m3/s)\n":285,"Developers":"ESDC","Sub-Basin (GIS Maps)\n":"Nam Lwe","Status (labelled by IFC)":"Built","State/Region":"Shan","Basin":"Mekong","Annual Runoff into Reservoir (hm3)":8988,"Catchment Area (km2)\n":"13800","Sub-Basin (HP Chapter)\n":"Nam Lwe","Mean annual energy (GW)\n":"66","Total storage (FSL) (mil. m3)":"78","Notes":null,"River":"Nam Lwe","Function":"HP","Country":"Myanmar","Location_L":100.32582,"Location_1":21.39699,"Status":"Complete","Project Name":"Mongwa","COD Year":"2017","Project ID":"DAM0041","the_geom":"0101000020E610000067D65240DA145940CBD6FA22A1653540"},{"_id":41,"Catchment  Annual Rainfall (mm)":"3234.000000","Total Powerplant Design Discharge (m3/s)\n":"7158","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":11.8,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"245","Powerhouse Type":"Above ground","Dam Type":"CFRD","Reservoir Area (km2)\n":397,"Estimated No. Construction Workers (planned projects)\n":"14200","Total Length of Reservoir (km)\n":140,"Reservoir Live Storage (hm3)\n":"4503","Reservoir Dead Storage (hm3)\n":"8687","Reservoir Retention Period (days)\n":"10","Run-of-River or Storage":"S","Township":"Myitkyina","Myanmar Selfuse (MW)\n":"600","% use MYA":0.1,"Export (MW)":"5400","Height (m)":"140","Qmin/ MAF":0.12,"Crest Length (m)":"1310.000000","Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.6","Installed Capacity (MW)":"6000","Financiers":"Foreign JV/BOT","GIS Rainfall\n":null,"Max reservoir area (FSL) (km2)\n":262.4,"Unit Flow (l/s/km2)\n":103.3,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":5040,"Developers":"CPIYN/AWC","Sub-Basin (GIS Maps)\n":"Upper Ayeyarwady Mainstem","Status (labelled by IFC)":"JVA","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":158941,"Catchment Area (km2)\n":"48782","Sub-Basin (HP Chapter)\n":"Ayeyarwady","Mean annual energy (GW)\n":"6000","Total storage (FSL) (mil. m3)":"13190","Notes":null,"River":"Ayeyarwady","Function":"HP","Country":"PRC/MYA","Location_L":97.535,"Location_1":25.715,"Status":"Suspended","Project Name":"Myitsone","COD Year":null,"Project ID":"DAM0150","the_geom":"0101000020E61000000AD7A3703D625840D7A3703D0AB73940"},{"_id":42,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"38","Transmission Line Length (km)\n":"40","Transmission Line Voltage level (kV)\n":"66","Turbine Discharge/ Min Flow\n":24,"Transmission Line Connected to S/S\n":"GaNaw","Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":"Earth","Reservoir Area (km2)\n":12.2,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":"172","Reservoir Dead Storage (hm3)\n":"153","Reservoir Retention Period (days)\n":"45","Run-of-River or Storage":"S","Township":"GaNaw","Myanmar Selfuse (MW)\n":"40","% use MYA":1,"Export (MW)":"0","Height (m)":"63","Qmin/ MAF":0.04,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.49","Installed Capacity (MW)":"40","Financiers":"Sole Investment","GIS Rainfall\n":"1542","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":24.2,"District":"GaNaw","Mean annual inflow (MAF) into reservoir (m3/s)\n":43.9,"Developers":"MOALI","Sub-Basin (GIS Maps)\n":"Myittha","Status (labelled by IFC)":"Built","State/Region":"Magway","Basin":"Chindwin","Annual Runoff into Reservoir (hm3)":1384,"Catchment Area (km2)\n":"1813","Sub-Basin (HP Chapter)\n":"Myittha","Mean annual energy (GW)\n":"40","Total storage (FSL) (mil. m3)":"325","Notes":null,"River":"Myittha","Function":"MP","Country":"Myanmar","Location_L":94.03694,"Location_1":21.992222,"Status":"Complete","Project Name":"Myittha","COD Year":"2017","Project ID":"DAM0043","the_geom":"0101000020E610000024F25D4A5D825740295FD04202FE3540"},{"_id":43,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"16","Transmission Line Voltage level (kV)\n":"33","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Taungtawgwin","Full Supply Level (FSL) (m)\n":"193","Powerhouse Type":"Above ground","Dam Type":null,"Reservoir Area (km2)\n":9.7,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":10.7,"Reservoir Live Storage (hm3)\n":"274","Reservoir Dead Storage (hm3)\n":"170","Reservoir Retention Period (days)\n":"45","Run-of-River or Storage":"S","Township":"Ywa Ngan","Myanmar Selfuse (MW)\n":"30","% use MYA":1,"Export (MW)":"0","Height (m)":"79","Qmin/ MAF":0.16,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.52","Installed Capacity (MW)":"30","Financiers":"Sole Investment","GIS Rainfall\n":"1185","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":18.3,"District":"Taunggyi","Mean annual inflow (MAF) into reservoir (m3/s)\n":70.9,"Developers":"MOALI","Sub-Basin (GIS Maps)\n":"Zawgyi/Myogyi","Status (labelled by IFC)":"Built","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":2236,"Catchment Area (km2)\n":"3873","Sub-Basin (HP Chapter)\n":"Myitnge","Mean annual energy (GW)\n":"30","Total storage (FSL) (mil. m3)":"443","Notes":null,"River":"Zawgyi River","Function":"MP","Country":"Myanmar","Location_L":96.39144,"Location_1":21.46349,"Status":"Complete","Project Name":"Myogyi","COD Year":"2015","Project ID":"DAM0151","the_geom":"0101000020E610000029965B5A0D195840E605D847A7763540"},{"_id":44,"Catchment  Annual Rainfall (mm)":"1378.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"483","Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":75.1,"Estimated No. Construction Workers (planned projects)\n":"900","Total Length of Reservoir (km)\n":80,"Reservoir Live Storage (hm3)\n":"266","Reservoir Dead Storage (hm3)\n":"184","Reservoir Retention Period (days)\n":"19","Run-of-River or Storage":"S","Township":"Mong Sat","Myanmar Selfuse (MW)\n":"105","% use MYA":0.5,"Export (MW)":"105","Height (m)":"120","Qmin/ MAF":0.68,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.51","Installed Capacity (MW)":"210","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1356","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":21.1,"District":"Hopang","Mean annual inflow (MAF) into reservoir (m3/s)\n":165,"Developers":"YNIC","Sub-Basin (GIS Maps)\n":"Nam Hka","Status (labelled by IFC)":"MOU","State/Region":"Shan","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":5203,"Catchment Area (km2)\n":"7827","Sub-Basin (HP Chapter)\n":"Nam Hka","Mean annual energy (GW)\n":"210","Total storage (FSL) (mil. m3)":"450","Notes":null,"River":"Nam Hka","Function":"HP","Country":"PRC","Location_L":98.95004,"Location_1":21.733822,"Status":"Proposed","Project Name":"Nam Hka","COD Year":"2025","Project ID":"DAM0265","the_geom":"0101000020E6100000B5705985CDBC5840361E6CB1DBBB3540"},{"_id":45,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"100","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":"30","% use MYA":1,"Export (MW)":"0","Height (m)":null,"Qmin/ MAF":0.19,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":null,"Installed Capacity (MW)":"30","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1628","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":25.9,"District":"Hsipaw","Mean annual inflow (MAF) into reservoir (m3/s)\n":35.4,"Developers":"PCR/SE","Sub-Basin (GIS Maps)\n":"Upper Myitnge","Status (labelled by IFC)":"MOU","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":1116,"Catchment Area (km2)\n":"1368","Sub-Basin (HP Chapter)\n":"Myitnge","Mean annual energy (GW)\n":"30","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Myitnge Upper","Function":"HP","Country":"PRC/MYA","Location_L":97.12408,"Location_1":22.560266,"Status":"Proposed","Project Name":"Nam Hsim","COD Year":"2020","Project ID":"DAM0046","the_geom":"0101000020E6100000B4C70BE9F04758408C0FB3976D8F3640"},{"_id":46,"Catchment  Annual Rainfall (mm)":"1150.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"900","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":"210","% use MYA":1,"Export (MW)":"0","Height (m)":null,"Qmin/ MAF":0.17,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":null,"Installed Capacity (MW)":"210","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1628","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":21.5,"District":"Hsipaw","Mean annual inflow (MAF) into reservoir (m3/s)\n":143,"Developers":"PCR/SE","Sub-Basin (GIS Maps)\n":"Upper Myitnge","Status (labelled by IFC)":"MOU","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":4510,"Catchment Area (km2)\n":"6664","Sub-Basin (HP Chapter)\n":"Myitnge","Mean annual energy (GW)\n":"210","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Myitnge Upper","Function":"HP","Country":"PRC/MYA","Location_L":97.24861,"Location_1":22.155565,"Status":"Proposed","Project Name":"Nam Lang","COD Year":"2020","Project ID":"DAM0047","the_geom":"0101000020E6100000E292E34EE94F5840F9669B1BD3273640"},{"_id":47,"Catchment  Annual Rainfall (mm)":"2913.000000","Total Powerplant Design Discharge (m3/s)\n":"33","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":4.3,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"590","Powerhouse Type":null,"Dam Type":"CG","Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"700","Total Length of Reservoir (km)\n":1,"Reservoir Live Storage (hm3)\n":"1","Reservoir Dead Storage (hm3)\n":"0","Reservoir Retention Period (days)\n":"1","Run-of-River or Storage":"RoR","Township":"Wyunmaw","Myanmar Selfuse (MW)\n":"165","% use MYA":1,"Export (MW)":"0","Height (m)":"44","Qmin/ MAF":0.29,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":15,"Plant Factor":"0.33","Installed Capacity (MW)":"165","Financiers":"Foreign JV/BOT","GIS Rainfall\n":null,"Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":63.9,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":26.7,"Developers":"YBEP/Chan Yinn Khuu","Sub-Basin (GIS Maps)\n":"Nmae Hka","Status (labelled by IFC)":"MOU","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":842,"Catchment Area (km2)\n":"418","Sub-Basin (HP Chapter)\n":"Ayeyarwady Headwaters","Mean annual energy (GW)\n":"165","Total storage (FSL) (mil. m3)":"2","Notes":null,"River":"N'Mai  Hka Tributary","Function":"HP","Country":"PRC/MYA","Location_L":97.811424,"Location_1":25.369858,"Status":"Proposed","Project Name":"Nam Li","COD Year":"2020","Project ID":"DAM0155","the_geom":"0101000020E6100000D905836BEE735840FA298E03AF5E3940"},{"_id":48,"Catchment  Annual Rainfall (mm)":"2964.000000","Total Powerplant Design Discharge (m3/s)\n":"304","Transmission Line Length (km)\n":"48","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":53,"Transmission Line Connected to S/S\n":"Tacheleik","Full Supply Level (FSL) (m)\n":"397","Powerhouse Type":"Riverbed","Dam Type":"CG","Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"100","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":"12","Reservoir Dead Storage (hm3)\n":"2","Reservoir Retention Period (days)\n":"3","Run-of-River or Storage":"RoR","Township":"Tachileik","Myanmar Selfuse (MW)\n":"36","% use MYA":1,"Export (MW)":"0","Height (m)":"26","Qmin/ MAF":0.12,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.49","Installed Capacity (MW)":"36","Financiers":"Local BOT","GIS Rainfall\n":"1408","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":17.6,"District":"Tachileik","Mean annual inflow (MAF) into reservoir (m3/s)\n":46.1,"Developers":"MAM","Sub-Basin (GIS Maps)\n":"Nam Lin","Status (labelled by IFC)":"LocMoU","State/Region":"Shan","Basin":"Mekong","Annual Runoff into Reservoir (hm3)":1454,"Catchment Area (km2)\n":"2614","Sub-Basin (HP Chapter)\n":"Nam Lin","Mean annual energy (GW)\n":"36","Total storage (FSL) (mil. m3)":"14","Notes":null,"River":"Nam Lin","Function":"HP","Country":"Myanmar","Location_L":100.24103,"Location_1":20.742516,"Status":"Proposed","Project Name":"Nam Lin","COD Year":"2021","Project ID":"DAM0049","the_geom":"0101000020E610000016DF50F86C0F5940B9C1508715BE3440"},{"_id":49,"Catchment  Annual Rainfall (mm)":"1418.000000","Total Powerplant Design Discharge (m3/s)\n":"59","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":10.3,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"805","Powerhouse Type":"At dam toe","Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"100","Total Length of Reservoir (km)\n":1.3,"Reservoir Live Storage (hm3)\n":"31","Reservoir Dead Storage (hm3)\n":"21","Reservoir Retention Period (days)\n":"11","Run-of-River or Storage":"S","Township":"Muse","Myanmar Selfuse (MW)\n":"20","% use MYA":1,"Export (MW)":"0","Height (m)":"54","Qmin/ MAF":0.18,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.48","Installed Capacity (MW)":"20","Financiers":"Local BOT","GIS Rainfall\n":"1533","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":31.8,"District":"Muse","Mean annual inflow (MAF) into reservoir (m3/s)\n":32.6,"Developers":"Great Hor Kham","Sub-Basin (GIS Maps)\n":"Shweli","Status (labelled by IFC)":"Covenant","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":1028,"Catchment Area (km2)\n":"1025","Sub-Basin (HP Chapter)\n":"Shweli","Mean annual energy (GW)\n":"20","Total storage (FSL) (mil. m3)":"52","Notes":null,"River":"Nam Paw Creek","Function":"HP","Country":"Myanmar","Location_L":97.911,"Location_1":23.944342,"Status":"Proposed","Project Name":"Nam Paw","COD Year":"2019","Project ID":"DAM0050","the_geom":"0101000020E6100000E46723D74D7A58409E45EF54C0F13740"},{"_id":50,"Catchment  Annual Rainfall (mm)":"1100.000000","Total Powerplant Design Discharge (m3/s)\n":"65","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":4.6,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"570","Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"600","Total Length of Reservoir (km)\n":0.2,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":"150","% use MYA":1,"Export (MW)":"0","Height (m)":"10","Qmin/ MAF":0.21,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":17.8,"Plant Factor":"0.6","Installed Capacity (MW)":"150","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1446","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":19.8,"District":"Hpi Hseng","Mean annual inflow (MAF) into reservoir (m3/s)\n":66.4,"Developers":"TEI/HCTC","Sub-Basin (GIS Maps)\n":"Nam Pawn","Status (labelled by IFC)":"MOU","State/Region":"Shan","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":2094,"Catchment Area (km2)\n":"3352","Sub-Basin (HP Chapter)\n":"Nam Pawn","Mean annual energy (GW)\n":"150","Total storage (FSL) (mil. m3)":"7","Notes":null,"River":"Nam Pawn","Function":"HP","Country":"SIN/MYA","Location_L":97.43737,"Location_1":20.06212,"Status":"Proposed","Project Name":"Nam Pawn (upper)","COD Year":"2020","Project ID":"DAM0051","the_geom":"0101000020E610000049145AD6FD5B584013656F29E70F3440"},{"_id":51,"Catchment  Annual Rainfall (mm)":"2500.000000","Total Powerplant Design Discharge (m3/s)\n":"113","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":19.3,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"316","Powerhouse Type":"Above ground","Dam Type":"CG","Reservoir Area (km2)\n":2.2,"Estimated No. Construction Workers (planned projects)\n":"600","Total Length of Reservoir (km)\n":0.6,"Reservoir Live Storage (hm3)\n":"0","Reservoir Dead Storage (hm3)\n":"14","Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"RoR","Township":"Waingmaw","Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":"56","Qmin/ MAF":0.07,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":6,"Plant Factor":"0.54","Installed Capacity (MW)":"141","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1910","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":70.8,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":79.4,"Developers":"China Guodian/Tun Thwin Mining)","Sub-Basin (GIS Maps)\n":"Namtabak","Status (labelled by IFC)":"MOA","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":2504,"Catchment Area (km2)\n":"1121","Sub-Basin (HP Chapter)\n":"Namtabak","Mean annual energy (GW)\n":"141","Total storage (FSL) (mil. m3)":"15","Notes":null,"River":"Namtamhpak","Function":"HP","Country":"PRC/MYA","Location_L":97.713905,"Location_1":25.090721,"Status":"Proposed","Project Name":"Nam Tabak I","COD Year":"2027","Project ID":"DAM0156","the_geom":"0101000020E6100000C39ACAA2B06D58401807978E39173940"},{"_id":52,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"113","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":4.1,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"492","Powerhouse Type":null,"Dam Type":"CG","Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"400","Total Length of Reservoir (km)\n":4,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":null,"Township":"Hsipaw","Myanmar Selfuse (MW)\n":"100","% use MYA":1,"Export (MW)":"0","Height (m)":"114","Qmin/ MAF":0.21,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":"0.72","Installed Capacity (MW)":"100","Financiers":"Local BOT","GIS Rainfall\n":"1628","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":19,"District":"Kyaukme","Mean annual inflow (MAF) into reservoir (m3/s)\n":129.6,"Developers":"NCEH","Sub-Basin (GIS Maps)\n":"Upper Myitnge","Status (labelled by IFC)":"LocMoU","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":4087,"Catchment Area (km2)\n":"6832","Sub-Basin (HP Chapter)\n":"Myitnge","Mean annual energy (GW)\n":"100","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Myitnge Upper","Function":"HP","Country":"Myanmar","Location_L":97.31937,"Location_1":22.720943,"Status":"Proposed","Project Name":"Nam Tu","COD Year":"2021","Project ID":"DAM0053","the_geom":"0101000020E61000002C9FE57970545840B6476FB88FB83640"},{"_id":53,"Catchment  Annual Rainfall (mm)":"1650.000000","Total Powerplant Design Discharge (m3/s)\n":"46","Transmission Line Length (km)\n":"0","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":14.3,"Transmission Line Connected to S/S\n":"Upper Paunglaung","Full Supply Level (FSL) (m)\n":"295","Powerhouse Type":"Above ground","Dam Type":null,"Reservoir Area (km2)\n":0.3,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":3,"Reservoir Live Storage (hm3)\n":"4","Reservoir Dead Storage (hm3)\n":"5","Reservoir Retention Period (days)\n":"2","Run-of-River or Storage":"RoR","Township":"Pyinmana","Myanmar Selfuse (MW)\n":"40","% use MYA":1,"Export (MW)":"0","Height (m)":"72","Qmin/ MAF":0.17,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":5.2,"Plant Factor":"0.43","Installed Capacity (MW)":"40","Financiers":"Sole Investment","GIS Rainfall\n":"1269","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":22.3,"District":"Det Khi Na","Mean annual inflow (MAF) into reservoir (m3/s)\n":18.3,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Paung Laung","Status (labelled by IFC)":"Built","State/Region":"Naypyitaw","Basin":"Sittaung","Annual Runoff into Reservoir (hm3)":577,"Catchment Area (km2)\n":"821","Sub-Basin (HP Chapter)\n":"Paung Laung","Mean annual energy (GW)\n":"40","Total storage (FSL) (mil. m3)":"9","Notes":null,"River":"Sin The Chaung","Function":"HP","Country":"Myanmar","Location_L":96.450485,"Location_1":19.7412,"Status":"Complete","Project Name":"Nancho","COD Year":"2013","Project ID":"DAM0054","the_geom":"0101000020E6100000DB19A6B6D41C584092CB7F48BFBD3340"},{"_id":54,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"445","Powerhouse Type":null,"Dam Type":"RCC Gravity Dam","Reservoir Area (km2)\n":23.8,"Estimated No. Construction Workers (planned projects)\n":"4600","Total Length of Reservoir (km)\n":110,"Reservoir Live Storage (hm3)\n":"277","Reservoir Dead Storage (hm3)\n":"580","Reservoir Retention Period (days)\n":"1","Run-of-River or Storage":"RoR","Township":"Tangyan","Myanmar Selfuse (MW)\n":"600","% use MYA":0.5,"Export (MW)":"600","Height (m)":"90","Qmin/ MAF":0.27,"Crest Length (m)":"265.000000","Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.59","Installed Capacity (MW)":"1200","Financiers":"Foreign JV/BOT","GIS Rainfall\n":null,"Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":15.9,"District":"Lashio","Mean annual inflow (MAF) into reservoir (m3/s)\n":2250,"Developers":"HydroChina/IGOEC","Sub-Basin (GIS Maps)\n":"Upper Thanlwin","Status (labelled by IFC)":"MOA","State/Region":"Shan","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":70956,"Catchment Area (km2)\n":"141127","Sub-Basin (HP Chapter)\n":"Thanlwin Mainstem","Mean annual energy (GW)\n":"1200","Total storage (FSL) (mil. m3)":"857","Notes":"Location: http://www.burmariversnetwork.org/index.php?option=com_content&view=article&id=981&Itemid=392","River":"Thanlwin Mainstem","Function":"HP","Country":"PRC/MYA","Location_L":98.49915,"Location_1":22.987465,"Status":"Proposed","Project Name":"Naopha","COD Year":"2026","Project ID":"DAM0055","the_geom":"0101000020E610000001310917F29F584033FAD170CAFC3640"},{"_id":55,"Catchment  Annual Rainfall (mm)":"1650.000000","Total Powerplant Design Discharge (m3/s)\n":"310","Transmission Line Length (km)\n":"13","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":17.4,"Transmission Line Connected to S/S\n":"Pyinmana","Full Supply Level (FSL) (m)\n":"225","Powerhouse Type":null,"Dam Type":"RCC","Reservoir Area (km2)\n":17,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":16,"Reservoir Live Storage (hm3)\n":"350","Reservoir Dead Storage (hm3)\n":"340","Reservoir Retention Period (days)\n":"32","Run-of-River or Storage":"S","Township":"Pyinmana","Myanmar Selfuse (MW)\n":"280","% use MYA":1,"Export (MW)":"0","Height (m)":"131","Qmin/ MAF":0.14,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.37","Installed Capacity (MW)":"280","Financiers":"Sole Investment","GIS Rainfall\n":"1269","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":29.2,"District":"Det Khi Na","Mean annual inflow (MAF) into reservoir (m3/s)\n":128,"Developers":"MoEE/MOALI","Sub-Basin (GIS Maps)\n":"Paung Laung","Status (labelled by IFC)":"Built","State/Region":"Naypyitaw","Basin":"Sittaung","Annual Runoff into Reservoir (hm3)":4037,"Catchment Area (km2)\n":"4381","Sub-Basin (HP Chapter)\n":"Paung Laung","Mean annual energy (GW)\n":"280","Total storage (FSL) (mil. m3)":"690","Notes":null,"River":"Paung Laung Chaung","Function":"MP","Country":"Myanmar","Location_L":96.335,"Location_1":19.785,"Status":"Complete","Project Name":"Paung Laung (lower)","COD Year":"2005","Project ID":"DAM0056","the_geom":"0101000020E61000003D0AD7A370155840295C8FC2F5C83340"},{"_id":56,"Catchment  Annual Rainfall (mm)":"1800.000000","Total Powerplant Design Discharge (m3/s)\n":"100","Transmission Line Length (km)\n":"8","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":8.1,"Transmission Line Connected to S/S\n":"Bluchaung2-Shwemyo In/out","Full Supply Level (FSL) (m)\n":"284","Powerhouse Type":null,"Dam Type":"RCC","Reservoir Area (km2)\n":9.6,"Estimated No. Construction Workers (planned projects)\n":"400","Total Length of Reservoir (km)\n":10,"Reservoir Live Storage (hm3)\n":"214","Reservoir Dead Storage (hm3)\n":"215","Reservoir Retention Period (days)\n":"29","Run-of-River or Storage":"S","Township":"Pyinmana","Myanmar Selfuse (MW)\n":"100","% use MYA":1,"Export (MW)":"0","Height (m)":"110","Qmin/ MAF":0.15,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.39","Installed Capacity (MW)":"100","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1269","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":31.1,"District":"Nay Pyi Taw","Mean annual inflow (MAF) into reservoir (m3/s)\n":84.6,"Developers":"Energized Myanmar","Sub-Basin (GIS Maps)\n":"Paung Laung","Status (labelled by IFC)":"MOU","State/Region":"Mandalay","Basin":"Sittaung","Annual Runoff into Reservoir (hm3)":2668,"Catchment Area (km2)\n":"2722","Sub-Basin (HP Chapter)\n":"Paung Laung","Mean annual energy (GW)\n":"100","Total storage (FSL) (mil. m3)":"429","Notes":null,"River":"Paung Laung Chaung","Function":"HP","Country":"SIN","Location_L":96.508,"Location_1":19.86,"Status":"Proposed","Project Name":"Paung Laung (middle)","COD Year":"2021","Project ID":"DAM0057","the_geom":"0101000020E61000008D976E12832058405C8FC2F528DC3340"},{"_id":57,"Catchment  Annual Rainfall (mm)":"1710.000000","Total Powerplant Design Discharge (m3/s)\n":"200","Transmission Line Length (km)\n":"27","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":17.4,"Transmission Line Connected to S/S\n":"Nancho","Full Supply Level (FSL) (m)\n":"370","Powerhouse Type":"Above ground","Dam Type":"RCC","Reservoir Area (km2)\n":61,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":50,"Reservoir Live Storage (hm3)\n":"860","Reservoir Dead Storage (hm3)\n":"426","Reservoir Retention Period (days)\n":"121","Run-of-River or Storage":"S","Township":"Pyinmana","Myanmar Selfuse (MW)\n":"140","% use MYA":1,"Export (MW)":"0","Height (m)":"98","Qmin/ MAF":0.14,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.37","Installed Capacity (MW)":"140","Financiers":"Sole Investment","GIS Rainfall\n":"1269","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":32,"District":"Nay Pyi Taw","Mean annual inflow (MAF) into reservoir (m3/s)\n":82.4,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Paung Laung","Status (labelled by IFC)":"Built","State/Region":"Mandalay","Basin":"Sittaung","Annual Runoff into Reservoir (hm3)":2599,"Catchment Area (km2)\n":"2572","Sub-Basin (HP Chapter)\n":"Paung Laung","Mean annual energy (GW)\n":"140","Total storage (FSL) (mil. m3)":"1286","Notes":null,"River":"Paung Laung Chaung","Function":"HP","Country":"Myanmar","Location_L":96.598,"Location_1":19.756,"Status":"Complete","Project Name":"Paung Laung (upper)","COD Year":"2015","Project ID":"DAM0058","the_geom":"0101000020E610000083C0CAA145265840A8C64B3789C13340"},{"_id":58,"Catchment  Annual Rainfall (mm)":"1100.000000","Total Powerplant Design Discharge (m3/s)\n":"65","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":4.9,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"900","Powerhouse Type":"Underground","Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"400","Total Length of Reservoir (km)\n":1,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":"105","% use MYA":1,"Export (MW)":"0","Height (m)":"20","Qmin/ MAF":0.21,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":10.3,"Plant Factor":"0.61","Installed Capacity (MW)":"105","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1446","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":19.7,"District":"Hpi Hseng","Mean annual inflow (MAF) into reservoir (m3/s)\n":62,"Developers":"TEI/HCTC","Sub-Basin (GIS Maps)\n":"Nam Pawn","Status (labelled by IFC)":"MOU","State/Region":"Shan","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":1955,"Catchment Area (km2)\n":"3151","Sub-Basin (HP Chapter)\n":"Nam Pawn","Mean annual energy (GW)\n":"105","Total storage (FSL) (mil. m3)":"20","Notes":null,"River":"Nam Pawn","Function":"HP","Country":"SIN/MYA","Location_L":97.456154,"Location_1":20.209251,"Status":"Proposed","Project Name":"Hpak Nam","COD Year":"62","Project ID":"DAM0261","the_geom":"0101000020E610000052802898315D5840C1A7397991353440"},{"_id":59,"Catchment  Annual Rainfall (mm)":"1100.000000","Total Powerplant Design Discharge (m3/s)\n":"65","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":4.7,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"665","Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"200","Total Length of Reservoir (km)\n":1,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":"45","% use MYA":1,"Export (MW)":"0","Height (m)":"10","Qmin/ MAF":0.21,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":6,"Plant Factor":"0.67","Installed Capacity (MW)":"45","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1446","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":19.8,"District":"Hpi Hseng","Mean annual inflow (MAF) into reservoir (m3/s)\n":64.6,"Developers":"TEI/HCTC","Sub-Basin (GIS Maps)\n":"Nam Pawn","Status (labelled by IFC)":"MOU","State/Region":"Shan","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":2037,"Catchment Area (km2)\n":"3265","Sub-Basin (HP Chapter)\n":"Nam Pawn","Mean annual energy (GW)\n":"45","Total storage (FSL) (mil. m3)":"4","Notes":null,"River":"Nam Pawn","Function":"HP","Country":"SIN/MYA","Location_L":97.43497,"Location_1":20.118443,"Status":"Proposed","Project Name":"Hpi Hseng","COD Year":"2020","Project ID":"DAM0060","the_geom":"0101000020E61000006F2F698CD65B5840AC70CB47521E3440"},{"_id":60,"Catchment  Annual Rainfall (mm)":"2540.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"8","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Taungoo-Tharyargone In/out","Full Supply Level (FSL) (m)\n":"162","Powerhouse Type":"Above ground","Dam Type":"Rockfill","Reservoir Area (km2)\n":24,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":27,"Reservoir Live Storage (hm3)\n":"727","Reservoir Dead Storage (hm3)\n":"52","Reservoir Retention Period (days)\n":"233","Run-of-River or Storage":"S","Township":"Phyu","Myanmar Selfuse (MW)\n":"40","% use MYA":1,"Export (MW)":"0","Height (m)":"75","Qmin/ MAF":0.1,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.34","Installed Capacity (MW)":"40","Financiers":"Sole Investment","GIS Rainfall\n":"2081","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":33.1,"District":"Taungoo","Mean annual inflow (MAF) into reservoir (m3/s)\n":36.2,"Developers":"MoEE/MOALI","Sub-Basin (GIS Maps)\n":"Other Sittaung","Status (labelled by IFC)":"Built","State/Region":"Bago","Basin":"Sittaung","Annual Runoff into Reservoir (hm3)":1142,"Catchment Area (km2)\n":"1093","Sub-Basin (HP Chapter)\n":"Other Sittaung","Mean annual energy (GW)\n":"40","Total storage (FSL) (mil. m3)":"780","Notes":null,"River":"Pyu Chaung","Function":"MP","Country":"Myanmar","Location_L":96.35103,"Location_1":18.506214,"Status":"Complete","Project Name":"Phyu Chaung","COD Year":"2015","Project ID":"DAM0061","the_geom":"0101000020E6100000BDFE243E7716584000C79E3D97813240"},{"_id":61,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"1082","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":16.1,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"1010","Powerhouse Type":"Ground","Dam Type":"CFRD","Reservoir Area (km2)\n":9.2,"Estimated No. Construction Workers (planned projects)\n":"4600","Total Length of Reservoir (km)\n":56,"Reservoir Live Storage (hm3)\n":"578","Reservoir Dead Storage (hm3)\n":"605","Reservoir Retention Period (days)\n":"6","Run-of-River or Storage":"S","Township":"Khawbude","Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":"159","Qmin/ MAF":0.1,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.7","Installed Capacity (MW)":"1200","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1540","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":96.2,"District":"Puta-O","Mean annual inflow (MAF) into reservoir (m3/s)\n":1070,"Developers":"CPI","Sub-Basin (GIS Maps)\n":"Nmae Hka","Status (labelled by IFC)":"MOA","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":33744,"Catchment Area (km2)\n":"11123","Sub-Basin (HP Chapter)\n":"Ayeyarwady Headwaters","Mean annual energy (GW)\n":"1200","Total storage (FSL) (mil. m3)":"1183","Notes":null,"River":"N'Mai  Hka","Function":"HP","Country":"PRC","Location_L":98.090195,"Location_1":27.525942,"Status":"Proposed","Project Name":"Renan","COD Year":"2030","Project ID":"DAM0062","the_geom":"0101000020E61000001897AAB4C585584023A0C211A4863B40"},{"_id":62,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"212","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Kyaukpahto","Full Supply Level (FSL) (m)\n":"129","Powerhouse Type":"Above ground","Dam Type":"Rockfill","Reservoir Area (km2)\n":40.5,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":16.1,"Reservoir Live Storage (hm3)\n":"344","Reservoir Dead Storage (hm3)\n":"104","Reservoir Retention Period (days)\n":"30","Run-of-River or Storage":"S","Township":"Mandalay","Myanmar Selfuse (MW)\n":"25","% use MYA":1,"Export (MW)":"0","Height (m)":"41","Qmin/ MAF":0.15,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.61","Installed Capacity (MW)":"25","Financiers":"Sole Investment","GIS Rainfall\n":"1802","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":38.4,"District":"Pyinoolwin","Mean annual inflow (MAF) into reservoir (m3/s)\n":131.6,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Ma Gyi Chaung","Status (labelled by IFC)":"Built","State/Region":"Mandalay","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":4150,"Catchment Area (km2)\n":"3424","Sub-Basin (HP Chapter)\n":"Ma Gyi Chaung","Mean annual energy (GW)\n":"25","Total storage (FSL) (mil. m3)":"448","Notes":null,"River":"Ma Gyi Chaung","Function":"MP","Country":"Myanmar","Location_L":96.326935,"Location_1":22.348646,"Status":"Complete","Project Name":"Sedawgyi","COD Year":"1989","Project ID":"DAM0184","the_geom":"0101000020E61000008DB62A89EC14584097E13FDD40593640"},{"_id":63,"Catchment  Annual Rainfall (mm)":"889.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"0","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Kyaukpahto/Aungpinle","Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":24,"Estimated No. Construction Workers (planned projects)\n":"300","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":"481","Reservoir Dead Storage (hm3)\n":"112","Reservoir Retention Period (days)\n":"55","Run-of-River or Storage":"S","Township":"Mandalay","Myanmar Selfuse (MW)\n":"64","% use MYA":1,"Export (MW)":"0","Height (m)":"73","Qmin/ MAF":0.16,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"-","Installed Capacity (MW)":"64","Financiers":"Sole Investment","GIS Rainfall\n":"1802","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":38.3,"District":"Kyaukme","Mean annual inflow (MAF) into reservoir (m3/s)\n":101,"Developers":"MOALI","Sub-Basin (GIS Maps)\n":"Ma Gyi Chaung","Status (labelled by IFC)":"GOM Plan","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":3185,"Catchment Area (km2)\n":"2640","Sub-Basin (HP Chapter)\n":"Ma Gyi Chaung","Mean annual energy (GW)\n":"64","Total storage (FSL) (mil. m3)":"593","Notes":null,"River":"Ma Gyi Chaung","Function":"MP","Country":"Myanmar","Location_L":96.20626,"Location_1":22.74764,"Status":"Proposed","Project Name":"Sedawgyi (upper)","COD Year":null,"Project ID":"DAM0064","the_geom":"0101000020E6100000459E245D330D5840732EC55565BF3640"},{"_id":64,"Catchment  Annual Rainfall (mm)":"3700.000000","Total Powerplant Design Discharge (m3/s)\n":"207","Transmission Line Length (km)\n":"41","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":51.9,"Transmission Line Connected to S/S\n":"Tharyargone","Full Supply Level (FSL) (m)\n":"84","Powerhouse Type":"Above ground","Dam Type":"Rockfill","Reservoir Area (km2)\n":58.4,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":35,"Reservoir Live Storage (hm3)\n":"1450","Reservoir Dead Storage (hm3)\n":"630","Reservoir Retention Period (days)\n":"427","Run-of-River or Storage":"S","Township":"Shwegyin","Myanmar Selfuse (MW)\n":"75","% use MYA":1,"Export (MW)":"0","Height (m)":"57","Qmin/ MAF":0.1,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.4","Installed Capacity (MW)":"75","Financiers":"Sole Investment","GIS Rainfall\n":"2081","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":44.8,"District":"Bago","Mean annual inflow (MAF) into reservoir (m3/s)\n":39.3,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Other Sittaung","Status (labelled by IFC)":"Built","State/Region":"Bago","Basin":"Sittaung","Annual Runoff into Reservoir (hm3)":1239,"Catchment Area (km2)\n":"878","Sub-Basin (HP Chapter)\n":"Other Sittaung","Mean annual energy (GW)\n":"75","Total storage (FSL) (mil. m3)":"2080","Notes":null,"River":"Shwegyin River","Function":"HP","Country":"Myanmar","Location_L":96.935,"Location_1":17.970226,"Status":"Complete","Project Name":"Shwegyin","COD Year":"2011","Project ID":"DAM0065","the_geom":"0101000020E61000008C2E6F0ED73B58403AB2F2CB60F83140"},{"_id":65,"Catchment  Annual Rainfall (mm)":"1418.000000","Total Powerplant Design Discharge (m3/s)\n":"230","Transmission Line Length (km)\n":"96","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":2,"Transmission Line Connected to S/S\n":"Mansan","Full Supply Level (FSL) (m)\n":"745","Powerhouse Type":"Above ground","Dam Type":"CG","Reservoir Area (km2)\n":1.1,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":10.5,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":"Manthet Village","Myanmar Selfuse (MW)\n":"400","% use MYA":0.67,"Export (MW)":"200","Height (m)":"47","Qmin/ MAF":0.29,"Crest Length (m)":"177.000000","Distance along river between dam and powerhouse (km)\n":9.5,"Plant Factor":"0.77","Installed Capacity (MW)":"600","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1533","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":31.8,"District":"Muse","Mean annual inflow (MAF) into reservoir (m3/s)\n":400,"Developers":"YUPD","Sub-Basin (GIS Maps)\n":"Shweli","Status (labelled by IFC)":"Built","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":12614,"Catchment Area (km2)\n":"12597","Sub-Basin (HP Chapter)\n":"Shweli","Mean annual energy (GW)\n":"600","Total storage (FSL) (mil. m3)":"24.11","Notes":"Google Earth visible.","River":"Shweli","Function":"HP","Country":"PRC","Location_L":97.506,"Location_1":23.698,"Status":"Complete","Project Name":"Shweli 1","COD Year":"2009","Project ID":"DAM0066","the_geom":"0101000020E6100000AAF1D24D62605840A69BC420B0B23740"},{"_id":66,"Catchment  Annual Rainfall (mm)":"1418.000000","Total Powerplant Design Discharge (m3/s)\n":"526","Transmission Line Length (km)\n":"70","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":5.2,"Transmission Line Connected to S/S\n":"Shweli3","Full Supply Level (FSL) (m)\n":"395","Powerhouse Type":"Bankside","Dam Type":"CFRD","Reservoir Area (km2)\n":27.9,"Estimated No. Construction Workers (planned projects)\n":"2100","Total Length of Reservoir (km)\n":20,"Reservoir Live Storage (hm3)\n":"42","Reservoir Dead Storage (hm3)\n":"30","Reservoir Retention Period (days)\n":"1","Run-of-River or Storage":"RoR","Township":"Namkham","Myanmar Selfuse (MW)\n":"260","% use MYA":0.5,"Export (MW)":"260","Height (m)":"92","Qmin/ MAF":0.25,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.62","Installed Capacity (MW)":"520","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1533","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":30.5,"District":"Muse","Mean annual inflow (MAF) into reservoir (m3/s)\n":405.2,"Developers":"HIE/AWC","Sub-Basin (GIS Maps)\n":"Shweli","Status (labelled by IFC)":"MOA","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":12778,"Catchment Area (km2)\n":"13265","Sub-Basin (HP Chapter)\n":"Shweli","Mean annual energy (GW)\n":"520","Total storage (FSL) (mil. m3)":"72","Notes":null,"River":"Shweli","Function":"HP","Country":"PRC/MYA","Location_L":97.31235,"Location_1":23.6531,"Status":"Proposed","Project Name":"Shweli 2","COD Year":"2021","Project ID":"DAM0067","the_geom":"0101000020E6100000F5B9DA8AFD5358408104C58F31A73740"},{"_id":67,"Catchment  Annual Rainfall (mm)":"1418.000000","Total Powerplant Design Discharge (m3/s)\n":"1200","Transmission Line Length (km)\n":"420","Transmission Line Voltage level (kV)\n":"500","Turbine Discharge/ Min Flow\n":10.5,"Transmission Line Connected to S/S\n":"Meikhtila","Full Supply Level (FSL) (m)\n":"235","Powerhouse Type":"Above ground","Dam Type":"RCC","Reservoir Area (km2)\n":118,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":65,"Reservoir Live Storage (hm3)\n":"3610","Reservoir Dead Storage (hm3)\n":"1854","Reservoir Retention Period (days)\n":"92","Run-of-River or Storage":"S","Township":"Namkham","Myanmar Selfuse (MW)\n":"1050","% use MYA":1,"Export (MW)":"0","Height (m)":"122","Qmin/ MAF":0.25,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.37","Installed Capacity (MW)":"1050","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1533","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":30.5,"District":"Kyaukme","Mean annual inflow (MAF) into reservoir (m3/s)\n":452,"Developers":"EDF SA","Sub-Basin (GIS Maps)\n":"Shweli","Status (labelled by IFC)":"Construction","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":14254,"Catchment Area (km2)\n":"14810","Sub-Basin (HP Chapter)\n":"Shweli","Mean annual energy (GW)\n":"1050","Total storage (FSL) (mil. m3)":"5464","Notes":null,"River":"Shweli","Function":"HP","Country":"France","Location_L":96.769,"Location_1":23.315,"Status":"UC","Project Name":"Shweli 3","COD Year":"2020","Project ID":"DAM0068","the_geom":"0101000020E6100000F0A7C64B37315840713D0AD7A3503740"},{"_id":68,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":40.9,"Estimated No. Construction Workers (planned projects)\n":"1000","Total Length of Reservoir (km)\n":72,"Reservoir Live Storage (hm3)\n":"714","Reservoir Dead Storage (hm3)\n":"624","Reservoir Retention Period (days)\n":"46","Run-of-River or Storage":"S","Township":"Moemeik","Myanmar Selfuse (MW)\n":"120","% use MYA":0.5,"Export (MW)":"120","Height (m)":"-","Qmin/ MAF":0.2,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":"-","Installed Capacity (MW)":"240","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1381","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":24.3,"District":"Monghpyak","Mean annual inflow (MAF) into reservoir (m3/s)\n":178,"Developers":"YNIC","Sub-Basin (GIS Maps)\n":"Nam Lwe","Status (labelled by IFC)":"MOU","State/Region":"Shan","Basin":"Mekong","Annual Runoff into Reservoir (hm3)":5613,"Catchment Area (km2)\n":"7315","Sub-Basin (HP Chapter)\n":"Nam Lwe","Mean annual energy (GW)\n":"240","Total storage (FSL) (mil. m3)":"1338","Notes":null,"River":"Nam Lwe","Function":"HP","Country":"PRC","Location_L":100.176056,"Location_1":21.359543,"Status":"Proposed","Project Name":"Suo Lwe","COD Year":"2025","Project ID":"DAM0069","the_geom":"0101000020E61000001E15FF77440B5940778192020B5C3540"},{"_id":69,"Catchment  Annual Rainfall (mm)":"2930.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"32","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Dawei","Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":585,"Estimated No. Construction Workers (planned projects)\n":"2400","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":"8615","Reservoir Dead Storage (hm3)\n":"18471","Reservoir Retention Period (days)\n":"212","Run-of-River or Storage":"S","Township":"Tanintharyi","Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":"-","Qmin/ MAF":0.12,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.66","Installed Capacity (MW)":"600","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"2123","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":47.6,"District":"Tenasserim","Mean annual inflow (MAF) into reservoir (m3/s)\n":470,"Developers":"Italian-Thai","Sub-Basin (GIS Maps)\n":"Tanintharyi","Status (labelled by IFC)":"Suspended","State/Region":"Tanintharyi","Basin":"Tanintharyi","Annual Runoff into Reservoir (hm3)":14822,"Catchment Area (km2)\n":"9870","Sub-Basin (HP Chapter)\n":"Tanintharyi","Mean annual energy (GW)\n":"600","Total storage (FSL) (mil. m3)":"27086","Notes":null,"River":"Taninthayi","Function":"HP","Country":"Thailand","Location_L":98.94,"Location_1":12.777,"Status":"Proposed","Project Name":"Taninthayi","COD Year":null,"Project ID":"DAM0070","the_geom":"0101000020E61000005C8FC2F528BC5840E7FBA9F1D28D2940"},{"_id":70,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"200","Transmission Line Length (km)\n":"9","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":0,"Transmission Line Connected to S/S\n":"Oakshitpin-Toungup In/out","Full Supply Level (FSL) (m)\n":"81","Powerhouse Type":"Semi-Underground","Dam Type":"Zone type/Rockfill","Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":32,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":"-","Township":"Thandwe","Myanmar Selfuse (MW)\n":"111","% use MYA":1,"Export (MW)":"0","Height (m)":"91","Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.4","Installed Capacity (MW)":"111","Financiers":"Sole Investment","GIS Rainfall\n":"2545","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":null,"District":"Thandwe","Mean annual inflow (MAF) into reservoir (m3/s)\n":null,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Thahtay","Status (labelled by IFC)":"Construction","State/Region":"Rakhine","Basin":"Rakhine","Annual Runoff into Reservoir (hm3)":0,"Catchment Area (km2)\n":"1293","Sub-Basin (HP Chapter)\n":"Thahtay","Mean annual energy (GW)\n":"111","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Thahtay","Function":"HP","Country":"Myanmar","Location_L":94.381,"Location_1":18.64,"Status":"UC","Project Name":"Thahtay","COD Year":"2020","Project ID":"DAM0071","the_geom":"0101000020E6100000AAF1D24D62985740A4703D0AD7A33240"},{"_id":71,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"53","Transmission Line Voltage level (kV)\n":"132","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Ngapyadaing","Full Supply Level (FSL) (m)\n":"159","Powerhouse Type":"Above ground","Dam Type":"Earth","Reservoir Area (km2)\n":397.1,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":42.8,"Reservoir Live Storage (hm3)\n":"3072","Reservoir Dead Storage (hm3)\n":"481","Reservoir Retention Period (days)\n":"170","Run-of-River or Storage":"S","Township":"Kyun Hla","Myanmar Selfuse (MW)\n":"30","% use MYA":1,"Export (MW)":"0","Height (m)":"33","Qmin/ MAF":0.09,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.45","Installed Capacity (MW)":"30","Financiers":"Sole Investment","GIS Rainfall\n":"1260","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":22.4,"District":"Shwebo","Mean annual inflow (MAF) into reservoir (m3/s)\n":209,"Developers":"MoEE/MOALI","Sub-Basin (GIS Maps)\n":"Mu","Status (labelled by IFC)":"Built","State/Region":"Sagaing","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":6591,"Catchment Area (km2)\n":"9338","Sub-Basin (HP Chapter)\n":"Mu","Mean annual energy (GW)\n":"30","Total storage (FSL) (mil. m3)":"3552","Notes":null,"River":"Mu River","Function":"MP","Country":"Myanmar","Location_L":95.35833,"Location_1":23.305918,"Status":"Complete","Project Name":"Thapanzeik","COD Year":"2002","Project ID":"DAM0205","the_geom":"0101000020E61000003ECBF3E0EED65740FA415DA4504E3740"},{"_id":72,"Catchment  Annual Rainfall (mm)":"2692.000000","Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"23","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Taungoo","Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":"Earth","Reservoir Area (km2)\n":13.8,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":22,"Reservoir Live Storage (hm3)\n":"148","Reservoir Dead Storage (hm3)\n":"296","Reservoir Retention Period (days)\n":"34","Run-of-River or Storage":"S","Township":"Tangoo","Myanmar Selfuse (MW)\n":"120","% use MYA":1,"Export (MW)":"0","Height (m)":"94","Qmin/ MAF":0.11,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.57","Installed Capacity (MW)":"120","Financiers":"Local BOT","GIS Rainfall\n":"2081","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":23.2,"District":"Hpa-An","Mean annual inflow (MAF) into reservoir (m3/s)\n":50.5,"Developers":"Gold Energy","Sub-Basin (GIS Maps)\n":"Other Sittaung","Status (labelled by IFC)":"Built","State/Region":"Kayin","Basin":"Sittaung","Annual Runoff into Reservoir (hm3)":1593,"Catchment Area (km2)\n":"2175","Sub-Basin (HP Chapter)\n":"Other Sittaung","Mean annual energy (GW)\n":"120","Total storage (FSL) (mil. m3)":"444","Notes":null,"River":"Thauk Ye Khat","Function":"HP","Country":"Myanmar","Location_L":96.6199,"Location_1":18.914103,"Status":"Complete","Project Name":"Thauk Ye Khat 2","COD Year":"2014","Project ID":"DAM0073","the_geom":"0101000020E6100000EFE3688EAC2758404C35B39602EA3240"},{"_id":73,"Catchment  Annual Rainfall (mm)":"3268.000000","Total Powerplant Design Discharge (m3/s)\n":"146","Transmission Line Length (km)\n":"130","Transmission Line Voltage level (kV)\n":"500","Turbine Discharge/ Min Flow\n":3.3,"Transmission Line Connected to S/S\n":"Winemaw","Full Supply Level (FSL) (m)\n":"1075","Powerhouse Type":"Bankside","Dam Type":"CG","Reservoir Area (km2)\n":8.8,"Estimated No. Construction Workers (planned projects)\n":"1400","Total Length of Reservoir (km)\n":4,"Reservoir Live Storage (hm3)\n":"4","Reservoir Dead Storage (hm3)\n":"2","Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"RoR","Township":"Myitkyina","Myanmar Selfuse (MW)\n":"170","% use MYA":0.5,"Export (MW)":"170","Height (m)":"63","Qmin/ MAF":0.32,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":13,"Plant Factor":"0.57","Installed Capacity (MW)":"340","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1540","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":77.5,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":135.1,"Developers":"YEIG/IGOEC","Sub-Basin (GIS Maps)\n":"Naw Chang  Hka","Status (labelled by IFC)":"JVA","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":4262,"Catchment Area (km2)\n":"1743","Sub-Basin (HP Chapter)\n":"Ayeyarwady Headwaters","Mean annual energy (GW)\n":"340","Total storage (FSL) (mil. m3)":"5","Notes":null,"River":"Naw Chang  Hka","Function":"HP","Country":"PRC/MYA","Location_L":98.36025,"Location_1":25.963646,"Status":"Proposed","Project Name":"Tongxinqiao","COD Year":"2026","Project ID":"DAM0212","the_geom":"0101000020E6100000AB5AD2510E975840D5EB1681B1F63940"},{"_id":74,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"1718","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":8.4,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"525","Powerhouse Type":null,"Dam Type":"CFRD","Reservoir Area (km2)\n":6.3,"Estimated No. Construction Workers (planned projects)\n":"6500","Total Length of Reservoir (km)\n":29,"Reservoir Live Storage (hm3)\n":"150","Reservoir Dead Storage (hm3)\n":"455","Reservoir Retention Period (days)\n":"1","Run-of-River or Storage":"RoR","Township":"Myitkyina","Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":"165","Qmin/ MAF":0.11,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.85","Installed Capacity (MW)":"1800","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1540","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":104.8,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":1910,"Developers":"CPI","Sub-Basin (GIS Maps)\n":"Nmae Hka","Status (labelled by IFC)":"MOA","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":60234,"Catchment Area (km2)\n":"18225","Sub-Basin (HP Chapter)\n":"Ayeyarwady Headwaters","Mean annual energy (GW)\n":"1800","Total storage (FSL) (mil. m3)":"605","Notes":null,"River":"N'Mai  Hka","Function":"HP","Country":"PRC","Location_L":98.29251,"Location_1":26.403585,"Status":"Proposed","Project Name":"Wutsok","COD Year":"2030","Project ID":"DAM0075","the_geom":"0101000020E610000019AE0E80B8925840FA27B85851673A40"},{"_id":75,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"27","Transmission Line Voltage level (kV)\n":"33","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Tharyargone","Full Supply Level (FSL) (m)\n":"103","Powerhouse Type":null,"Dam Type":"Earth","Reservoir Area (km2)\n":76.7,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":36,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":"149","Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"RoR","Township":"Kyauktaga","Myanmar Selfuse (MW)\n":"25","% use MYA":1,"Export (MW)":"0","Height (m)":"77","Qmin/ MAF":0.07,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.56","Installed Capacity (MW)":"25","Financiers":"Sole Investment","GIS Rainfall\n":"2081","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":49.3,"District":"Bago","Mean annual inflow (MAF) into reservoir (m3/s)\n":39.1,"Developers":"MoEE/MOALI","Sub-Basin (GIS Maps)\n":"Other Sittaung","Status (labelled by IFC)":"Built","State/Region":"Bago","Basin":"Sittaung","Annual Runoff into Reservoir (hm3)":1233,"Catchment Area (km2)\n":"793","Sub-Basin (HP Chapter)\n":"Other Sittaung","Mean annual energy (GW)\n":"25","Total storage (FSL) (mil. m3)":"149","Notes":null,"River":"Ye Nwe Chaung","Function":"MP","Country":"Myanmar","Location_L":96.44615,"Location_1":18.08521,"Status":"Complete","Project Name":"Yenwe","COD Year":"2007","Project ID":"DAM0076","the_geom":"0101000020E6100000E1421EC18D1C58406C425A63D0153240"},{"_id":76,"Catchment  Annual Rainfall (mm)":"838.000000","Total Powerplant Design Discharge (m3/s)\n":"840","Transmission Line Length (km)\n":"0","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":5.3,"Transmission Line Connected to S/S\n":"Belin, Meiktila","Full Supply Level (FSL) (m)\n":"185","Powerhouse Type":"Above ground","Dam Type":"RCC","Reservoir Area (km2)\n":59,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":75,"Reservoir Live Storage (hm3)\n":"1630","Reservoir Dead Storage (hm3)\n":"1000","Reservoir Retention Period (days)\n":"39","Run-of-River or Storage":"S","Township":"Kyaukse","Myanmar Selfuse (MW)\n":"790","% use MYA":1,"Export (MW)":"0","Height (m)":"132","Qmin/ MAF":0.33,"Crest Length (m)":"690.000000","Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.51","Installed Capacity (MW)":"790","Financiers":"Sole Investment","GIS Rainfall\n":"1600","Max reservoir area (FSL) (km2)\n":59.57,"Unit Flow (l/s/km2)\n":17.1,"District":"Pyinoolwin","Mean annual inflow (MAF) into reservoir (m3/s)\n":483,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Lower Myitnge","Status (labelled by IFC)":"Built","State/Region":"Mandalay","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":15232,"Catchment Area (km2)\n":"28206","Sub-Basin (HP Chapter)\n":"Myitnge","Mean annual energy (GW)\n":"790","Total storage (FSL) (mil. m3)":"2630","Notes":"Google Earth visible.","River":"Lower Myitnge","Function":"HP","Country":"Myanmar","Location_L":96.474075,"Location_1":21.675196,"Status":"Complete","Project Name":"Yeywa","COD Year":"2010","Project ID":"DAM0077","the_geom":"0101000020E61000004AB20E47571E5840D86322A5D9AC3540"},{"_id":77,"Catchment  Annual Rainfall (mm)":"1300.000000","Total Powerplant Design Discharge (m3/s)\n":"592","Transmission Line Length (km)\n":"0","Transmission Line Voltage level (kV)\n":"TBD","Turbine Discharge/ Min Flow\n":4.5,"Transmission Line Connected to S/S\n":"500kV Meilhtila S/S","Full Supply Level (FSL) (m)\n":"320","Powerhouse Type":"Underground","Dam Type":"RCC/Arch dam","Reservoir Area (km2)\n":11,"Estimated No. Construction Workers (planned projects)\n":"2800","Total Length of Reservoir (km)\n":70,"Reservoir Live Storage (hm3)\n":"196","Reservoir Dead Storage (hm3)\n":"258","Reservoir Retention Period (days)\n":"6","Run-of-River or Storage":"S","Township":"Nawng Khio","Myanmar Selfuse (MW)\n":"700","% use MYA":1,"Export (MW)":"0","Height (m)":"160","Qmin/ MAF":0.32,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.53","Installed Capacity (MW)":"700","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1608","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":16.2,"District":"Kyaukme","Mean annual inflow (MAF) into reservoir (m3/s)\n":412,"Developers":"SN Power","Sub-Basin (GIS Maps)\n":"Lower Myitnge","Status (labelled by IFC)":"MOU","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":12993,"Catchment Area (km2)\n":"25490","Sub-Basin (HP Chapter)\n":"Myitnge","Mean annual energy (GW)\n":"700","Total storage (FSL) (mil. m3)":"454","Notes":null,"River":"Lower Myitnge","Function":"HP","Country":"Norway","Location_L":96.87313,"Location_1":21.96024,"Status":"Proposed","Project Name":"Yeywa (middle)","COD Year":"2020","Project ID":"DAM0078","the_geom":"0101000020E610000004CAA65CE1375840A04FE449D2F53540"},{"_id":78,"Catchment  Annual Rainfall (mm)":"1270.000000","Total Powerplant Design Discharge (m3/s)\n":"127","Transmission Line Length (km)\n":"130","Transmission Line Voltage level (kV)\n":"230","Turbine Discharge/ Min Flow\n":4.2,"Transmission Line Connected to S/S\n":"Shwesaryan","Full Supply Level (FSL) (m)\n":"395","Powerhouse Type":"Above ground","Dam Type":"RCC","Reservoir Area (km2)\n":26.9,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":54,"Reservoir Live Storage (hm3)\n":"196","Reservoir Dead Storage (hm3)\n":"145","Reservoir Retention Period (days)\n":"6","Run-of-River or Storage":"S","Township":"Kyautme","Myanmar Selfuse (MW)\n":"280","% use MYA":1,"Export (MW)":"0","Height (m)":"97","Qmin/ MAF":0.32,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.57","Installed Capacity (MW)":"280","Financiers":"Sole Investment","GIS Rainfall\n":"1628","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":17.1,"District":"Pyinoolwin","Mean annual inflow (MAF) into reservoir (m3/s)\n":371,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Lower Myitnge","Status (labelled by IFC)":"Construction","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":11700,"Catchment Area (km2)\n":"21700","Sub-Basin (HP Chapter)\n":"Myitnge","Mean annual energy (GW)\n":"280","Total storage (FSL) (mil. m3)":"341","Notes":null,"River":"Lower Myitnge","Function":"HP","Country":"Myanmar","Location_L":97.04674,"Location_1":22.254093,"Status":"UC","Project Name":"Yeywa (upper)","COD Year":"2019","Project ID":"DAM0079","the_geom":"0101000020E61000007898F6CDFD4258407D24253D0C413640"},{"_id":79,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":"5325","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":4.8,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"215","Powerhouse Type":"Power House At Dam Toe","Dam Type":"RCC Gravity Dam","Reservoir Area (km2)\n":43.5,"Estimated No. Construction Workers (planned projects)\n":"11900","Total Length of Reservoir (km)\n":130,"Reservoir Live Storage (hm3)\n":"3330","Reservoir Dead Storage (hm3)\n":"7427","Reservoir Retention Period (days)\n":"11","Run-of-River or Storage":"S","Township":"Ywathit","Myanmar Selfuse (MW)\n":"400","% use MYA":0.1,"Export (MW)":"3600","Height (m)":"167","Qmin/ MAF":0.33,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.73","Installed Capacity (MW)":"4000","Financiers":"Foreign JV/BOT","GIS Rainfall\n":null,"Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":16.3,"District":"Bawlake","Mean annual inflow (MAF) into reservoir (m3/s)\n":3400,"Developers":"CDOI/STH","Sub-Basin (GIS Maps)\n":"Middle Thanlwin","Status (labelled by IFC)":"MOA","State/Region":"Kayah","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":107222,"Catchment Area (km2)\n":"208984","Sub-Basin (HP Chapter)\n":"Thanlwin Mainstem","Mean annual energy (GW)\n":"4000","Total storage (FSL) (mil. m3)":"10757","Notes":null,"River":"Thanlwin Mainstem","Function":"HP","Country":"PRC/MYA","Location_L":97.521255,"Location_1":19.13106,"Status":"Proposed","Project Name":"Ywathit","COD Year":"2030","Project ID":"DAM0275","the_geom":"0101000020E6100000E9F351465C615840B2D826158D213340"},{"_id":80,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"73","Transmission Line Voltage level (kV)\n":"66","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Kamarnat","Full Supply Level (FSL) (m)\n":"65","Powerhouse Type":null,"Dam Type":"Embankment","Reservoir Area (km2)\n":14.9,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":18.5,"Reservoir Live Storage (hm3)\n":"302","Reservoir Dead Storage (hm3)\n":"105","Reservoir Retention Period (days)\n":"61","Run-of-River or Storage":"S","Township":"Bago","Myanmar Selfuse (MW)\n":"20","% use MYA":1,"Export (MW)":"0","Height (m)":"45","Qmin/ MAF":0.07,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.43","Installed Capacity (MW)":"20","Financiers":"Sole Investment","GIS Rainfall\n":"3151","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":51.9,"District":"Bago","Mean annual inflow (MAF) into reservoir (m3/s)\n":57,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Bago","Status (labelled by IFC)":"Built","State/Region":"Bago","Basin":"Myit Mo Hka & Bago","Annual Runoff into Reservoir (hm3)":1798,"Catchment Area (km2)\n":"1098","Sub-Basin (HP Chapter)\n":"Bago","Mean annual energy (GW)\n":"20","Total storage (FSL) (mil. m3)":"407","Notes":null,"River":"Bago River","Function":"HP","Country":"Myanmar","Location_L":96.19898,"Location_1":17.755817,"Status":"Complete","Project Name":"Zaungtu","COD Year":"2000","Project ID":"DAM0081","the_geom":"0101000020E6100000B8239C16BC0C584067BAD7497DC13140"},{"_id":81,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"76","Transmission Line Voltage level (kV)\n":"66","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Aungthapye","Full Supply Level (FSL) (m)\n":"833","Powerhouse Type":"Above ground","Dam Type":null,"Reservoir Area (km2)\n":0,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":0,"Reservoir Live Storage (hm3)\n":"0","Reservoir Dead Storage (hm3)\n":"0","Reservoir Retention Period (days)\n":"0","Run-of-River or Storage":"RoR","Township":"Yaksauk","Myanmar Selfuse (MW)\n":"18","% use MYA":1,"Export (MW)":"0","Height (m)":"-","Qmin/ MAF":0.16,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":1.7,"Plant Factor":"0.22","Installed Capacity (MW)":"18","Financiers":"Sole Investment","GIS Rainfall\n":"1185","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":21.3,"District":"Taunggyi","Mean annual inflow (MAF) into reservoir (m3/s)\n":30,"Developers":"MoEE","Sub-Basin (GIS Maps)\n":"Zawgyi/Myogyi","Status (labelled by IFC)":"Built","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":946,"Catchment Area (km2)\n":"1406","Sub-Basin (HP Chapter)\n":"Myitnge","Mean annual energy (GW)\n":"18","Total storage (FSL) (mil. m3)":"-","Notes":null,"River":"Zawgyi River","Function":"HP","Country":"Myanmar","Location_L":96.90147,"Location_1":21.3833,"Status":"Complete","Project Name":"Zawgyi I","COD Year":"1995","Project ID":"DAM0082","the_geom":"0101000020E6100000CF143AAFB13958408A8EE4F21F623540"},{"_id":82,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":"23","Transmission Line Voltage level (kV)\n":"66","Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":"Zawgyi1","Full Supply Level (FSL) (m)\n":"653","Powerhouse Type":"Above ground","Dam Type":"Earth","Reservoir Area (km2)\n":38.5,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":8.2,"Reservoir Live Storage (hm3)\n":"516","Reservoir Dead Storage (hm3)\n":"123","Reservoir Retention Period (days)\n":"139","Run-of-River or Storage":"S","Township":"Yaksauk","Myanmar Selfuse (MW)\n":"12","% use MYA":1,"Export (MW)":"0","Height (m)":"44","Qmin/ MAF":0.16,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":"0.29","Installed Capacity (MW)":"12","Financiers":"Sole Investment","GIS Rainfall\n":"1185","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":22.4,"District":"Taunggyi","Mean annual inflow (MAF) into reservoir (m3/s)\n":42.8,"Developers":"MoEE/MOALI","Sub-Basin (GIS Maps)\n":"Zawgyi/Myogyi","Status (labelled by IFC)":"Built","State/Region":"Shan","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":1350,"Catchment Area (km2)\n":"1907","Sub-Basin (HP Chapter)\n":"Myitnge","Mean annual energy (GW)\n":"12","Total storage (FSL) (mil. m3)":"639","Notes":null,"River":"Zawgyi River","Function":"MP","Country":"Myanmar","Location_L":96.8726,"Location_1":21.5648,"Status":"Complete","Project Name":"Zawgyi II","COD Year":"2011","Project ID":"DAM0083","the_geom":"0101000020E6100000569FABADD8375840E3C798BB96903540"},{"_id":83,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":null,"Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":"ROR","Township":"Waingmaw","Myanmar Selfuse (MW)\n":"11","% use MYA":1,"Export (MW)":"0","Height (m)":null,"Qmin/ MAF":0.2,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":5.7,"Plant Factor":"0.58","Installed Capacity (MW)":"11","Financiers":"Local BOT","GIS Rainfall\n":"1828","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":49,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":14.2,"Developers":"Buga Co.","Sub-Basin (GIS Maps)\n":"Mali Creek","Status (labelled by IFC)":"Built","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":448,"Catchment Area (km2)\n":"290","Sub-Basin (HP Chapter)\n":"Mali Creek","Mean annual energy (GW)\n":"11","Total storage (FSL) (mil. m3)":null,"Notes":"Uncertain what kind of dam this is.","River":"Mali Creek","Function":"HP","Country":"Myanmar","Location_L":97.6135,"Location_1":24.98458,"Status":"Complete","Project Name":"Mali","COD Year":"2006","Project ID":"DAM0084","the_geom":"0101000020E61000002506819543675840B24B546F0DFC3840"},{"_id":84,"Catchment  Annual Rainfall (mm)":"2500.000000","Total Powerplant Design Discharge (m3/s)\n":"108","Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":7.1,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":"476","Powerhouse Type":"Above ground","Dam Type":"CG","Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"600","Total Length of Reservoir (km)\n":2.6,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":"ROR","Township":"Waingmaw","Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":"27","Qmin/ MAF":0.2,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":10,"Plant Factor":"0.5","Installed Capacity (MW)":"144","Financiers":"Foreign JV/BOT","GIS Rainfall\n":"1910","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":62.1,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":80,"Developers":"China Guodian/Tun Thwin Mining)","Sub-Basin (GIS Maps)\n":"Namtabak","Status (labelled by IFC)":"MOA","State/Region":"Kachin","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":2523,"Catchment Area (km2)\n":"1289","Sub-Basin (HP Chapter)\n":"Namtabak","Mean annual energy (GW)\n":"144","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Namtamhpak","Function":"HP","Country":"PRC/MYA","Location_L":97.65063,"Location_1":25.119755,"Status":"Proposed","Project Name":"Nam Tabak II","COD Year":"2027","Project ID":"DAM0157","the_geom":"0101000020E610000041B96DDFA369584051888043A81E3940"},{"_id":85,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"100","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":"30","% use MYA":null,"Export (MW)":"30","Height (m)":null,"Qmin/ MAF":0.15,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":0,"Plant Factor":null,"Installed Capacity (MW)":"30","Financiers":"Local BOT","GIS Rainfall\n":"1368","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":13.4,"District":"Mong Hsat","Mean annual inflow (MAF) into reservoir (m3/s)\n":21.2,"Developers":"Suntac Power Co.","Sub-Basin (GIS Maps)\n":"Nam Hkoke","Status (labelled by IFC)":"LocMoU","State/Region":"Shan","Basin":"Mekong","Annual Runoff into Reservoir (hm3)":669,"Catchment Area (km2)\n":"1284","Sub-Basin (HP Chapter)\n":"Nam Hkoke","Mean annual energy (GW)\n":"30","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Nam Hkoke","Function":"HP","Country":"Myanmar","Location_L":99.375,"Location_1":20.662222,"Status":"Proposed","Project Name":"Mong Hsat","COD Year":null,"Project ID":"DAM0086","the_geom":"0101000020E61000000000000000D8584014B1886187A93440"},{"_id":86,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"200","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":null,"Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"3018","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":86.8,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":6.6,"Developers":null,"Sub-Basin (GIS Maps)\n":"Chindwin Headwater 2","Status (labelled by IFC)":"Identified","State/Region":"Kachin","Basin":"Chindwin","Annual Runoff into Reservoir (hm3)":208,"Catchment Area (km2)\n":"76","Sub-Basin (HP Chapter)\n":"Chindwin Headwater 2","Mean annual energy (GW)\n":"50","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Nam Lanog Hka","Function":null,"Country":null,"Location_L":96.52987,"Location_1":26.309687,"Status":"Identified Sites","Project Name":"Tawog Hka","COD Year":null,"Project ID":"DAM0087","the_geom":"0101000020E61000006B48DC63E921584011FFB0A5474F3A40"},{"_id":87,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"600","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":null,"Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"2957","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":95.7,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":463,"Developers":null,"Sub-Basin (GIS Maps)\n":"Chindwin Headwater 1","Status (labelled by IFC)":"Identified","State/Region":"Kachin","Basin":"Chindwin","Annual Runoff into Reservoir (hm3)":14601,"Catchment Area (km2)\n":"4837","Sub-Basin (HP Chapter)\n":"Chindwin Headwater 1","Mean annual energy (GW)\n":"150","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Ta Rung Hka","Function":null,"Country":null,"Location_L":96.46829,"Location_1":26.718029,"Status":"Identified Sites","Project Name":"Ta Rung Hka","COD Year":null,"Project ID":"DAM0088","the_geom":"0101000020E6100000CEC29E76F81D58406094A0BFD0B73A40"},{"_id":88,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"100","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":null,"Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"3018","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":80.2,"District":"Myitkyina","Mean annual inflow (MAF) into reservoir (m3/s)\n":168,"Developers":null,"Sub-Basin (GIS Maps)\n":"Chindwin Headwater 2","Status (labelled by IFC)":"Identified","State/Region":"Kachin","Basin":"Chindwin","Annual Runoff into Reservoir (hm3)":5298,"Catchment Area (km2)\n":"2095","Sub-Basin (HP Chapter)\n":"Chindwin Headwater 2","Mean annual energy (GW)\n":"15","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Ta Nai Hka","Function":null,"Country":null,"Location_L":96.95008,"Location_1":26.294174,"Status":"Identified Sites","Project Name":"Ta Nai Hka","COD Year":null,"Project ID":"DAM0089","the_geom":"0101000020E61000005B25581CCE3C5840014D840D4F4B3A40"},{"_id":89,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"600","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":null,"Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"2081","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":22.2,"District":null,"Mean annual inflow (MAF) into reservoir (m3/s)\n":36,"Developers":null,"Sub-Basin (GIS Maps)\n":"Other Sittaung","Status (labelled by IFC)":"Identified","State/Region":"Kayin","Basin":"Sittaung","Annual Runoff into Reservoir (hm3)":1135,"Catchment Area (km2)\n":"1621","Sub-Basin (HP Chapter)\n":"Other Sittaung","Mean annual energy (GW)\n":"150","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Thauk Ye Khat","Function":null,"Country":null,"Location_L":96.71963,"Location_1":18.938587,"Status":"Identified Sites","Project Name":"Thauk Ye Khat 1","COD Year":null,"Project ID":"DAM0090","the_geom":"0101000020E6100000AB5AD2510E2E58406473D53C47F03240"},{"_id":90,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"400","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":null,"Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"1709","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":29.3,"District":"Panan","Mean annual inflow (MAF) into reservoir (m3/s)\n":40,"Developers":null,"Sub-Basin (GIS Maps)\n":"Yunzalin HPP","Status (labelled by IFC)":"Identified","State/Region":"Kayin","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":1261,"Catchment Area (km2)\n":"1365","Sub-Basin (HP Chapter)\n":"Yunzalin","Mean annual energy (GW)\n":"100","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":null,"Function":null,"Country":null,"Location_L":97.34081,"Location_1":18.29496,"Status":"Identified Sites","Project Name":"Yunzalin","COD Year":null,"Project ID":"DAM0091","the_geom":"0101000020E61000009609BFD4CF555840CFA0A17F824B3240"},{"_id":91,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"100","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":null,"Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"3137","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":45.7,"District":"Kawareik","Mean annual inflow (MAF) into reservoir (m3/s)\n":3.7,"Developers":null,"Sub-Basin (GIS Maps)\n":"Lam Pha HPP","Status (labelled by IFC)":"Identified","State/Region":"Kayin","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":117,"Catchment Area (km2)\n":"81","Sub-Basin (HP Chapter)\n":"Lam Pha","Mean annual energy (GW)\n":"20","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Lam Pha","Function":null,"Country":null,"Location_L":98.348755,"Location_1":16.305021,"Status":"Identified Sites","Project Name":"Lam Pha","COD Year":null,"Project ID":"DAM0092","the_geom":"0101000020E6100000FA0D130D52965840DD9733DB154E3040"},{"_id":92,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"800","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":null,"Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"2665","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":null,"District":"Mindat","Mean annual inflow (MAF) into reservoir (m3/s)\n":null,"Developers":null,"Sub-Basin (GIS Maps)\n":"Kaladan","Status (labelled by IFC)":"Identified","State/Region":"Chin","Basin":"Rakhine","Annual Runoff into Reservoir (hm3)":0,"Catchment Area (km2)\n":"1296","Sub-Basin (HP Chapter)\n":"Kaladan","Mean annual energy (GW)\n":"200","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Mi Chaung","Function":null,"Country":null,"Location_L":93.073494,"Location_1":21.334187,"Status":"Identified Sites","Project Name":"Mi Chaung","COD Year":null,"Project ID":"DAM0093","the_geom":"0101000020E6100000D95A5F24B444574094BF7B478D553540"},{"_id":93,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"50","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":null,"Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"2187","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":66.2,"District":"Hkamti","Mean annual inflow (MAF) into reservoir (m3/s)\n":629,"Developers":null,"Sub-Basin (GIS Maps)\n":"Uyu","Status (labelled by IFC)":"Identified","State/Region":"Sagaing","Basin":"Chindwin","Annual Runoff into Reservoir (hm3)":19836,"Catchment Area (km2)\n":"9495","Sub-Basin (HP Chapter)\n":"Uyu","Mean annual energy (GW)\n":"12","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Uyu","Function":null,"Country":null,"Location_L":95.29443,"Location_1":24.865948,"Status":"Identified Sites","Project Name":"U Yu Chaung","COD Year":null,"Project ID":"DAM0094","the_geom":"0101000020E61000006EFB1EF5D7D257405F09A4C4AEDD3840"},{"_id":94,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"100","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":null,"Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"2123","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":17.6,"District":"Myeik","Mean annual inflow (MAF) into reservoir (m3/s)\n":22,"Developers":null,"Sub-Basin (GIS Maps)\n":"Tanintharyi","Status (labelled by IFC)":"Identified","State/Region":"Tanintharyi","Basin":"Tanintharyi","Annual Runoff into Reservoir (hm3)":694,"Catchment Area (km2)\n":"1248","Sub-Basin (HP Chapter)\n":"Tanintharyi","Mean annual energy (GW)\n":"25","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Thein Kun","Function":null,"Country":null,"Location_L":99.33121,"Location_1":11.769949,"Status":"Identified Sites","Project Name":"Thein Kun Chaung","COD Year":null,"Project ID":"DAM0095","the_geom":"0101000020E610000063D1747632D55840022D5DC1368A2740"},{"_id":95,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"100","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":null,"Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"2123","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":32.6,"District":null,"Mean annual inflow (MAF) into reservoir (m3/s)\n":36,"Developers":null,"Sub-Basin (GIS Maps)\n":"Tanintharyi","Status (labelled by IFC)":"Identified","State/Region":"Tanintharyi","Basin":"Tanintharyi","Annual Runoff into Reservoir (hm3)":1135,"Catchment Area (km2)\n":"1104","Sub-Basin (HP Chapter)\n":"Tanintharyi","Mean annual energy (GW)\n":"20","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Tha Gyet","Function":null,"Country":null,"Location_L":99.22716,"Location_1":12.132896,"Status":"Identified Sites","Project Name":"Tha Gyet Chaung","COD Year":null,"Project ID":"DAM0096","the_geom":"0101000020E61000004E7B4ACE89CE5840D789CBF10A442840"},{"_id":96,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"200","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":null,"Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"2942","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":45,"District":null,"Mean annual inflow (MAF) into reservoir (m3/s)\n":2.7,"Developers":null,"Sub-Basin (GIS Maps)\n":"Glohong Kra HPP","Status (labelled by IFC)":"Identified","State/Region":"Tanintharyi","Basin":"Tanintharyi","Annual Runoff into Reservoir (hm3)":85,"Catchment Area (km2)\n":"60","Sub-Basin (HP Chapter)\n":"Glohong Kra","Mean annual energy (GW)\n":"40","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Glohong Kra","Function":null,"Country":null,"Location_L":98.85832,"Location_1":10.775209,"Status":"Identified Sites","Project Name":"Glohong Kra","COD Year":null,"Project ID":"DAM0097","the_geom":"0101000020E6100000CD57C9C7EEB658403621AD31E88C2540"},{"_id":97,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"40","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":null,"Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"3818","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":87.1,"District":"Kawareik","Mean annual inflow (MAF) into reservoir (m3/s)\n":2.7,"Developers":null,"Sub-Basin (GIS Maps)\n":"Myet Taw Chaung HPP","Status (labelled by IFC)":"Identified","State/Region":"Kayin","Basin":"Thanlwin","Annual Runoff into Reservoir (hm3)":85,"Catchment Area (km2)\n":"31","Sub-Basin (HP Chapter)\n":"Myet Taw Chaung","Mean annual energy (GW)\n":"10","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Myet Taw Chaung","Function":null,"Country":null,"Location_L":97.91577,"Location_1":15.682011,"Status":"Identified Sites","Project Name":"Myet Taw Chaung","COD Year":null,"Project ID":"DAM0098","the_geom":"0101000020E6100000336C94F59B7A58404606B98B305D2F40"},{"_id":98,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"100","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":null,"Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":null,"Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"1385","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":35.5,"District":"Thayet","Mean annual inflow (MAF) into reservoir (m3/s)\n":24,"Developers":null,"Sub-Basin (GIS Maps)\n":"Mindon HPP","Status (labelled by IFC)":"Identified","State/Region":"Magway","Basin":"Ayeyarwady","Annual Runoff into Reservoir (hm3)":757,"Catchment Area (km2)\n":"676","Sub-Basin (HP Chapter)\n":"Mindon","Mean annual energy (GW)\n":"18","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":null,"Function":null,"Country":null,"Location_L":94.71287,"Location_1":19.37089,"Status":"Identified Sites","Project Name":"Mindon","COD Year":null,"Project ID":"DAM0099","the_geom":"0101000020E61000008B1BB7989FAD5740D769A4A5F25E3340"},{"_id":99,"Catchment  Annual Rainfall (mm)":null,"Total Powerplant Design Discharge (m3/s)\n":null,"Transmission Line Length (km)\n":null,"Transmission Line Voltage level (kV)\n":null,"Turbine Discharge/ Min Flow\n":null,"Transmission Line Connected to S/S\n":null,"Full Supply Level (FSL) (m)\n":null,"Powerhouse Type":null,"Dam Type":null,"Reservoir Area (km2)\n":null,"Estimated No. Construction Workers (planned projects)\n":"200","Total Length of Reservoir (km)\n":null,"Reservoir Live Storage (hm3)\n":null,"Reservoir Dead Storage (hm3)\n":null,"Reservoir Retention Period (days)\n":null,"Run-of-River or Storage":null,"Township":"Thandwe","Myanmar Selfuse (MW)\n":null,"% use MYA":null,"Export (MW)":null,"Height (m)":null,"Qmin/ MAF":null,"Crest Length (m)":null,"Distance along river between dam and powerhouse (km)\n":null,"Plant Factor":"0.31","Installed Capacity (MW)":null,"Financiers":null,"GIS Rainfall\n":"2665","Max reservoir area (FSL) (km2)\n":null,"Unit Flow (l/s/km2)\n":null,"District":"Thandwe","Mean annual inflow (MAF) into reservoir (m3/s)\n":null,"Developers":null,"Sub-Basin (GIS Maps)\n":"Than Dwe HPP","Status (labelled by IFC)":"Identified","State/Region":"Rakhine","Basin":"Rakhine","Annual Runoff into Reservoir (hm3)":0,"Catchment Area (km2)\n":"738","Sub-Basin (HP Chapter)\n":"Than Dwe","Mean annual energy (GW)\n":"39","Total storage (FSL) (mil. m3)":null,"Notes":null,"River":"Than Dwe","Function":null,"Country":null,"Location_L":94.493904,"Location_1":18.386145,"Status":"Identified Sites","Project Name":"Than Dwe","COD Year":null,"Project ID":"DAM0100","the_geom":"0101000020E6100000755B22179C9F5740F08B4B55DA623240"}], "limit": 100, "_links": {"start": "/api/3/action/datastore_search?resource_id=22977a22-e225-40dd-8abc-20a54c6d20b4", "next": "/api/3/action/datastore_search?offset=100&resource_id=22977a22-e225-40dd-8abc-20a54c6d20b4"}, "total": 254, "total_estimation_threshold": null}}